MLF-adjusted revenue, dispatch, capacity factor, and estimated SRMC from AEMO 5‑minute dispatch data. Data through 04 Aug 2026, 11:25 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Murray 2 | MURRAY |
VIC1 | Hydro - Dam | $36.12M | $7.7k | 7,088.8 | 281,783.2 | 850,992.1 | 65.2% | $1.00 | View |
| Eraring | ER03 |
NSW1 | Turbine - Steam Sub Critical | $34.77M | $5.7k | 20,702.3 | 413,852.9 | 471,803.3 | 79.8% | $49.77 | View |
| Bayswater | BW03 |
NSW1 | Turbine - Steam Sub Critical | $32.54M | $7.8k | 7,135.6 | 397,842.1 | 474,646.5 | 80.7% | $28.68 | View |
| Bayswater | BW04 |
NSW1 | Turbine - Steam Sub Critical | $31.85M | $10.1k | 9,532.0 | 384,034.5 | 488,155.8 | 77.9% | $55.48 | View |
| Bayswater | BW02 |
NSW1 | Turbine - Steam Sub Critical | $31.83M | $10.0k | 9,091.9 | 384,315.8 | 487,604.2 | 77.9% | $26.23 | View |
| Bayswater | BW01 |
NSW1 | Turbine - Steam Sub Critical | $30.72M | $10.2k | 9,271.9 | 374,640.9 | 469,837.5 | 78.8% | $53.57 | View |
| Vales Point B | VP5 |
NSW1 | Turbine - Steam Sub Critical | $29.69M | $78 | 338.1 | 340,855.6 | 451,637.5 | 71.7% | $52.60 | View |
| Vales Point B | VP6 |
NSW1 | Turbine - Steam Sub Critical | $29.30M | $79 | 354.3 | 336,221.3 | 449,914.2 | 70.8% | $52.60 | View |
| Eraring | ER02 |
NSW1 | Turbine - Steam Sub Critical | $28.87M | $4.9k | 16,830.9 | 356,956.6 | 409,494.8 | 68.9% | $59.45 | View |
| Loy Yang B | LOYYB1 |
VIC1 | Turbine - Steam Sub Critical | $27.52M | $6.5k | 13,659.6 | 383,513.6 | 412,721.4 | 91.8% | $47.20 | View |
| Loy Yang B | LOYYB2 |
VIC1 | Turbine - Steam Sub Critical | $27.37M | $7.0k | 14,217.7 | 380,788.2 | 409,767.2 | 91.2% | $47.20 | View |
| Mt Piper | MP1 |
NSW1 | Turbine - Steam Sub Critical | $26.86M | $0 | — | 300,140.6 | 519,468.3 | 57.1% | $49.24 | View |
| Mt Piper | MP2 |
NSW1 | Turbine - Steam Sub Critical | $26.33M | $0 | — | 293,191.3 | 498,863.3 | 61.7% | $52.60 | View |
| Loy Yang A Power Station | LYA1 |
VIC1 | Turbine - Steam Sub Critical | $25.98M | $1.5k | 6,145.0 | 352,523.8 | 396,873.3 | 87.4% | $47.20 | View |
| Loy Yang A Power Station | LYA3 |
VIC1 | Turbine - Steam Sub Critical | $25.59M | $1.5k | 6,095.7 | 349,444.4 | 397,695.0 | 86.7% | $47.20 | View |
| Loy Yang A Power Station | LYA2 |
VIC1 | Turbine - Steam Sub Critical | $24.99M | $2.1k | 1,711.8 | 343,013.8 | 371,710.8 | 89.9% | $47.20 | View |
| Loy Yang A Power Station | LYA4 |
VIC1 | Turbine - Steam Sub Critical | $24.54M | $1.4k | 5,848.4 | 334,316.2 | 378,158.3 | 82.9% | $47.20 | View |
| Eraring | ER04 |
NSW1 | Turbine - Steam Sub Critical | $21.94M | $3.3k | 11,220.0 | 266,100.4 | 272,680.0 | 51.3% | $55.48 | View |
| Eraring | ER01 |
NSW1 | Turbine - Steam Sub Critical | $18.96M | $2.4k | 9,564.4 | 228,852.9 | 260,478.6 | 44.1% | $48.29 | View |
| Tarong North | TNPS1 |
QLD1 | Turbine - Steam Super Critical | $18.86M | $0 | — | 283,517.7 | 311,670.2 | 87.5% | $52.60 | View |
| Pelican Point | PPCCGT |
SA1 | Turbine - CCGT | $18.67M | $0 | — | 117,746.4 | 173,394.9 | 30.9% | $84.30 | View |
| Millmerran Power Plant | MPP_2 |
QLD1 | Turbine - Steam Super Critical | $18.54M | $0 | — | 277,476.4 | 302,279.3 | 90.5% | $52.60 | View |
| Millmerran Power Plant | MPP_1 |
QLD1 | Turbine - Steam Super Critical | $18.22M | $0 | — | 274,011.8 | 298,942.2 | 89.3% | $52.60 | View |
| Yallourn W | YWPS4 |
VIC1 | Turbine - Steam Sub Critical | $17.97M | $0 | — | 246,418.3 | 271,011.7 | 91.3% | $47.20 | View |
| Yallourn W | YWPS3 |
VIC1 | Turbine - Steam Sub Critical | $17.72M | $0 | — | 244,728.7 | 270,935.0 | 90.6% | $47.20 | View |
| Yallourn W | YWPS1 |
VIC1 | Turbine - Steam Sub Critical | $15.64M | $0 | — | 224,551.8 | 229,942.9 | 89.1% | $47.20 | View |
| Yallourn W | YWPS2 |
VIC1 | Turbine - Steam Sub Critical | $15.54M | $0 | — | 229,307.7 | 227,653.3 | 91.0% | $47.20 | View |
| Callide C | CPP_4 |
QLD1 | Turbine - Steam Super Critical | $15.47M | $0 | — | 238,824.0 | 287,710.0 | 79.0% | $101.94 | View |
| Tarong | TARONG#2 |
QLD1 | Turbine - Steam Sub Critical | $15.10M | $1.2k | 237.5 | 223,817.6 | 246,434.2 | 88.8% | $55.48 | View |
| Tarong | TARONG#1 |
QLD1 | Turbine - Steam Sub Critical | $14.53M | $1 | 0.5 | 211,779.2 | 230,651.7 | 84.0% | $52.60 | View |
| Tarong | TARONG#4 |
QLD1 | Turbine - Steam Sub Critical | $14.48M | $1.4k | 272.3 | 213,513.1 | 235,256.2 | 84.7% | $52.58 | View |
| Callide C | CPP_3 |
QLD1 | Turbine - Steam Super Critical | $13.35M | $0 | — | 212,510.9 | 240,870.8 | 69.6% | $44.41 | View |
| Kogan Creek | KPP_1 |
QLD1 | Turbine - Steam Super Critical | $13.19M | $0 | — | 191,793.8 | 216,764.5 | 35.8% | $52.60 | View |
| Upper Tumut | UPPTUMUT |
NSW1 | Hydro - Dam | $12.56M | $10.4k | 13,737.3 | 136,422.4 | 339,887.0 | 30.8% | $1.00 | View |
| Stanwell | STAN-2 |
QLD1 | Turbine - Steam Sub Critical | $11.14M | $2.7k | 527.9 | 167,204.0 | 235,877.1 | 63.6% | $52.60 | View |
| Osborne | OSB-AG |
SA1 | Turbine - CCGT | $11.06M | $0 | — | 80,722.4 | 85,459.7 | 62.3% | $84.30 | View |
| Callide B | CALL_B_2 |
QLD1 | Turbine - Steam Sub Critical | $10.97M | $82 | 125.8 | 177,291.7 | 238,642.5 | 70.4% | $55.48 | View |
| Callide B | CALL_B_1 |
QLD1 | Turbine - Steam Sub Critical | $10.90M | $52 | 64.1 | 178,393.6 | 244,227.9 | 70.8% | $32.60 | View |
| Stanwell | STAN-1 |
QLD1 | Turbine - Steam Sub Critical | $10.69M | $2.6k | 3,481.4 | 164,010.2 | 212,486.7 | 62.4% | $52.60 | View |
| Tarong | TARONG#3 |
QLD1 | Turbine - Steam Sub Critical | $10.53M | $0 | — | 160,847.4 | 177,207.5 | 63.8% | $55.48 | View |
| Mortlake | MORTLK11 |
VIC1 | Turbine - OCGT | $9.10M | $0 | — | 63,591.2 | 176,080.2 | 30.2% | $128.50 | View |
| Barker Inlet Power Station | BARKIPS1 |
SA1 | Reciprocating Engine - Spark ignition | $8.37M | $196 | 46.7 | 51,005.3 | 128,987.9 | 33.7% | $9.00 | View |
| Stanwell | STAN-4 |
QLD1 | Turbine - Steam Sub Critical | $8.05M | $0 | — | 132,762.5 | 146,588.7 | 50.5% | $52.60 | View |
| Gladstone | GSTONE4 |
QLD1 | Turbine - Steam Sub Critical | $7.68M | $55 | 9.0 | 117,187.1 | 191,916.2 | 58.1% | $52.60 | View |
| Catagunya / Liapootah / Wayatinah | LI_WY_CA |
TAS1 | Hydro - Dam | $7.50M | $1.8k | 2,365.9 | 99,025.8 | 128,858.1 | 77.8% | $1.05 | View |
| Gladstone | GSTONE1 |
QLD1 | Turbine - Steam Sub Critical | $7.48M | $0 | — | 115,580.6 | 189,817.5 | 57.3% | $52.99 | View |
| Gladstone | GSTONE6 |
QLD1 | Turbine - Steam Sub Critical | $7.43M | $43 | 7.5 | 114,835.7 | 189,367.5 | 57.0% | $54.96 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $7.41M | $0 | — | 115,171.5 | 115,058.5 | 17.3% | $0.58 | View |
| Tumut 3 | TUMUT3 |
NSW1 | Hydro - Dam | $6.87M | $4.2k | 9,041.7 | 65,530.5 | 1,199,226.9 | 6.1% | $1.05 | View |
| Mortlake | MORTLK12 |
VIC1 | Turbine - OCGT | $6.76M | $0 | — | 40,435.9 | 174,886.3 | 19.2% | $128.50 | View |
| Torrens Island B | TORRB2 |
SA1 | Turbine - Steam Sub Critical | $6.41M | $11.4k | 11,385.6 | 41,442.1 | 89,843.7 | 28.8% | $5.47 | View |
| Gordon | GORDON |
TAS1 | Hydro - Dam | $6.09M | $49.4k | 16,830.7 | 49,794.9 | 204,300.0 | 16.0% | $1.05 | View |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $6.07M | $0 | — | 90,132.3 | 89,442.2 | 31.6% | $0.50 | View |
| Bogong / Mackay | MCKAY1 |
VIC1 | Hydro - Dam | $5.91M | $0 | — | 39,630.3 | 199,397.3 | 18.3% | $1.00 | View |
| Darling Downs | DDPS1 |
QLD1 | Turbine - CCGT | $5.84M | $0 | — | 60,866.5 | 64,567.4 | 13.1% | $3.31 | View |
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $5.83M | $0 | — | 90,890.8 | 95,181.7 | 27.9% | $0.68 | View |
| Gladstone | GSTONE3 |
QLD1 | Turbine - Steam Sub Critical | $5.68M | $65 | 11.4 | 85,465.2 | 122,422.9 | 42.4% | $128.75 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $5.44M | $0 | — | 82,193.4 | 83,881.9 | 32.9% | $0.00 | View |
| John Butters | JBUTTERS |
TAS1 | Hydro - Dam | $5.42M | $28.4k | 14,338.7 | 57,612.3 | 100,211.1 | 55.6% | $0.00 | View |
| Reece | REECE1 |
TAS1 | Hydro - Dam | $5.21M | $4.2k | 3,617.3 | 70,882.2 | 79,314.7 | 85.2% | $1.00 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $5.12M | $0 | — | 53,186.8 | 52,955.0 | 27.4% | $0.50 | View |
| Tungatinah | TUNGATIN |
TAS1 | Hydro - Dam | $5.05M | $23.0k | 13,240.4 | 65,107.1 | 90,564.3 | 72.3% | $1.00 | View |
