MLF-adjusted revenue, dispatch, capacity factor, and estimated SRMC from AEMO 5‑minute dispatch data. Data through 04 Aug 2026, 00:50 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Murray 2 | MURRAY |
VIC1 | Hydro - Dam | $36.27M | $7.8k | 7,150.3 | 284,584.2 | 837,947.8 | 65.9% | $1.00 | View |
| Eraring | ER03 |
NSW1 | Turbine - Steam Sub Critical | $34.64M | $5.6k | 20,465.3 | 412,997.3 | 462,353.3 | 79.7% | $49.77 | View |
| Bayswater | BW03 |
NSW1 | Turbine - Steam Sub Critical | $32.82M | $7.9k | 7,265.4 | 402,201.1 | 470,252.3 | 81.5% | $28.68 | View |
| Bayswater | BW04 |
NSW1 | Turbine - Steam Sub Critical | $31.46M | $10.2k | 9,524.2 | 379,158.9 | 478,908.3 | 76.9% | $55.48 | View |
| Bayswater | BW02 |
NSW1 | Turbine - Steam Sub Critical | $31.44M | $10.0k | 9,101.4 | 379,428.8 | 478,356.7 | 76.9% | $26.23 | View |
| Bayswater | BW01 |
NSW1 | Turbine - Steam Sub Critical | $30.34M | $10.3k | 9,274.6 | 370,018.9 | 460,927.5 | 77.9% | $53.57 | View |
| Vales Point B | VP5 |
NSW1 | Turbine - Steam Sub Critical | $29.43M | $77 | 332.0 | 337,953.7 | 442,232.5 | 71.1% | $52.60 | View |
| Vales Point B | VP6 |
NSW1 | Turbine - Steam Sub Critical | $29.03M | $79 | 348.5 | 333,290.5 | 440,509.2 | 70.1% | $52.60 | View |
| Eraring | ER02 |
NSW1 | Turbine - Steam Sub Critical | $28.71M | $4.8k | 16,465.5 | 355,709.5 | 400,439.8 | 68.6% | $59.45 | View |
| Loy Yang B | LOYYB1 |
VIC1 | Turbine - Steam Sub Critical | $27.53M | $6.3k | 13,368.2 | 381,882.9 | 405,396.7 | 91.4% | $47.20 | View |
| Loy Yang B | LOYYB2 |
VIC1 | Turbine - Steam Sub Critical | $27.38M | $6.6k | 13,319.0 | 379,014.5 | 402,004.7 | 90.8% | $47.20 | View |
| Mt Piper | MP1 |
NSW1 | Turbine - Steam Sub Critical | $26.57M | $0 | — | 296,769.9 | 509,613.3 | 56.5% | $49.24 | View |
| Mt Piper | MP2 |
NSW1 | Turbine - Steam Sub Critical | $26.04M | $0 | — | 289,880.8 | 489,413.3 | 61.0% | $52.60 | View |
| Loy Yang A Power Station | LYA1 |
VIC1 | Turbine - Steam Sub Critical | $25.98M | $1.5k | 5,986.7 | 350,927.0 | 389,048.3 | 87.0% | $47.20 | View |
| Loy Yang A Power Station | LYA3 |
VIC1 | Turbine - Steam Sub Critical | $25.59M | $1.5k | 5,959.0 | 347,765.6 | 389,870.0 | 86.3% | $47.20 | View |
| Loy Yang A Power Station | LYA2 |
VIC1 | Turbine - Steam Sub Critical | $24.99M | $2.1k | 1,690.5 | 341,075.2 | 364,555.8 | 89.4% | $47.20 | View |
| Loy Yang A Power Station | LYA4 |
VIC1 | Turbine - Steam Sub Critical | $24.53M | $1.3k | 5,702.4 | 332,519.7 | 370,158.3 | 82.5% | $47.20 | View |
| Eraring | ER04 |
NSW1 | Turbine - Steam Sub Critical | $21.81M | $3.2k | 10,771.9 | 264,840.3 | 267,955.0 | 51.1% | $55.48 | View |
| Tarong North | TNPS1 |
QLD1 | Turbine - Steam Super Critical | $18.66M | $0 | — | 281,371.6 | 305,448.2 | 86.8% | $52.60 | View |
| Pelican Point | PPCCGT |
SA1 | Turbine - CCGT | $18.59M | $0 | — | 116,900.3 | 170,409.9 | 30.7% | $84.30 | View |
| Millmerran Power Plant | MPP_2 |
QLD1 | Turbine - Steam Super Critical | $18.35M | $0 | — | 275,653.8 | 296,406.8 | 89.9% | $52.60 | View |
| Eraring | ER01 |
NSW1 | Turbine - Steam Sub Critical | $18.34M | $2.1k | 8,840.4 | 220,555.6 | 245,358.6 | 42.5% | $48.29 | View |
| Millmerran Power Plant | MPP_1 |
QLD1 | Turbine - Steam Super Critical | $18.04M | $0 | — | 272,238.3 | 293,086.2 | 88.8% | $52.60 | View |
| Yallourn W | YWPS4 |
VIC1 | Turbine - Steam Sub Critical | $18.01M | $0 | — | 245,738.1 | 265,665.7 | 91.0% | $47.20 | View |
| Yallourn W | YWPS3 |
VIC1 | Turbine - Steam Sub Critical | $17.75M | $0 | — | 243,957.1 | 265,622.9 | 90.4% | $47.20 | View |
| Yallourn W | YWPS1 |
VIC1 | Turbine - Steam Sub Critical | $15.66M | $0 | — | 223,664.8 | 226,247.9 | 88.8% | $47.20 | View |
| Yallourn W | YWPS2 |
VIC1 | Turbine - Steam Sub Critical | $15.54M | $0 | — | 228,002.2 | 223,333.3 | 90.5% | $47.20 | View |
| Callide C | CPP_4 |
QLD1 | Turbine - Steam Super Critical | $15.29M | $0 | — | 236,732.5 | 282,266.7 | 78.3% | $101.94 | View |
| Tarong | TARONG#2 |
QLD1 | Turbine - Steam Sub Critical | $14.95M | $1.2k | 227.8 | 222,199.5 | 241,521.2 | 88.2% | $55.48 | View |
| Tarong | TARONG#1 |
QLD1 | Turbine - Steam Sub Critical | $14.38M | $1 | 0.5 | 210,474.5 | 226,384.2 | 83.5% | $52.60 | View |
| Tarong | TARONG#4 |
QLD1 | Turbine - Steam Sub Critical | $14.34M | $1.4k | 258.7 | 212,179.4 | 230,765.0 | 84.2% | $52.58 | View |
| Kogan Creek | KPP_1 |
QLD1 | Turbine - Steam Super Critical | $13.51M | $0 | — | 198,608.5 | 224,815.5 | 37.1% | $52.60 | View |
| Callide C | CPP_3 |
QLD1 | Turbine - Steam Super Critical | $13.23M | $0 | — | 211,217.8 | 237,217.0 | 69.2% | $44.41 | View |
| Upper Tumut | UPPTUMUT |
NSW1 | Hydro - Dam | $12.30M | $9.9k | 13,107.4 | 133,069.4 | 332,837.2 | 30.0% | $1.00 | View |
| Stanwell | STAN-2 |
QLD1 | Turbine - Steam Sub Critical | $11.04M | $2.6k | 518.9 | 166,263.3 | 231,428.3 | 63.3% | $52.60 | View |
| Osborne | OSB-AG |
SA1 | Turbine - CCGT | $10.99M | $0 | — | 80,183.6 | 84,930.4 | 61.9% | $84.30 | View |
| Callide B | CALL_B_2 |
QLD1 | Turbine - Steam Sub Critical | $10.83M | $82 | 125.8 | 175,700.2 | 233,912.5 | 69.7% | $55.48 | View |
| Callide B | CALL_B_1 |
QLD1 | Turbine - Steam Sub Critical | $10.77M | $52 | 64.1 | 176,749.1 | 239,502.9 | 70.1% | $32.60 | View |
| Stanwell | STAN-1 |
QLD1 | Turbine - Steam Sub Critical | $10.60M | $2.6k | 3,492.7 | 163,127.6 | 208,994.2 | 62.1% | $52.60 | View |
| Tarong | TARONG#3 |
QLD1 | Turbine - Steam Sub Critical | $10.49M | $0 | — | 160,679.6 | 175,363.3 | 63.8% | $55.48 | View |