| Yarwun 1 | YARWUN_1 |
QLD1 | Turbine - CCGT | $4.95M | $0 | — | 82,115.2 | 117,163.3 | 63.4% | $84.30 | View |
| Tamar Valley Combined Cycle | TVCC201 |
TAS1 | Turbine - CCGT | $4.77M | $62 | 121.5 | 77,307.3 | 104,013.6 | 51.6% | $84.30 | View |
| Reece | REECE2 |
TAS1 | Hydro - Dam | $4.73M | $44.6k | 8,594.3 | 65,643.0 | 71,768.4 | 78.9% | $1.00 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $4.14M | $0 | — | 143,551.0 | 142,638.4 | 37.8% | $0.50 | View |
| Cethana | CETHANA |
TAS1 | Hydro - Dam | $3.98M | $21.0k | 8,539.2 | 47,682.7 | 68,456.6 | 77.9% | $1.09 | View |
| Trevallyn | TREVALLN |
TAS1 | Hydro - Dam | $3.75M | $19 | 37.9 | 39,343.0 | 68,031.3 | 58.8% | $1.00 | View |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $3.68M | $0 | — | 58,463.6 | 60,122.2 | 45.0% | $0.50 | View |
| Bastyan | BASTYAN |
TAS1 | Hydro - Dam | $3.60M | $3.4k | 1,593.3 | 48,550.9 | 55,683.5 | 84.4% | $0.00 | View |
| Mackintosh | MACKNTSH |
TAS1 | Hydro - Dam | $3.55M | $13.4k | 8,399.8 | 45,563.5 | 56,220.6 | 79.2% | $1.00 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $3.52M | $0 | — | 51,324.6 | 51,020.2 | 41.2% | $0.53 | View |
| Poatina | POAT220 |
TAS1 | Hydro - Dam | $3.24M | $8.5k | 1,702.5 | 17,685.8 | 45,453.3 | 12.3% | $1.00 | View |
| Torrens Island B | TORRB3 |
SA1 | Turbine - Steam Sub Critical | $3.10M | $5.7k | 6,232.0 | 19,284.0 | 46,763.5 | 13.4% | $2.00 | View |
| Quarantine | QPS5 |
SA1 | Turbine - OCGT | $3.09M | $0 | — | 17,819.0 | 88,748.9 | 19.3% | $209.05 | View |
| Gladstone | GSTONE2 |
QLD1 | Turbine - Steam Sub Critical | $3.00M | $0 | — | 44,621.4 | 57,328.4 | 22.1% | $49.17 | View |
| Newport | NPS |
VIC1 | Turbine - Steam Sub Critical | $2.99M | $0 | — | 4,507.3 | 6,365.1 | 1.3% | $2.00 | View |
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $2.92M | $0 | — | 44,262.8 | 44,406.1 | 24.4% | $0.50 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $2.84M | $0 | — | 42,491.2 | 42,572.1 | 33.7% | $0.50 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $2.82M | $0 | — | 37,681.8 | 38,269.9 | 26.3% | $0.50 | View |
| Devils Gate | DEVILS_G |
TAS1 | Hydro - Dam | $2.80M | $7.0k | 2,533.0 | 35,612.3 | 44,411.3 | 82.4% | $1.00 | View |
| Tribute | TRIBUTE |
TAS1 | Hydro - Dam | $2.79M | $38.9k | 5,774.4 | 33,165.3 | 48,181.1 | 55.6% | $1.00 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $2.60M | $0 | — | 39,947.5 | 40,121.5 | 35.4% | $0.00 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $2.59M | $0 | — | 55,194.7 | 57,423.6 | 36.7% | $0.55 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $2.55M | $0 | — | 42,134.8 | 41,643.9 | 25.8% | $0.65 | View |
| Eraring Big Battery | ERB01 |
NSW1 | Storage - Battery | $2.55M | $0 | — | -7,306.3 | 302,825.3 | -4.2% | $1.58 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $2.52M | $0 | — | 49,708.2 | 49,755.1 | 47.9% | $0.66 | View |
| Torrens Island B | TORRB4 |
SA1 | Turbine - Steam Sub Critical | $2.50M | $4.9k | 5,680.3 | 18,575.4 | 35,473.4 | 12.9% | $2.00 | View |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $2.45M | $0 | — | 74,189.0 | 83,039.6 | 24.5% | $0.50 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $2.42M | $0 | — | 49,808.3 | 49,782.3 | 41.2% | $0.50 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $2.39M | $0 | — | 38,274.2 | 37,785.9 | 32.1% | $0.53 | View |
| Somerton | AGLSOM |
VIC1 | Turbine - OCGT | $2.37M | $0 | — | 11,239.4 | 103,078.7 | 9.2% | $128.50 | View |
| Wellington North Solar Farm (Lightsource) | WELNSF1 |
NSW1 | Solar PV - Single axis tracking | $2.36M | $0 | — | 46,657.0 | 46,516.0 | 14.8% | $0.25 | View |
| Snapper Point Power Station | SNAPPER1 |
SA1 | Turbine - OCGT | $2.25M | $0 | — | 3,851.3 | 104,510.8 | 3.5% | $128.50 | View |
| Tarraleah | TARRALEA |
TAS1 | Hydro - Dam | $2.24M | $0 | — | 35,309.1 | 34,829.8 | 54.5% | $1.00 | View |
| Fisher | FISHER |
TAS1 | Hydro - Dam | $2.24M | $8.5k | 3,103.7 | 31,795.3 | 32,756.7 | 100.0% | $1.05 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $2.16M | $0 | — | 76,688.1 | 80,425.6 | 34.1% | $0.50 | View |
| Culcairn Solar Farm | CUSF1 |
NSW1 | Solar PV - Single axis tracking | $2.16M | $0 | — | 42,042.0 | 44,801.2 | 16.7% | $0.25 | View |
| West Kiewa | WKIEWA1 |
VIC1 | Hydro - Dam | $2.12M | $0 | — | 23,864.3 | 39,116.3 | 97.5% | $10.00 | View |
| Western Downs Green Power Hub P/L | WDGPH1 |
QLD1 | Solar PV - Single axis tracking | $2.09M | $111 | 16.0 | 71,652.4 | 70,892.2 | 24.9% | $0.32 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $2.07M | $0 | — | 31,498.9 | 31,774.6 | 27.5% | $0.00 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $2.05M | $0 | — | 41,256.1 | 51,120.3 | 28.2% | $0.00 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $2.01M | $0 | — | 30,710.0 | 30,695.2 | 30.1% | $0.53 | View |
| Orana BESS | ORABESS1 |
NSW1 | Storage - Battery | $1.99M | $1.0k | 823.8 | -4,024.2 | 275,849.2 | -1.3% | $1.50 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $1.97M | $0 | — | 29,540.7 | 29,213.6 | 37.1% | $0.50 | View |
| Supernode BESS | SNB02 |
QLD1 | Storage - Battery | $1.96M | $441 | 45.7 | -4,007.8 | 168,436.1 | -2.1% | $1.50 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $1.88M | $0 | — | 29,356.2 | 29,233.0 | 36.1% | $0.00 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $1.83M | $0 | — | 57,270.9 | 58,307.1 | 36.4% | $0.50 | View |
| Ladbroke Grove | LADBROK2 |
SA1 | Turbine - OCGT | $1.82M | $0 | — | 10,577.2 | 28,888.2 | 36.7% | $145.06 | View |
| Wollar Solar Farm | WOLARSF1 |
NSW1 | Solar PV - Single axis tracking | $1.79M | $0 | — | 35,782.1 | 35,222.5 | 17.7% | $0.25 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $1.77M | $0 | — | 26,998.7 | 26,852.6 | 36.2% | $0.58 | View |
| SHOAL1 | SHOAL1 |
NSW1 | $1.76M | $0 | — | 22,008.7 | — | 12.4% | $1.20 | View | |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $1.76M | $0 | — | 30,428.5 | 38,089.4 | 26.6% | $0.86 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $1.73M | $0 | — | 22,305.6 | 22,270.0 | 27.4% | $0.68 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $1.72M | $0 | — | 52,987.8 | 65,823.6 | 29.7% | $0.00 | View |
| Stubbo Solar Farm | STUBSF2 |
NSW1 | Solar PV - Single axis tracking | $1.72M | $0 | — | 33,050.5 | 32,739.0 | 22.7% | $0.25 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $1.69M | $0 | — | 37,038.2 | 37,017.3 | 46.1% | $0.66 | View |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $1.68M | $0 | — | 22,862.9 | 22,824.8 | 21.8% | $0.58 | View |
| Hallett GT | AGLHAL |
SA1 | Turbine - OCGT | $1.67M | $0 | — | 3,884.0 | 105,039.0 | 1.9% | $100.22 | View |
| Stubbo Solar Farm | STUBSF1 |
NSW1 | Solar PV - Single axis tracking | $1.66M | $0 | — | 31,991.5 | 31,668.8 | 22.4% | $0.25 | View |
| Meadowbank | MEADOWBK |
TAS1 | Hydro - Dam | $1.65M | $327 | 185.0 | 21,555.9 | 30,916.2 | 74.8% | $1.00 | View |
| Ladbroke Grove | LADBROK1 |
SA1 | Turbine - OCGT | $1.64M | $0 | — | 9,206.2 | 29,787.2 | 32.0% | $153.02 | View |
| Lemonthyme / Wilmot | LEM_WIL |
TAS1 | Hydro - Dam | $1.61M | $5.6k | 1,335.5 | 22,728.2 | 23,067.8 | 38.7% | $1.00 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $1.56M | $0 | — | 24,781.4 | 24,362.9 | 32.2% | $0.50 | View |
| Aldoga Solar Farm | ALDGASF1 |
QLD1 | Solar PV - Single axis tracking | $1.55M | $0 | — | 60,232.8 | 61,090.6 | 21.6% | $0.00 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $1.54M | $0 | — | 62,303.6 | 63,582.5 | 34.9% | $0.50 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $1.52M | $0 | — | 51,209.3 | 64,989.8 | 27.3% | $0.50 | View |
| Darlington Point Solar Farm | DARLSF1 |
NSW1 | Solar PV - Single axis tracking | $1.51M | $0 | — | 31,454.1 | 31,877.6 | 15.9% | $0.33 | View |
| Goorambat East Solar Farm (ENGIE) | GOESF1 |
VIC1 | Solar PV - Single axis tracking | $1.46M | $0 | — | 26,118.2 | 29,787.3 | 14.5% | $0.25 | View |
| Rangebank BESS | RANGEB1 |
VIC1 | Storage - Battery | $1.44M | $68 | 154.1 | -2,605.7 | 111,601.0 | -1.8% | $1.50 | View |
| Bolivar Power Station | BOLIVPS1 |
SA1 | Turbine - OCGT | $1.38M | $0 | — | 3,040.8 | 3,579.5 | 3.3% | $151.37 | View |
| Dartmouth | DARTM1 |
VIC1 | Hydro - Dam | $1.37M | $0 | — | 5,456.3 | 102,861.5 | 4.1% | $0.00 | View |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $1.34M | $0 | — | 49,435.2 | 50,710.0 | 38.0% | $0.50 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $1.32M | $0 | — | 19,745.4 | 19,680.7 | 32.3% | $0.00 | View |
| Waratah Super Battery | WTAHB1 |
NSW1 | Storage - Battery | $1.31M | $0 | — | -6,247.5 | 278,116.1 | -1.0% | $1.50 | View |
| Koorangie Energy Storage System | KESSB1 |
VIC1 | Storage - Battery | $1.29M | $0 | — | -1,994.8 | 101,555.8 | -1.5% | $1.50 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $1.28M | $0 | — | 21,134.3 | 20,855.7 | 30.6% | $0.69 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $1.24M | $0 | — | 25,527.0 | 27,320.6 | 26.8% | $0.80 | View |
| New England Solar Farm | NEWENSF2 |
NSW1 | Solar PV - Single axis tracking | $1.22M | $0 | — | 25,116.7 | 24,728.7 | 17.4% | $0.25 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $1.22M | $0 | — | 34,112.8 | 48,470.4 | 28.2% | $0.66 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $1.22M | $0 | — | 31,427.2 | 31,064.7 | 40.9% | $0.00 | View |
| Avonlie Solar Farm | AVLSF1 |
NSW1 | Solar PV - Single axis tracking | $1.21M | $0 | — | 25,537.4 | 25,355.4 | 14.0% | $0.00 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $1.20M | $0 | — | 27,057.7 | 35,465.3 | 16.7% | $0.50 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $1.20M | $0 | — | 20,135.7 | — | 19.9% | $0.00 | View |
| New England Solar Farm | NEWENSF1 |
NSW1 | Solar PV - Single axis tracking | $1.17M | $0 | — | 23,918.8 | 23,504.2 | 16.6% | $0.25 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $1.16M | $0 | — | 29,632.7 | 31,838.6 | 42.6% | $0.00 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $1.14M | $0 | — | 29,170.3 | — | 29.4% | $0.53 | View |
| Tarong BESS - Stanwell | TARBESS1 |
QLD1 | Storage - Battery | $1.14M | $8.9k | 184,035.0 | -2,394.9 | 150,851.2 | -1.1% | $1.50 | View |
| Limondale Solar Farm 1 | LIMOSF11 |
NSW1 | Solar PV - Single axis tracking | $1.13M | $0 | — | 24,480.8 | 24,725.6 | 14.8% | $0.25 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $1.12M | $0 | — | 39,562.8 | 39,390.2 | 34.9% | $0.50 | View |
| Swanbank BESS | SWANBBF1 |
QLD1 | Storage - Battery | $1.12M | $0 | — | -2,251.1 | 97,292.1 | -1.3% | $1.50 | View |
| Suntop Solar Farm | SUNTPSF1 |
NSW1 | Solar PV - Single axis tracking | $1.10M | $0 | — | 21,012.8 | 23,563.2 | 19.5% | $0.25 | View |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $1.09M | $0 | — | 28,425.0 | 28,433.4 | 30.2% | $0.50 | View |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $1.09M | $0 | — | 30,753.4 | — | 28.2% | $0.50 | View |
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $1.08M | $0 | — | 17,545.6 | 20,384.5 | 12.1% | $0.50 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $1.06M | $0 | — | 22,005.7 | 22,000.5 | 29.8% | $0.50 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $1.01M | $0 | — | 33,582.4 | 35,225.7 | 22.3% | $0.50 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $1.01M | $0 | — | 21,938.0 | 21,932.2 | 27.2% | $0.68 | View |
| Gunnedah Solar Farm | GNNDHSF1 |
NSW1 | Solar PV - Single axis tracking | $996.5k | $0 | — | 20,226.0 | 20,560.8 | 25.5% | $0.33 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $973.9k | $0 | — | 20,659.9 | 22,270.0 | 30.4% | $0.71 | View |
| Kiamal Solar Farm - Stage 1 | KIAMSF1 |
VIC1 | Solar PV - Single axis tracking | $966.3k | $0 | — | 22,865.5 | 22,881.0 | 15.9% | $0.00 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $963.1k | $0 | — | 24,374.2 | 24,392.3 | 28.3% | $0.50 | View |
| Sunraysia Solar Farm | SUNRSF1 |
NSW1 | Solar PV - Single axis tracking | $945.1k | $0 | — | 20,616.0 | 20,629.0 | 12.5% | $0.25 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $932.2k | $0 | — | 26,110.4 | 36,163.8 | 29.8% | $0.53 | View |
| Bungala Two Solar Farm | BNGSF2 |
SA1 | Solar PV - Single axis tracking | $916.8k | $0 | — | 14,754.5 | 15,083.8 | 15.2% | $0.33 | View |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $915.7k | $0 | — | 27,260.0 | — | 19.7% | $0.50 | View |
| Wellington Solar Farm | WELLSF1 |
NSW1 | Solar PV - Single axis tracking | $915.1k | $0 | — | 18,999.0 | 20,917.3 | 12.2% | $0.25 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $906.0k | $0 | — | 29,361.6 | 29,013.7 | 29.4% | $0.50 | View |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $902.4k | $0 | — | 32,843.9 | 34,123.8 | 31.6% | $0.50 | View |
| Supernode BESS | SNB01 |
QLD1 | Storage - Battery | $899.6k | $3.0k | 945.7 | -2,534.9 | 153,137.6 | -1.4% | $1.50 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $881.4k | $0 | — | 19,272.8 | 19,267.3 | 26.1% | $0.69 | View |
| Coleambally Solar Farm | COLEASF1 |
NSW1 | Solar PV - Single axis tracking | $856.4k | $0 | — | 17,990.8 | 17,786.2 | 16.6% | $0.00 | View |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $855.1k | $0 | — | 29,602.9 | 31,129.5 | 37.7% | $0.65 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $854.8k | $0 | — | 15,884.1 | 18,804.6 | 27.4% | $0.79 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $853.3k | $0 | — | 13,172.6 | 13,041.2 | 39.3% | $0.50 | View |
| Kareeya | KAREEYA1 |
QLD1 | Hydro - Run of River | $852.7k | $0 | — | 13,759.0 | 13,957.0 | 88.5% | $1.00 | View |
| Kareeya | KAREEYA3 |
QLD1 | Hydro - Run of River | $852.4k | $7 | 0.9 | 13,781.4 | 13,957.0 | 88.6% | $1.05 | View |
| Kareeya | KAREEYA4 |
QLD1 | Hydro - Run of River | $852.1k | $0 | — | 13,717.9 | 13,957.0 | 88.2% | $1.66 | View |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $846.4k | $0 | — | 27,277.2 | 29,922.5 | 28.9% | $0.50 | View |
| Guthega | GUTHEGA |
NSW1 | Hydro - Dam | $844.0k | $0 | — | 8,922.4 | 48,325.3 | 20.7% | $1.05 | View |
| Moranbah North | MBAHNTH |
QLD1 | Reciprocating Engine - Spark ignition | $840.6k | $0 | — | 13,389.8 | — | 29.1% | $57.00 | View |
| Quarantine | QPS1 |
SA1 | Turbine - OCGT | $838.0k | $0 | — | 3,739.4 | 18,724.3 | 17.9% | $128.50 | View |
| Columboola Solar Farm | COLUMSF1 |
QLD1 | Solar PV - Single axis tracking | $833.6k | $0 | — | 29,907.7 | 29,499.2 | 19.1% | $0.32 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $829.5k | $0 | — | 25,390.4 | 25,401.9 | 28.0% | $0.74 | View |
| Barron Gorge | BARRON-1 |
QLD1 | Hydro - Run of River | $818.5k | $0 | — | 10,622.5 | 18,380.2 | 42.2% | $0.00 | View |
| Brendale BESS | BRNDBES1 |
QLD1 | Storage - Battery | $811.3k | $14.3k | 6,896.3 | -3,504.7 | 128,807.7 | -2.4% | $1.58 | View |
| Metz Solar Farm | METZSF1 |
NSW1 | Solar PV - Single axis tracking | $810.9k | $0 | — | 16,825.3 | 16,564.1 | 17.3% | $0.25 | View |
| Quarantine | QPS3 |
SA1 | Turbine - OCGT | $799.7k | $0 | — | 3,436.0 | 18,725.6 | 16.5% | $128.50 | View |
| Western Downs Gas Peaking Plant - KCI | WDBESS2 |
QLD1 | Turbine - CCGT | $794.2k | $38.3k | 26,537.6 | -4,311.4 | 162,401.5 | -1.5% | $2.00 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $788.3k | $0 | — | 14,716.7 | 17,101.9 | 16.2% | $0.50 | View |
| Nyngan Solar Plant | NYNGAN1 |
NSW1 | Solar PV - Fixed | $776.8k | $0 | — | 14,232.2 | 16,252.1 | 19.4% | $0.20 | View |
| Tailem Bend - Solar | TBSF1 |
SA1 | Solar PV - Fixed | $775.0k | $0 | — | 12,016.7 | 12,751.6 | 15.5% | $0.20 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $773.5k | $0 | — | 12,780.5 | 12,561.9 | 30.8% | $0.76 | View |
| Edenvale Solar Park | EDENVSF1 |
QLD1 | Solar PV - Single axis tracking | $761.4k | $0 | — | 28,195.5 | 27,960.6 | 21.8% | $0.00 | View |
| Repulse | REPULSE |
TAS1 | Hydro - Dam | $758.3k | $0 | — | 12,450.5 | — | 61.8% | $1.00 | View |
| Western Downs Battery - Stage 1 And 2 | WDBESS1 |
QLD1 | Storage - Battery | $755.1k | $28.3k | 15,488.6 | -4,030.1 | 164,151.2 | -2.2% | $1.58 | View |
| Uranquinty | URANQ13 |
NSW1 | Turbine - OCGT | $704.9k | $0 | — | 4,713.9 | 105,915.7 | 3.8% | $128.50 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $700.4k | $0 | — | 11,337.9 | 14,954.8 | 29.2% | $0.50 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $699.4k | $0 | — | 11,298.4 | 11,102.9 | 32.5% | $0.50 | View |
| Broadwater | BWTR1 |
NSW1 | Turbine - Steam Sub Critical | $694.8k | $0 | — | 9,063.0 | — | 33.1% | $124.22 | View |