| Mortlake | MORTLK11 |
VIC1 | Turbine - OCGT | $9.10M | $0 | — | 63,591.2 | 173,686.2 | 30.2% | $128.50 | View |
| Barker Inlet Power Station | BARKIPS1 |
SA1 | Reciprocating Engine - Spark ignition | $8.23M | $23 | 10.0 | 49,398.0 | 126,658.7 | 32.7% | $9.00 | View |
| Stanwell | STAN-4 |
QLD1 | Turbine - Steam Sub Critical | $7.95M | $0 | — | 131,650.7 | 143,821.2 | 50.1% | $52.60 | View |
| Gladstone | GSTONE4 |
QLD1 | Turbine - Steam Sub Critical | $7.56M | $49 | 8.1 | 115,616.0 | 189,576.2 | 57.3% | $52.60 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $7.51M | $0 | — | 117,411.8 | 116,466.7 | 17.7% | $0.58 | View |
| Catagunya / Liapootah / Wayatinah | LI_WY_CA |
TAS1 | Hydro - Dam | $7.46M | $1.8k | 2,412.0 | 98,039.1 | 126,414.6 | 77.1% | $1.05 | View |
| Gladstone | GSTONE1 |
QLD1 | Turbine - Steam Sub Critical | $7.34M | $0 | — | 113,862.3 | 186,412.5 | 56.5% | $52.99 | View |
| Gladstone | GSTONE6 |
QLD1 | Turbine - Steam Sub Critical | $7.30M | $16 | 2.5 | 113,229.2 | 186,547.5 | 56.2% | $54.96 | View |
| Tumut 3 | TUMUT3 |
NSW1 | Hydro - Dam | $6.79M | $4.1k | 8,885.9 | 64,621.6 | 1,172,549.5 | 6.0% | $1.05 | View |
| Mortlake | MORTLK12 |
VIC1 | Turbine - OCGT | $6.76M | $0 | — | 40,435.9 | 172,491.1 | 19.2% | $128.50 | View |
| Torrens Island B | TORRB2 |
SA1 | Turbine - Steam Sub Critical | $6.34M | $11.7k | 11,335.6 | 40,726.3 | 87,670.7 | 28.3% | $5.47 | View |
| Gordon | GORDON |
TAS1 | Hydro - Dam | $6.07M | $47.7k | 16,596.6 | 49,443.0 | 200,412.0 | 15.9% | $1.05 | View |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $6.04M | $0 | — | 90,053.7 | 87,225.9 | 31.6% | $0.50 | View |
| Bogong / Mackay | MCKAY1 |
VIC1 | Hydro - Dam | $5.86M | $0 | — | 38,902.4 | 196,947.3 | 18.0% | $1.00 | View |
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $5.85M | $0 | — | 91,486.3 | 94,854.4 | 28.1% | $0.68 | View |
| Darling Downs | DDPS1 |
QLD1 | Turbine - CCGT | $5.80M | $0 | — | 60,449.3 | 63,114.6 | 13.0% | $3.31 | View |
| Gladstone | GSTONE3 |
QLD1 | Turbine - Steam Sub Critical | $5.48M | $39 | 6.7 | 82,390.1 | 115,702.9 | 40.9% | $128.75 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $5.41M | $0 | — | 82,376.2 | 82,326.5 | 33.0% | $0.00 | View |
| John Butters | JBUTTERS |
TAS1 | Hydro - Dam | $5.40M | $27.3k | 14,394.3 | 57,221.6 | 98,232.3 | 55.2% | $0.00 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $5.19M | $0 | — | 54,539.8 | 54,441.0 | 28.1% | $0.50 | View |
| Reece | REECE1 |
TAS1 | Hydro - Dam | $5.19M | $4.1k | 3,458.8 | 70,304.9 | 77,721.7 | 84.5% | $1.00 | View |
| Tungatinah | TUNGATIN |
TAS1 | Hydro - Dam | $5.00M | $21.9k | 12,774.7 | 64,009.4 | 88,872.5 | 71.1% | $1.00 | View |