| Walla Walla Solar Farm | WLWLSF1 |
NSW1 | Solar PV - Single axis tracking | $691.9k | $0 | — | 13,669.8 | 15,122.1 | 12.5% | $0.25 | View |
| Nevertire Solar Farm | NEVERSF1 |
NSW1 | Solar PV - Single axis tracking | $691.2k | $0 | — | 14,040.7 | 15,159.3 | 18.6% | $0.25 | View |
| Walla Walla Solar Farm | WLWLSF2 |
NSW1 | Solar PV - Single axis tracking | $690.4k | $0 | — | 13,704.7 | 15,156.1 | 12.5% | $0.25 | View |
| Paloona | PALOONA |
TAS1 | Hydro - Dam | $686.0k | $0 | — | 10,913.0 | — | 54.1% | $1.00 | View |
| Wandoan South Solar Stage 1 | WANDSF1 |
QLD1 | Solar PV - Single axis tracking | $679.3k | $0 | — | 17,050.2 | 23,142.3 | 14.8% | $0.25 | View |
| Port Augusta Renewable Energy Park - Solar | PAREPS1 |
SA1 | Solar PV - Fixed | $677.4k | $0 | — | 9,679.3 | 11,434.6 | 13.6% | $0.20 | View |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $672.3k | $0 | — | 9,922.9 | 11,362.8 | 22.2% | $0.53 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $671.7k | $0 | — | 27,379.7 | 28,182.6 | 15.8% | $0.00 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $669.3k | $0 | — | 29,143.9 | 29,369.5 | 19.8% | $0.00 | View |
| Swanbank E GT | SWAN_E |
QLD1 | Turbine - CCGT | $656.0k | $0 | — | 5,090.6 | 5,910.1 | 1.8% | $2.00 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $641.3k | $0 | — | 22,914.9 | 22,921.0 | 22.1% | $0.50 | View |
| Glenrowan West Solar Farm | GLRWNSF1 |
VIC1 | Solar PV - Single axis tracking | $637.3k | $0 | — | 12,266.5 | 12,656.9 | 12.9% | $0.32 | View |
| Bungala One Solar Farm | BNGSF1 |
SA1 | Solar PV - Single axis tracking | $636.6k | $0 | — | 10,446.6 | 10,308.6 | 10.7% | $0.34 | View |
| Greenbank BESS | GREENB1 |
QLD1 | Storage - Battery | $632.2k | $3.8k | 54,278.5 | -2,094.1 | 110,582.4 | -1.5% | $1.54 | View |
| Hillston Sun Farm | HILLSTN1 |
NSW1 | Solar PV - Single axis tracking | $630.9k | $0 | — | 12,827.5 | 12,753.9 | 16.2% | $0.00 | View |
| Woolooga Solar Farm | WOOLGSF1 |
QLD1 | Solar PV - Single axis tracking | $630.0k | $0 | — | 22,118.0 | 23,598.6 | 13.8% | $0.25 | View |
| Glenellen Solar Farm | GESF1 |
NSW1 | Solar PV - Fixed | $625.1k | $0 | — | 11,756.0 | 14,156.0 | 6.3% | $0.00 | View |
| Glenrowan Solar Farm | GLENSF1 |
VIC1 | Solar PV - Single axis tracking | $615.0k | $0 | — | 12,367.5 | 12,273.3 | 13.6% | $0.25 | View |
| Beryl Solar Farm | BERYLSF1 |
NSW1 | Solar PV - Single axis tracking | $587.8k | $0 | — | 11,829.6 | 11,718.6 | 16.7% | $0.25 | View |
| Ulinda Park BESS | ULPBESS1 |
QLD1 | Storage - Battery | $587.2k | $13.4k | 6,360.5 | -3,421.2 | 105,214.1 | -3.1% | $1.50 | View |
| Numurkah Solar Farm | NUMURSF1 |
VIC1 | Solar PV - Single axis tracking | $586.9k | $0 | — | 11,196.7 | 12,194.3 | 15.4% | $0.25 | View |
| Bairnsdale | BDL01 |
VIC1 | Turbine - OCGT | $580.6k | $0 | — | 2,302.7 | 31,217.2 | 6.8% | $142.10 | View |
| Barron Gorge | BARRON-2 |
QLD1 | Hydro - Run of River | $580.4k | $0 | — | 6,631.5 | 11,240.6 | 26.3% | $0.00 | View |
| BRDDSF01 | BRDDSF01 |
QLD1 | $579.8k | $0 | — | 25,739.9 | 28,665.9 | 9.7% | $0.27 | View | |
| Tamar Valley Peaking | TVPP104 |
TAS1 | Turbine - OCGT | $578.2k | $0 | — | 1,834.1 | 22,252.8 | 4.4% | $128.50 | View |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $570.5k | $0 | — | 16,655.1 | 19,231.7 | 23.4% | $0.50 | View |
| Sebastopol Solar Farm | SEBSF1 |
NSW1 | Solar PV - Single axis tracking | $568.4k | $0 | — | 10,967.6 | 11,241.9 | 16.9% | $0.25 | View |
| West Wyalong Solar Farm | WSTWYSF1 |
NSW1 | Solar PV - Single axis tracking | $557.1k | $0 | — | 10,941.8 | 11,222.7 | 14.4% | $0.25 | View |
| Gangarri Solar Farm | GANGARR1 |
QLD1 | Solar PV - Single axis tracking | $554.9k | $0 | — | 17,214.0 | 18,201.2 | 14.8% | $0.26 | View |
| Tallawarra | TALWA1 |
NSW1 | Turbine - CCGT | $554.5k | $0 | — | 5,324.8 | 6,915.4 | 1.8% | $84.30 | View |
| Condong | CONDONG1 |
NSW1 | Turbine - Steam Sub Critical | $550.2k | $0 | — | 7,424.8 | — | 34.4% | $112.12 | View |
| Daydream Solar Farm | DAYDSF1 |
QLD1 | Solar PV - Single axis tracking | $545.7k | $0 | — | 20,090.0 | 20,141.5 | 16.6% | $0.00 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $544.7k | $0 | — | 19,142.4 | 20,520.4 | 31.8% | $0.53 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $540.8k | $0 | — | 10,894.2 | 12,693.2 | 17.5% | $0.50 | View |
| Limondale BESS | LIMBESS1 |
NSW1 | Storage - Battery | $537.5k | $0 | — | -1,289.9 | 34,811.2 | -3.6% | $1.50 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $536.3k | $0 | — | 12,559.0 | 13,611.1 | 24.4% | $0.00 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $530.6k | $0 | — | 10,077.6 | 10,674.0 | 30.4% | $0.50 | View |
| Kareeya | KAREEYA2 |
QLD1 | Hydro - Run of River | $519.7k | $0 | — | 8,273.3 | 8,351.8 | 53.2% | $1.00 | View |
| Uranquinty | URANQ14 |
NSW1 | Turbine - OCGT | $504.3k | $0 | — | 3,200.5 | 104,746.3 | 2.6% | $128.50 | View |
| Bluegrass Solar Farm | BLUEGSF1 |
QLD1 | Solar PV - Single axis tracking | $502.9k | $0 | — | 18,321.0 | 18,057.6 | 17.2% | $0.29 | View |
| SHGEN | SHGEN |
NSW1 | $491.0k | $0 | — | 4,576.7 | 39,070.0 | 2.6% | $1.20 | View | |
| Goonumbla Solar Farm | GOONSF1 |
NSW1 | Solar PV - Single axis tracking | $479.3k | $0 | — | 9,251.5 | 9,640.4 | 18.4% | $0.25 | View |
| Haughton Solar Farm Stage 1 | HAUGHT11 |
QLD1 | Solar PV - Single axis tracking | $471.5k | $0 | — | 17,298.9 | 17,157.6 | 18.1% | $0.00 | View |
| Mannum BESS | MANNUMB1 |
SA1 | Storage - Battery | $466.4k | $5.8k | 332.1 | -1,026.0 | 69,414.3 | -1.4% | $1.50 | View |
| Bomen Solar Farm | BOMENSF1 |
NSW1 | Solar PV - Single axis tracking | $463.8k | $0 | — | 9,121.4 | 9,163.7 | 10.5% | $0.25 | View |
| Munna Creek Solar Farm | MUCRKSF1 |
QLD1 | Solar PV - Single axis tracking | $463.6k | $0 | — | 14,401.7 | 17,354.5 | 13.0% | $0.25 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $462.6k | $0 | — | 7,148.0 | 7,094.2 | 23.0% | $0.68 | View |
| Wemen Solar Farm | WEMENSF1 |
VIC1 | Solar PV - Single axis tracking | $461.6k | $0 | — | 10,482.3 | 10,569.3 | 14.9% | $0.25 | View |
| Eildon | EILDON2 |
VIC1 | Hydro - Dam | $458.8k | $0 | — | 2,640.7 | 27,852.3 | 5.4% | $1.00 | View |
| Sun Metals Corporation Solar Farm | SMCSF1 |
QLD1 | Solar PV - Fixed | $455.7k | $0 | — | 16,218.9 | 17,305.9 | 15.8% | $0.00 | View |
| Cluny | CLUNY |
TAS1 | Hydro - Dam | $455.0k | $0 | — | 7,546.4 | — | 55.2% | $1.00 | View |
| Poatina | POAT110 |
TAS1 | Hydro - Dam | $449.1k | $84.2k | 5,684.6 | 3,891.3 | 11,085.0 | 5.4% | $1.00 | View |
| Uranquinty | URANQ11 |
NSW1 | Turbine - OCGT | $448.0k | $0 | — | 2,840.8 | 105,142.5 | 2.3% | $128.50 | View |
| Karadoc Solar Farm | KARSF1 |
VIC1 | Solar PV - Single axis tracking | $443.7k | $0 | — | 9,974.6 | 10,281.3 | 13.3% | $0.00 | View |
| Winton Solar Farm | WINTSF1 |
VIC1 | Solar PV - Single axis tracking | $439.0k | $0 | — | 9,013.1 | 8,954.3 | 14.7% | $0.25 | View |
| Darling Downs Solar Farm | DDSF1 |
QLD1 | Solar PV - Fixed | $437.9k | $0 | — | 17,322.1 | 17,076.0 | 19.9% | $0.28 | View |
| Ross River Solar Farm | RRSF1 |
QLD1 | Solar PV - Single axis tracking | $436.6k | $0 | — | 17,475.8 | 18,051.6 | 19.0% | $0.25 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $436.6k | $0 | — | 7,562.7 | 9,195.9 | 26.9% | $0.53 | View |
| Victorian Big Battery | VBB1 |
VIC1 | Storage - Battery | $435.6k | $11.5k | 10,215.9 | -5,109.7 | 126,496.7 | -2.4% | $1.50 | View |
| Girgarre Solar Farm | GIRGSF |
VIC1 | Solar PV - Single axis tracking | $433.7k | $0 | — | 8,484.6 | 9,088.8 | 12.6% | $0.00 | View |
| Lake Echo | LK_ECHO |
TAS1 | Hydro - Dam | $432.7k | $0 | — | 3,055.0 | 5,252.4 | 13.1% | $1.17 | View |
| Clare Solar Farm | CLARESF1 |
QLD1 | Solar PV - Single axis tracking | $421.5k | $0 | — | 13,246.2 | 16,222.7 | 16.7% | $0.00 | View |
| Wyalong Solar Farm | WYASF1 |
NSW1 | Solar PV - Single axis tracking | $419.1k | $0 | — | 8,196.7 | 8,496.5 | 18.3% | $0.25 | View |
| Gunsynd Solar Farm | GUSF1 |
QLD1 | Solar PV - Fixed | $413.0k | $0 | — | 14,206.4 | 14,634.1 | 21.0% | $0.00 | View |
| Yarranlea Solar Farm | YARANSF1 |
QLD1 | Solar PV - Single axis tracking | $412.0k | $0 | — | 12,812.0 | 14,604.7 | 14.7% | $0.25 | View |
| LaTrobe Valley BESS | LVES1 |
VIC1 | Storage - Battery | $411.2k | $6.1k | 147,949.7 | -1,515.6 | 62,562.5 | -2.1% | $1.54 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $410.5k | $0 | — | 13,015.3 | 13,346.6 | 19.9% | $0.50 | View |
| Wunghnu Solar Farm | WUNUSF1 |
VIC1 | Solar PV - Single axis tracking | $403.1k | $0 | — | 7,727.2 | 8,569.7 | 11.5% | $0.25 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $402.2k | $0 | — | 15,413.7 | 16,622.6 | 26.8% | $0.68 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $397.6k | $0 | — | 9,724.8 | 10,159.2 | 23.4% | $0.53 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $394.0k | $0 | — | 6,253.4 | — | 29.0% | $0.68 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $393.1k | $0 | — | 9,019.9 | 10,466.0 | 17.3% | $0.50 | View |
| Eildon | EILDON1 |
VIC1 | Hydro - Dam | $384.9k | $0 | — | 2,162.9 | 27,440.1 | 4.5% | $1.05 | View |
| Broken Hill Solar Plant | BROKENH1 |
NSW1 | Solar PV - Fixed | $382.8k | $0 | — | 7,721.9 | 8,194.8 | 20.2% | $0.28 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $377.0k | $0 | — | 14,670.9 | 14,751.6 | 30.3% | $0.50 | View |
| Parkes Solar Farm | PARSF1 |
NSW1 | Solar PV - Single axis tracking | $375.3k | $0 | — | 7,319.0 | 7,546.2 | 20.5% | $0.25 | View |
| Bannerton Solar Park | BANN1 |
VIC1 | Solar PV - Single axis tracking | $369.8k | $0 | — | 8,907.3 | 9,016.5 | 12.4% | $0.34 | View |
| Blyth BESS | BLYTHB1 |
SA1 | Storage - Battery | $344.5k | $41.1k | 59,013.3 | -4,904.5 | 141,923.2 | -3.4% | $4.86 | View |
| Clermont Solar Farm | CLERMSF1 |
QLD1 | Solar PV - Single axis tracking | $343.5k | $0 | — | 12,351.6 | 12,697.6 | 18.5% | $0.34 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $343.4k | $0 | — | 9,435.3 | 9,846.2 | 25.0% | $0.77 | View |
| Smithfield Energy Facility | SITHE01 |
NSW1 | Turbine - OCGT | $341.0k | $0 | — | 1,867.3 | 1,867.3 | 2.1% | $128.50 | View |
| German Creek | GERMCRK |
QLD1 | Reciprocating Engine - Spark ignition | $339.8k | $0 | — | 5,805.1 | — | 17.9% | $122.81 | View |
| Quarantine | QPS2 |
SA1 | Turbine - OCGT | $338.4k | $0 | — | 1,523.6 | 14,225.9 | 8.8% | $128.50 | View |
| Tallawarra B | TALWB1 |
NSW1 | Turbine - OCGT | $337.8k | $0 | — | 1,519.0 | 224,516.2 | 0.7% | $128.50 | View |
| KIATAWF1 | KIATAWF1 |
VIC1 | $336.4k | $0 | — | 8,463.0 | 8,833.3 | 37.9% | $0.68 | View | |
| Finley Solar Farm | FINLYSF1 |
NSW1 | Solar PV - Single axis tracking | $332.5k | $0 | — | 6,690.9 | 6,660.8 | 5.7% | $0.25 | View |
| Torrens Island BESS | TIB1 |
SA1 | Storage - Battery | $323.1k | $40.8k | 133,639.7 | -3,315.3 | 127,592.1 | -1.8% | $1.50 | View |
| Lilyvale Solar Farm | LILYSF1 |
QLD1 | Solar PV - Single axis tracking | $321.4k | $0 | — | 10,585.1 | 11,655.0 | 12.4% | $0.25 | View |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $310.6k | $0 | — | 9,212.9 | 12,972.2 | 27.7% | $0.66 | View |
| Emerald Solar Park | EMERASF1 |
QLD1 | Solar PV - Single axis tracking | $308.7k | $0 | — | 10,956.9 | 11,052.2 | 21.1% | $0.25 | View |
| Clements Gap - BESS | CGBESS01 |
SA1 | Storage - Battery | $308.2k | $0 | — | -964.0 | 38,765.8 | -2.2% | $1.58 | View |
| Jemalong Solar | JEMALNG1 |
NSW1 | Solar PV - Single axis tracking | $308.1k | $0 | — | 5,985.7 | 6,704.6 | 15.1% | $0.32 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $288.7k | $0 | — | 8,575.0 | 8,653.9 | 21.0% | $0.80 | View |
| Rugby Run Solar Farm | RUGBYR1 |
QLD1 | Solar PV - Single axis tracking | $287.5k | $0 | — | 10,589.2 | 10,732.8 | 22.6% | $0.25 | View |
| Yatpool Solar Farm | YATSF1 |
VIC1 | Solar PV - Single axis tracking | $275.1k | $0 | — | 6,624.6 | 6,758.8 | 9.8% | $0.25 | View |
| Chinchilla BESS | CHBESS1 |
QLD1 | Storage - Battery | $265.3k | $1.4k | 26,295.7 | -964.0 | 47,783.4 | -1.3% | $1.75 | View |
| Rocky Point Sugar Mill Cogeneration Plant | RPCG |
QLD1 | Other - Other | $261.8k | $0 | — | 3,957.3 | — | 18.3% | $117.00 | View |
| Wagga North Solar Farm | WAGGNSF1 |
NSW1 | Solar PV - Single axis tracking | $261.5k | $0 | — | 5,163.2 | 5,313.6 | 12.9% | $0.25 | View |
| Mokoan Solar Farm (LightsourceBP) | MOKOSF1 |
VIC1 | Solar PV - Single axis tracking | $254.4k | $0 | — | 4,853.8 | 5,139.2 | 14.7% | $0.25 | View |
| Capital Battery | CAPBES1 |
NSW1 | Storage - Battery | $251.9k | $0 | — | -967.1 | 60,188.2 | -1.3% | $1.50 | View |
| Tully Sugar Mill | TULLYSM1 |
QLD1 | Turbine - Steam Super Critical | $242.2k | $0 | — | 3,798.8 | — | 16.5% | $117.00 | View |
| Moree Solar Farm | MOREESF1 |
NSW1 | Solar PV - Single axis tracking | $241.6k | $0 | — | 5,113.8 | 5,010.2 | 12.7% | $0.25 | View |
| Susan River Solar Farm | SRSF1 |
QLD1 | Solar PV - Single axis tracking | $240.9k | $0 | — | 9,311.8 | 9,273.6 | 15.2% | $0.25 | View |
| Rowallan | ROWALLAN |
TAS1 | Hydro - Dam | $237.4k | $0 | — | 3,950.0 | — | 52.2% | $1.00 | View |
| Kidston Solar Project Phase One 50MW | KSP1 |
QLD1 | Solar PV - Fixed | $228.4k | $0 | — | 7,797.9 | 8,816.1 | 21.7% | $0.20 | View |
| Lancaster Solar Farm | LANCSF1 |
VIC1 | Solar PV - Single axis tracking | $228.3k | $0 | — | 3,835.4 | 4,380.7 | 5.0% | $0.25 | View |
| Manildra Solar Farm | MANSLR1 |
NSW1 | Solar PV - Single axis tracking | $227.3k | $0 | — | 4,021.1 | 4,716.2 | 11.2% | $0.25 | View |
| Oakey 2 Solar Farm | OAKEY2SF |
QLD1 | Solar PV - Single axis tracking | $225.8k | $0 | — | 7,083.0 | 7,928.7 | 17.7% | $0.25 | View |
| Terang BESS | TRGBESS1 |
VIC1 | Storage - Battery | $223.0k | $0 | — | -465.3 | 1,367.5 | -0.6% | $1.50 | View |
| Uranquinty | URANQ12 |
NSW1 | Turbine - OCGT | $215.3k | $0 | — | 1,094.7 | 105,360.7 | 0.9% | $128.50 | View |
| Childers Solar Farm | CHILDSF1 |
QLD1 | Solar PV - Single axis tracking | $212.3k | $0 | — | 7,995.2 | 7,966.5 | 17.2% | $0.34 | View |
| Hornsdale Power Reserve Unit 1 | HPR1 |
SA1 | Storage - Battery | $209.2k | $29.5k | 12,452.3 | -1,808.8 | 53,092.9 | -1.7% | $1.50 | View |
| Hazelwood Battery Energy Storage System (HBESS) | HBESS1 |
VIC1 | Storage - Battery | $207.3k | $14.7k | 13,387.1 | -2,805.0 | 91,333.8 | -1.9% | $1.87 | View |
| Molong Solar Farm | MOLNGSF1 |
NSW1 | Solar PV - Single axis tracking | $206.8k | $0 | — | 3,788.5 | 4,293.3 | 14.6% | $0.25 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $196.3k | $0 | — | 5,623.1 | 5,609.0 | 23.7% | $0.50 | View |
| Kingaroy Solar Farm | KINGASF1 |
QLD1 | Solar PV - Single axis tracking | $195.5k | $0 | — | 5,850.8 | 6,881.6 | 20.3% | $0.25 | View |
| Quarantine | QPS4 |
SA1 | Turbine - OCGT | $190.8k | $0 | — | 472.7 | 14,632.5 | 2.7% | $128.50 | View |
| Corowa Solar Farm | CRWASF1 |
NSW1 | Solar PV - Single axis tracking | $185.9k | $0 | — | 3,651.6 | 3,651.8 | 14.1% | $0.33 | View |
| Junee Solar Farm | JUNEESF1 |
NSW1 | Solar PV - Single axis tracking | $185.7k | $0 | — | 3,552.2 | 3,656.2 | 13.7% | $0.00 | View |
| Wandoan South BESS | WANDB1 |
QLD1 | Storage - Battery | $184.1k | $18.9k | 141,504.7 | -1,396.8 | 49,294.4 | -1.9% | $1.50 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $180.7k | $0 | — | 5,330.6 | — | 24.7% | $0.50 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $178.7k | $0 | — | 6,371.0 | — | 16.9% | $0.53 | View |
| Limondale Solar Farm 2 | LIMOSF21 |
NSW1 | Solar PV - Single axis tracking | $174.8k | $0 | — | 3,711.2 | 3,747.0 | 17.8% | $0.25 | View |
| Gannawarra Solar Farm | GANNSF1 |
VIC1 | Solar PV - Single axis tracking | $168.0k | $0 | — | 4,039.9 | 3,988.0 | 10.2% | $0.34 | View |
| Hayman Solar Farm | HAYMSF1 |
QLD1 | Solar PV - Single axis tracking | $167.9k | $0 | — | 6,160.0 | 6,342.8 | 14.8% | $0.34 | View |
| Riverina Energy Storage System 1 | RESS1 |
NSW1 | Storage - Battery | $167.7k | $0 | — | -583.6 | 27,571.2 | -1.4% | $1.50 | View |
| Whitsunday Solar Farm | WHITSF1 |
QLD1 | Solar PV - Single axis tracking | $162.2k | $0 | — | 6,169.4 | 6,755.2 | 14.9% | $0.25 | View |
| Bell Bay Three | BBTHREE3 |
TAS1 | Turbine - OCGT | $160.7k | $0 | — | 184.2 | 16,084.0 | 0.6% | $141.97 | View |
| Riverina Energy Storage System 2 | RIVNB2 |
NSW1 | Storage - Battery | $159.3k | $39 | 21.3 | -384.0 | 16,436.5 | -0.8% | $1.50 | View |
| Smithfield BESS | SMTHBES1 |
NSW1 | Storage - Battery | $154.1k | $10.7k | 103,197.6 | -1,068.1 | 41,044.5 | -1.7% | $1.50 | View |
| Hamilton Solar Farm | HAMISF1 |
QLD1 | Solar PV - Single axis tracking | $152.1k | $0 | — | 5,784.8 | 6,317.6 | 14.0% | $18.64 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $145.2k | $0 | — | 4,275.1 | — | 20.7% | $0.50 | View |
| Port Stanvac 1 | PTSTAN1 |
SA1 | Reciprocating Engine - Compression ignition | $143.2k | $0 | — | 169.9 | 38,645.2 | 0.4% | $308.00 | View |
| Moura Solar Farm | MOUSF1 |
QLD1 | Solar PV - Single axis tracking | $136.2k | $0 | — | 6,434.0 | 6,263.8 | 9.0% | $0.25 | View |
| White Rock Solar Farm | WRSF1 |
NSW1 | Solar PV - Fixed | $132.6k | $0 | — | 2,800.6 | 2,770.3 | 19.4% | $0.20 | View |
| Collinsville PV | CSPVPS1 |
QLD1 | Solar PV - Fixed | $131.5k | $0 | — | 5,548.9 | 6,029.3 | 18.1% | $0.28 | View |
| Mannum Solar Farm 2 | MANNSF2 |
SA1 | Solar PV - Single axis tracking | $129.8k | $0 | — | 2,431.5 | 2,598.9 | 11.3% | $0.25 | View |
| Griffith Solar Farm | GRIFSF1 |
NSW1 | Solar PV - Single axis tracking | $128.3k | $0 | — | 2,682.2 | — | 13.7% | $0.35 | View |
| Butlers Gorge | BUTLERSG |
TAS1 | Hydro - Dam | $122.8k | $0 | — | 2,078.6 | — | 23.7% | $1.00 | View |
| BRDDBES1 | BRDDBES1 |
QLD1 | $115.8k | $0 | — | -803.3 | 56,113.0 | -0.3% | $0.27 | View | |
| Bouldercombe Battery project | BBATTERY1 |
QLD1 | Storage - Battery | $113.2k | $15.0k | 15,100.6 | -581.8 | 30,344.4 | -1.6% | $1.64 | View |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $110.8k | $0 | — | 3,567.4 | — | 25.4% | $0.50 | View |
| Warwick Solar Farm | WARWSF1 |
QLD1 | Solar PV - Single axis tracking | $107.6k | $0 | — | 2,827.9 | 3,652.1 | 12.2% | $0.25 | View |
| Oakey Solar Farm | OAKEY1SF |
QLD1 | Solar PV - Fixed | $104.6k | $0 | — | 3,546.9 | 3,699.3 | 19.7% | $0.20 | View |
| Maryrorough Solar Farm | MARYRSF1 |
QLD1 | Solar PV - Single axis tracking | $104.3k | $0 | — | 3,508.0 | 3,850.4 | 14.1% | $0.25 | View |
| Hunter Power Station | HUNTER2 |
NSW1 | Turbine - OCGT | $104.2k | $0 | — | 1,066.9 | 1,264.2 | 0.4% | $152.46 | View |
| Middlemount Solar Farm | MIDDLSF1 |
QLD1 | Solar PV - Single axis tracking | $102.7k | $0 | — | 3,133.7 | 3,985.2 | 16.7% | $0.25 | View |
| Mulwala Solar Farm | MULWASF1 |
NSW1 | Solar PV - Single axis tracking | $100.5k | $0 | — | 1,854.6 | 2,862.6 | 8.3% | $0.25 | View |
| Adelaide Desalination Plant | ADPPV1 |
SA1 | Solar PV - Fixed | $98.8k | $0 | — | 1,454.0 | 1,540.0 | 18.4% | $0.00 | View |
| Warwick Solar Farm | WARWSF2 |
QLD1 | Solar PV - Single axis tracking | $98.7k | $0 | — | 2,577.1 | 3,308.6 | 11.2% | $0.25 | View |
| Bell Bay Three | BBTHREE1 |
TAS1 | Turbine - OCGT | $96.6k | $0 | — | 65.2 | 17,758.3 | 0.2% | $182.63 | View |
| Stanwell | STAN-3 |
QLD1 | Turbine - Steam Sub Critical | $91.8k | $0 | — | 1,751.4 | 1,180.0 | 0.7% | $52.60 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $79.5k | $0 | — | 2,072.8 | — | 36.0% | $0.00 | View |
| Braemar | BRAEMAR3 |
QLD1 | Turbine - OCGT | $70.8k | $0 | — | 612.7 | 129,920.0 | 0.5% | $128.50 | View |
| Lake Bonney Battery Energy Storage | LBB1 |
SA1 | Storage - Battery | $69.8k | $5.3k | 44,577.7 | -126.0 | 14,529.1 | -0.7% | $1.98 | View |
| Gullen Range Solar Farm | GULLRSF1 |
NSW1 | Solar PV - Fixed | $68.3k | $0 | — | 1,295.8 | 1,292.7 | 18.0% | $0.27 | View |
| Townsville Power Station | YABULU |
QLD1 | Turbine - CCGT | $67.4k | $0 | — | 595.1 | 595.1 | 0.5% | $84.30 | View |
| Hunter Power Station | HUNTER1 |
NSW1 | Turbine - OCGT | $65.3k | $0 | — | 841.2 | 864.8 | 0.3% | $142.99 | View |
| Barcaldine Remote Community Solar Farm | BARCSF1 |
QLD1 | Solar PV - Single axis tracking | $61.6k | $0 | — | 1,921.7 | — | 13.3% | $0.00 | View |
| Wallgrove Grid Battery project | WALGRV1 |
NSW1 | Storage - Battery | $60.8k | $2.3k | 69,111.8 | -408.2 | 24,595.1 | -1.1% | $1.50 | View |
| Braemar 2 Power Station | BRAEMAR6 |
QLD1 | Turbine - OCGT | $60.5k | $0 | — | 438.5 | 113,238.1 | 0.4% | $133.36 | View |
| Darlington Point Energy Storage System | DPNTB1 |
NSW1 | Storage - Battery | $60.0k | $0 | — | -169.4 | 6,321.4 | -0.9% | $0.00 | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | MBPS2PV1 |
SA1 | Solar PV - Single axis tracking | $59.8k | $0 | — | 811.5 | 927.8 | 8.2% | $0.25 | View |
| Bolivar Waste Water Treatment | BOWWPV1 |
SA1 | Solar PV - Fixed | $58.8k | $0 | — | 826.0 | 873.6 | 13.9% | $0.23 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | MAPS2PV1 |
SA1 | Solar PV - Single axis tracking | $57.4k | $0 | — | 857.4 | 895.5 | 7.2% | $0.26 | View |
| Tailem Bend Battery Project | TB2B1 |
SA1 | Storage - Battery | $57.0k | $18.1k | 46,939.9 | -733.1 | 27,369.5 | -2.5% | $1.50 | View |
| Gannawarra Energy Storage System | GANNB1 |
VIC1 | Storage - Battery | $55.3k | $0 | — | -247.8 | 7,921.4 | -1.4% | $1.98 | View |
| Longreach Solar Farm | LRSF1 |
QLD1 | Solar PV - Fixed | $55.1k | $0 | — | 1,868.6 | — | 17.3% | $0.20 | View |
| Royalla Solar Farm | ROYALLA1 |
NSW1 | Solar PV - Fixed | $53.7k | $0 | — | 1,026.1 | — | 7.1% | $0.20 | View |
| Happy Valley Reservoir | HVWWPV1 |
SA1 | Solar PV - Single axis tracking | $52.4k | $0 | — | 718.3 | 767.7 | 9.1% | $0.00 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | MAPS3PV1 |
SA1 | Solar PV - Single axis tracking | $51.3k | $0 | — | 747.3 | 799.6 | 6.3% | $0.25 | View |
| Dry Creek GT | DRYCGT1 |
SA1 | Turbine - OCGT | $49.2k | $0 | — | 47.7 | 33,538.7 | 0.1% | $141.50 | View |
| Broken Hill | BHB1 |
NSW1 | Storage - Battery | $48.0k | $0 | — | -314.7 | 16,599.0 | -0.9% | $1.50 | View |
| Hughenden Sun Farm | HUGSF1 |
QLD1 | Solar PV - Single axis tracking | $39.0k | $0 | — | 1,575.5 | — | 10.4% | $0.00 | View |
| Colongra | CG2 |
NSW1 | Turbine - OCGT | $39.0k | $0 | — | 279.4 | 122,417.2 | 0.2% | $135.55 | View |
| Valley Power | VPGS1 |
VIC1 | Turbine - OCGT | $37.9k | $0 | — | 266.0 | 40,124.2 | 0.7% | $128.50 | View |
| Valley Power | VPGS3 |
VIC1 | Turbine - OCGT | $36.3k | $0 | — | 256.0 | 40,132.7 | 0.7% | $128.50 | View |
| Valley Power | VPGS2 |
VIC1 | Turbine - OCGT | $33.2k | $0 | — | 210.7 | 40,031.8 | 0.6% | $128.50 | View |
| Condamine A | CPSA |
QLD1 | Turbine - CCGT | $32.4k | $0 | — | 268.0 | 580.5 | 0.4% | $95.40 | View |
| Valley Power | VPGS5 |
VIC1 | Turbine - OCGT | $31.3k | $0 | — | 194.9 | 38,463.7 | 0.5% | $128.50 | View |
| Valley Power | VPGS6 |
VIC1 | Turbine - OCGT | $31.3k | $0 | — | 194.8 | 38,286.4 | 0.5% | $128.50 | View |
| Valley Power | VPGS4 |
VIC1 | Turbine - OCGT | $31.1k | $0 | — | 194.0 | 38,470.5 | 0.5% | $128.50 | View |
| Braemar 2 Power Station | BRAEMAR5 |
QLD1 | Turbine - OCGT | $27.8k | $0 | — | 387.9 | 109,618.9 | 0.3% | $3.14 | View |
| Morgan To Whyalla Pipeline No 4 PS | MWPS4PV1 |
SA1 | Solar PV - Single axis tracking | $27.6k | $0 | — | 391.5 | 426.4 | 9.9% | $0.25 | View |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | MWPS1PV1 |
SA1 | Solar PV - Single axis tracking | $26.6k | $0 | — | 385.2 | 443.3 | 9.7% | $0.25 | View |
| Jeeralang A | JLA01 |
VIC1 | Turbine - OCGT | $25.3k | $0 | — | 113.6 | 33,012.0 | 0.3% | $135.55 | View |
| Jeeralang B | JLB01 |
VIC1 | Turbine - OCGT | $25.2k | $0 | — | 82.8 | 55,412.5 | 0.2% | $128.50 | View |
| Rubicon Mountain Streams | RUBICON |
VIC1 | Hydro - Dam | $24.3k | $0 | — | 414.1 | — | 4.3% | $1.00 | View |
| Ballarat Energy Storage System | BALB1 |
VIC1 | Storage - Battery | $24.1k | $0 | — | -158.3 | 15,606.7 | -0.7% | $0.00 | View |
| Jeeralang A | JLA03 |
VIC1 | Turbine - OCGT | $24.1k | $0 | — | 109.2 | 38,488.5 | 0.3% | $141.46 | View |
| Colongra | CG4 |
NSW1 | Turbine - OCGT | $23.3k | $0 | — | 284.5 | 122,441.2 | 0.2% | $194.33 | View |
| Kennedy Energy Park - Phase 1 - Solar | KEPSF1 |
QLD1 | Solar PV - Single axis tracking | $23.1k | $0 | — | 837.2 | 851.2 | 7.8% | $0.34 | View |
| Jeeralang A | JLA04 |
VIC1 | Turbine - OCGT | $22.7k | $0 | — | 102.1 | 38,488.5 | 0.3% | $177.20 | View |
| Colongra | CG3 |
NSW1 | Turbine - OCGT | $22.5k | $0 | — | 284.1 | 122,346.9 | 0.2% | $144.24 | View |
| Bulgana Green Power Hub - BESS | BULBES1 |
VIC1 | Storage - Battery | $22.2k | $8.0k | 23,674.9 | -695.1 | 11,515.1 | -4.8% | $1.98 | View |
| Colongra | CG1 |
NSW1 | Turbine - OCGT | $21.0k | $0 | — | 282.9 | 122,877.6 | 0.2% | $197.00 | View |
| Wandoan South Solar Stage 2 | WANDSF2 |
QLD1 | Solar PV - Single axis tracking | $20.3k | $0 | — | 546.0 | 552.7 | 0.2% | $0.25 | View |
| Happy Valley Reservoir | HVWWBA1 |
SA1 | Storage - Battery | $18.5k | $803 | 5,444.3 | -53.1 | 2,459.3 | -1.3% | $1.58 | View |
| Cohuna Solar Farm | COHUNSF1 |
VIC1 | Solar PV - Single axis tracking | $16.0k | $0 | — | 590.3 | 622.5 | 2.6% | $0.33 | View |
| Morgan To Whyalla Pipeline No 3 PS | MWPS3PV1 |
SA1 | Solar PV - Single axis tracking | $15.4k | $0 | — | 252.3 | 280.4 | 4.7% | $0.25 | View |
| Morgan To Whyalla Pipeline No 2 PS | MWPS2PV1 |
SA1 | Solar PV - Single axis tracking | $13.9k | $0 | — | 191.7 | 220.8 | 4.8% | $0.25 | View |
| Adelaide Desalination Plant | ADPBA1 |
SA1 | Storage - Battery | $10.6k | $1.0k | 7,361.6 | -54.9 | 2,934.9 | -1.0% | $0.00 | View |
| Christies Beach Wastewater Treatment Plant | CBWWBA1 |
SA1 | Storage - Battery | $9.6k | $250 | 24.1 | -24.6 | 1,278.3 | -1.6% | $1.50 | View |
| Bolivar Waste Water Treatment | BOWWBA1 |
SA1 | Storage - Battery | $9.4k | $96 | 12.6 | -30.4 | 1,317.4 | -1.4% | $1.58 | View |
| Laverton North | LNGS2 |
VIC1 | Turbine - OCGT | $8.4k | $0 | — | 53.2 | 101,054.5 | 0.0% | $128.50 | View |
| Clover | CLOVER |
VIC1 | Hydro - Dam | $8.4k | $0 | — | 127.5 | — | 0.6% | $1.17 | View |
| Mt Stuart | MSTUART1 |
QLD1 | Turbine - OCGT | $6.7k | $0 | — | 65.4 | 98,152.5 | 0.1% | $2.00 | View |
| Philip Island BESS | PIBESS1 |
VIC1 | Storage - Battery | $5.9k | $1.7k | 530.6 | -226.1 | 2,369.6 | -6.3% | $1.50 | View |
| Jeeralang B | JLB03 |
VIC1 | Turbine - OCGT | $5.6k | $0 | — | 22.5 | 55,594.5 | 0.0% | $137.85 | View |
| Dalrymple BESS | DALNTH1 |
SA1 | Storage - Battery | $3.3k | $0 | — | -136.3 | 8,967.6 | -0.6% | $2.03 | View |
| Jeeralang B | JLB02 |
VIC1 | Turbine - OCGT | $2.5k | $0 | — | 25.0 | 37,200.0 | 0.0% | $137.71 | View |
| Mintaro GT | MINTARO |
SA1 | Turbine - OCGT | $1.4k | $0 | — | 21.8 | 62,969.7 | 0.0% | $128.50 | View |
| Angaston | ANGAST1 |
SA1 | Reciprocating Engine - Compression ignition | $1.4k | $0 | — | 13.6 | 30,730.7 | 0.0% | $0.00 | View |
| Roma | ROMA_8 |
QLD1 | Turbine - OCGT | $1.2k | $0 | — | 28.2 | 24,858.4 | 0.1% | $128.50 | View |
| Roma | ROMA_7 |
QLD1 | Turbine - OCGT | $1.2k | $0 | — | 28.0 | 25,711.7 | 0.1% | $128.50 | View |
| Braemar 2 Power Station | BRAEMAR7 |
QLD1 | Turbine - OCGT | $85 | $0 | — | 1.8 | 112,126.0 | 0.0% | $132.25 | View |
| Mt Stuart | MSTUART2 |
QLD1 | Turbine - OCGT | $72 | $0 | — | 1.5 | 85,387.5 | 0.0% | $148.45 | View |
| Tailem Bend Stage 2 Solar Project | TB2SF1 |
SA1 | Solar PV - Single axis tracking | $48 | $0 | — | 0.6 | — | 0.0% | $0.25 | View |
| DRFIIN02 | DRFIIN02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRFIIN01 | DRFIIN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND01 | DRGBND01 |
$0 | $0 | 4,021.3 | — | — | — | — | View | ||
| VSVEL2S1 | VSVEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRBRLV01 | DRBRLV01 |
$0 | $0 | 11,552.3 | — | — | — | — | View | ||
| VENUS1 | VENUS1 |
$0 | $0 | 1,119.5 | — | — | — | — | View | ||
| DRGBND02 | DRGBND02 |
$0 | $0 | 1,812.0 | — | — | — | — | View | ||
| DRAESS1 | DRAESS1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSE1V1 | VSSSE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSAE1V1 | VSSAE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSQHT1V1 | VSQHT1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSNEL2S1 | VSNEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAN1 | DRACAN1 |
$0 | $0 | 586.2 | — | — | — | — | View | ||
| VSSSH1S1 | VSSSH1S1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAV1 | DRACAV1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRAESN3 | DRAESN3 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND03 | DRGBND03 |
$0 | $0 | 3,482.0 | — | — | — | — | View | ||
| DRGBND04 | DRGBND04 |
$0 | $0 | 16,672.5 | — | — | — | — | View | ||
| DRHTVP01 | DRHTVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT02 | DRVIOT02 |
$0 | $0 | 1,249.3 | — | — | — | — | View | ||
| DRVIOT03 | DRVIOT03 |
$0 | $0 | 1,628.4 | — | — | — | — | View | ||
| DRVIOT04 | DRVIOT04 |
$0 | $0 | 45,676.6 | — | — | — | — | View | ||
| DRVIOT05 | DRVIOT05 |
$0 | $0 | 1,665.7 | — | — | — | — | View | ||
| DRVIOT06 | DRVIOT06 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT07 | DRVIOT07 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAD01 | DRXNAD01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAE01 | DRXNAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA01 | DRXNDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA02 | DRXNDA02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT01 | DRVIOT01 |
$0 | $0 | 3,710.6 | — | — | — | — | View | ||
| DRSHVS02 | DRSHVS02 |
$0 | $0 | 13,432.9 | — | — | — | — | View | ||
| DRHTVP03 | DRHTVP03 |
$0 | $0 | 0.6 | — | — | — | — | View | ||
| DRPSTV01 | DRPSTV01 |
$0 | $0 | 1,980.2 | — | — | — | — | View | ||
| DROZVP01 | DROZVP01 |
$0 | $0 | 1.2 | — | — | — | — | View | ||
| DROZVP02 | DROZVP02 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP03 | DROZVP03 |
$0 | $0 | 22.5 | — | — | — | — | View | ||
| RT_VIC1 | RT_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRPSTQ01 | DRPSTQ01 |
$0 | $0 | 4,420.0 | — | — | — | — | View | ||
| DRSHVN01 | DRSHVN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVN02 | DRSHVN02 |
$0 | $0 | 25,758.3 | — | — | — | — | View | ||
| DRSHVS01 | DRSHVS01 |
$0 | $0 | 1,581.2 | — | — | — | — | View | ||
| DRXNDA03 | DRXNDA03 |
$0 | $0 | — | — | — | — | — | View | ||
| PLBESS1 | PLBESS1 |
$0 | $0 | — | 0.0 | 47.7 | — | — | View | ||
| ASPAPM01 | ASPAPM01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPBSC01 | ASPBSC01 |
$0 | $0 | 1,021.9 | — | — | — | — | View | ||
| ASPSTV01 | ASPSTV01 |
$0 | $0 | 648.6 | — | — | — | — | View | ||
| ASQEEV1 | ASQEEV1 |
$0 | $0 | 3,161.7 | — | — | — | — | View | ||
| ASQENC1 | ASQENC1 |
$0 | $0 | 313.4 | — | — | — | — | View | ||
| ASRMGE01 | ASRMGE01 |
$0 | $0 | 3,080.8 | — | — | — | — | View | ||
| ASRMGE02 | ASRMGE02 |
$0 | $0 | 2,902.1 | — | — | — | — | View | ||
| ASRMGE03 | ASRMGE03 |
$0 | $0 | 2,992.6 | — | — | — | — | View | ||
| ASRMGE04 | ASRMGE04 |
$0 | $0 | 6,704.7 | — | — | — | — | View | ||
| ASNENC1 | ASNENC1 |
$0 | $0 | 4,201.7 | — | — | — | — | View | ||
| Townsville Power Station | YABULU2 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| APD01 | APD01 |
$0 | $0 | 70,023.0 | — | — | — | — | View | ||
| ASACLE01 | ASACLE01 |
$0 | $0 | 9,067.4 | — | — | — | — | View | ||
| ASDEVI01 | ASDEVI01 |
$0 | $0 | 4,733.0 | — | — | — | — | View | ||
| ASDLBY01 | ASDLBY01 |
$0 | $0 | 0.5 | — | — | — | — | View | ||
| ASENGV01 | ASENGV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGY01 | ASENGY01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASGENE01 | ASGENE01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNAES1 | ASNAES1 |
$0 | $0 | 176.9 | — | — | — | — | View | ||
| ASNBRL1 | ASNBRL1 |
$0 | $0 | 14,619.2 | — | — | — | — | View | ||
| WOOLES1 | WOOLES1 |
$0 | $0 | — | -227.3 | 744.2 | — | — | View | ||
| ASRMGE05 | ASRMGE05 |
$0 | $0 | 11,532.6 | — | — | — | — | View | ||
| ASSDE1 | ASSDE1 |
$0 | $0 | — | — | — | — | — | View | ||
| BUSF1 | BUSF1 |
$0 | $0 | — | 10,485.6 | 10,323.8 | — | — | View | ||
| CRWARP1 | CRWARP1 |
$0 | $0 | — | 17,626.1 | 17,751.5 | — | — | View | ||
| DG_NSW1 | DG_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_QLD1 | DG_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| WAMBOWF2 | WAMBOWF2 |
$0 | $0 | — | 1,297.8 | 1,297.8 | — | — | View | ||
| DG_SA1 | DG_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_TAS1 | DG_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_VIC1 | DG_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| Wivenhoe | W/HOE#2 |
Storage - Pumped hydro | $0 | $0 | 760.1 | 33,874.7 | 124,908.7 | — | — | View | |
| BUNGAMB1 | BUNGAMB1 |
$0 | $0 | 291,017.5 | -2,477.5 | 104,590.0 | — | — | View | ||
| Braemar | BRAEMAR2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 132,418.7 | 0.0% | $130.94 | View |
| WNSF1 | WNSF1 |
$0 | $0 | — | 1,908.0 | — | — | — | View | ||
| ASSENC1 | ASSENC1 |
$0 | $0 | 937.1 | — | — | — | — | View | ||
| ASSERDV1 | ASSERDV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASTHYD1 | ASTHYD1 |
$0 | $0 | 1,772.3 | — | — | — | — | View | ||
| Barcaldine Power Station | BARCALDN |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $141.78 | View |
| Bell Bay Three | BBTHREE2 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $137.22 | View |
| Bairnsdale | BDL02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $158.38 | View |
| Blowering | BLOWERNG |
NSW1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Braemar | BRAEMAR1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 130,436.8 | 0.0% | $133.75 | View |
| Wivenhoe | W/HOE#1 |
Storage - Pumped hydro | $0 | $0 | — | — | — | — | — | View | |
| RT_VIC5 | RT_VIC5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA3 | RT_SA3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA2 | RT_SA2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA1 | RT_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_QLD1 | RT_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW6 | RT_NSW6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW5 | RT_NSW5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW4 | RT_NSW4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW3 | RT_NSW3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW2 | RT_NSW2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA4 | RT_SA4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA5 | RT_SA5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC4 | RT_VIC4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC3 | RT_VIC3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC2 | RT_VIC2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC12 | RT_VIC12 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC11 | RT_VIC11 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC10 | RT_VIC10 |
$0 | $0 | — | — | — | — | — | View | ||
| KERNGSP1 | KERNGSP1 |
$0 | $0 | — | 2,222.6 | 2,903.4 | — | — | View | ||
| RT_TAS1 | RT_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA6 | RT_SA6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW1 | RT_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG1 | KIDSPHG1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG2 | KIDSPHG2 |
$0 | $0 | — | — | — | — | — | View | ||
| PUMP2 | PUMP2 |
$0 | $0 | — | 49,208.6 | 50,332.7 | — | — | View | ||
| PUMP1 | PUMP1 |
$0 | $0 | — | — | — | — | — | View | ||
| Port Lincoln GT | POR03 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Port Lincoln GT | POR01 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Mt Stuart | MSTUART3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 82,066.3 | 0.0% | $2.00 | View |
| KIDSPHL2 | KIDSPHL2 |
$0 | $0 | — | — | — | — | — | View | ||
| PIONEER | PIONEER |
$0 | $0 | — | 16,517.8 | — | — | — | View | ||
| NESBESS1 | NESBESS1 |
$0 | $0 | — | -391.9 | 6,360.4 | — | — | View | ||
| NESBESS2 | NESBESS2 |
$0 | $0 | — | -250.9 | 3,724.2 | — | — | View | ||
| MREHA3 | MREHA3 |
$0 | $0 | 45,222.8 | -5,051.5 | 139,900.7 | — | — | View | ||
| MREHA2 | MREHA2 |
$0 | $0 | 58,821.1 | -3,457.9 | 129,998.2 | — | — | View | ||
| KIDSPHL1 | KIDSPHL1 |
$0 | $0 | — | — | — | — | — | View | ||
| Laverton North | LNGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 107,180.8 | 0.0% | $128.50 | View |
| Oakey Power Station | OAKEY2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 35,304.0 | 0.0% | $128.50 | View |
| Lonsdale | LONSDALE |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 13,991.2 | 0.0% | $308.00 | View |
| QPSFB2 | QPSFB2 |
$0 | $0 | — | 39.3 | 4,676.4 | — | — | View | ||
| QPSFB1 | QPSFB1 |
$0 | $0 | — | 7,709.2 | 8,402.6 | — | — | View | ||
| MLB01 | MLB01 |
$0 | $0 | — | -546.2 | 1,283.3 | — | — | View | ||
| MLSP1 | MLSP1 |
$0 | $0 | — | 1,246.3 | — | — | — | View | ||
| MREHA1 | MREHA1 |
$0 | $0 | 57,071.5 | -3,182.6 | 128,918.6 | — | — | View | ||
| Oakey Power Station | OAKEY1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 35,140.5 | 0.0% | $128.50 | View |
| RT_VIC6 | RT_VIC6 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA04 | DRXNDA04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQQE01 | DRXQQE01 |
$0 | $0 | — | — | 347.7 | — | — | View | ||
| DRXSQS01 | DRXSQS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVAE01 | DRXVAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDP01 | DRXVDP01 |
$0 | $0 | — | — | — | — | — | View | ||
| STABESS1 | STABESS1 |
$0 | $0 | — | 5.5 | 3.0 | — | — | View | ||
| DRXVDX01 | DRXVDX01 |
$0 | $0 | — | 1.1 | 1.1 | — | — | View | ||
| Snuggery | SNUG1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| SNOWYP | SNOWYP |
$0 | $0 | — | 10,786.4 | 10,905.5 | — | — | View | ||
| SNOWYGJP | SNOWYGJP |
$0 | $0 | 13,249.8 | — | — | — | — | View | ||
| DRXQDA01 | DRXQDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNVS01 | DRXNVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDB04 | DRXNDB04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDE01 | DRXNDE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDJ01 | DRXNDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDW01 | DRXNDW01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNFF01 | DRXNFF01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNFS01 | DRXNFS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNQX01 | DRXNQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNSS01 | DRXNSS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNTM02 | DRXNTM02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQP01 | DRXVQP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX01 | DRXVQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| GPWFWST2 | GPWFWST2 |
$0 | $0 | — | 28,014.7 | 38,935.4 | — | — | View | ||
| SHPUMP | SHPUMP |
$0 | $0 | — | 6,162.7 | 6,215.0 | — | — | View | ||
| Gladstone | GSTONE5 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $58.48 | View |
| Hunter EconomicZone | HEZ1 |
NSW1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 14,067.5 | 0.0% | $308.00 | View |
| Hume Dam VIC | HUMEV |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.54 | View |
| Jeeralang A | JLA02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 31,536.0 | 0.0% | $128.50 | View |
| Kennedy Energy Park - Phase 1 - Storage | KEPBG1 |
QLD1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $2.03 | View |
| KEPBL1 | KEPBL1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC9 | RT_VIC9 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC8 | RT_VIC8 |
$0 | $0 | — | — | — | — | — | View | ||
| GPWFWST1 | GPWFWST1 |
$0 | $0 | — | 43,875.5 | 66,960.1 | — | — | View | ||
| RT_VIC7 | RT_VIC7 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX02 | DRXVQX02 |
$0 | $0 | — | — | 0.8 | — | — | View | ||
| DRXVDJ01 | DRXVDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| Broken Hill GT | GB01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.11 | View |
| Dry Creek GT | DRYCGT2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 24,946.2 | 0.0% | $135.55 | View |
| Eraring GT | ERGT01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $96.96 | View |
| Dry Creek GT | DRYCGT3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 34,669.7 | 0.0% | $210.15 | View |
| Hume Dam NSW | HUMENSW |
NSW1 | Hydro - Dam | $-19 | $0 | — | -0.2 | — | 0.0% | $1.05 | View |
| Templers B BESS | TEMPB1 |
SA1 | Storage - Battery | $-207 | $0 | — | -2.4 | — | 0.0% | $1.50 | View |
| LINCOLN GAP BESSBDU | LGAPBS1 |
SA1 | Storage - Battery | $-297 | $0 | — | -2.0 | — | 0.0% | $1.50 | View |
| SMFBESS2 | SMFBESS2 |
SA1 | $-617 | $0 | — | -7.5 | — | 0.0% | $1.50 | View | |
| Williamsdale BESS | WILLBES1 |
NSW1 | Storage - Battery | $-1.1k | $0 | — | -11.9 | 1,336.3 | 0.0% | $1.50 | View |
| SMFBESS1 | SMFBESS1 |
SA1 | $-1.2k | $0 | — | 11.2 | 114.1 | 0.0% | $1.50 | View | |
| Mornington BESS | MRNBESS1 |
VIC1 | Storage - Battery | $-6.3k | $0 | — | -559.1 | 937.8 | -0.3% | $1.50 | View |
| Queanbeyan BESS | QBYNB1 |
NSW1 | Storage - Battery | $-7.6k | $4.6k | 9,674.5 | -346.3 | 3,853.7 | -4.8% | $1.50 | View |
| Liddell BESS | LDBESS1 |
NSW1 | Storage - Battery | $-664.9k | $0 | — | -4,215.0 | 102,874.9 | -1.2% | $1.50 | View |