| Yarwun 1 | YARWUN_1 |
QLD1 | Turbine - CCGT | $4.92M | $0 | — | 81,923.6 | 114,935.8 | 63.2% | $84.30 | View |
| Reece | REECE2 |
TAS1 | Hydro - Dam | $4.72M | $44.5k | 8,587.3 | 65,208.1 | 70,350.9 | 78.3% | $1.00 | View |
| Tamar Valley Combined Cycle | TVCC201 |
TAS1 | Turbine - CCGT | $4.68M | $54 | 107.6 | 75,479.1 | 99,021.6 | 50.4% | $84.30 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $4.02M | $0 | — | 140,529.5 | 135,844.3 | 37.0% | $0.50 | View |
| Cethana | CETHANA |
TAS1 | Hydro - Dam | $3.96M | $21.1k | 8,591.5 | 47,245.5 | 67,150.7 | 77.2% | $1.09 | View |
| Trevallyn | TREVALLN |
TAS1 | Hydro - Dam | $3.78M | $19 | 37.9 | 39,927.0 | 66,713.2 | 59.6% | $1.00 | View |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $3.67M | $0 | — | 58,705.3 | 59,435.9 | 45.2% | $0.50 | View |
| Bastyan | BASTYAN |
TAS1 | Hydro - Dam | $3.59M | $3.2k | 1,445.4 | 48,190.2 | 54,664.3 | 83.8% | $0.00 | View |
| Mackintosh | MACKNTSH |
TAS1 | Hydro - Dam | $3.54M | $13.0k | 8,318.7 | 45,218.3 | 55,060.4 | 78.6% | $1.00 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $3.49M | $0 | — | 50,979.6 | 50,538.9 | 40.9% | $0.53 | View |
| Poatina | POAT220 |
TAS1 | Hydro - Dam | $3.24M | $8.5k | 1,795.6 | 17,696.3 | 47,973.3 | 12.3% | $1.00 | View |
| Quarantine | QPS5 |
SA1 | Turbine - OCGT | $3.09M | $0 | — | 17,735.5 | 87,003.2 | 19.2% | $209.05 | View |
| Torrens Island B | TORRB3 |
SA1 | Turbine - Steam Sub Critical | $3.07M | $5.7k | 6,232.0 | 18,912.3 | 46,723.5 | 13.1% | $2.00 | View |
| Newport | NPS |
VIC1 | Turbine - Steam Sub Critical | $2.99M | $0 | — | 4,507.3 | 6,365.1 | 1.3% | $2.00 | View |
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $2.98M | $0 | — | 45,415.2 | 45,558.4 | 25.0% | $0.50 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $2.87M | $0 | — | 43,173.8 | 43,300.5 | 34.3% | $0.50 | View |
| Gladstone | GSTONE2 |
QLD1 | Turbine - Steam Sub Critical | $2.83M | $0 | — | 42,067.6 | 53,428.0 | 20.9% | $49.17 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $2.82M | $0 | — | 37,793.2 | 37,991.0 | 26.4% | $0.50 | View |
| Devils Gate | DEVILS_G |
TAS1 | Hydro - Dam | $2.79M | $7.1k | 2,561.2 | 35,406.2 | 43,567.5 | 82.0% | $1.00 | View |
| Tribute | TRIBUTE |
TAS1 | Hydro - Dam | $2.73M | $38.8k | 5,745.1 | 32,203.5 | 47,091.7 | 54.0% | $1.00 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $2.63M | $0 | — | 55,535.2 | 56,189.0 | 36.9% | $0.55 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $2.60M | $0 | — | 40,103.1 | 39,987.9 | 35.5% | $0.00 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $2.52M | $0 | — | 49,583.7 | 49,238.8 | 47.8% | $0.66 | View |
| Torrens Island B | TORRB4 |
SA1 | Turbine - Steam Sub Critical | $2.50M | $4.9k | 5,680.3 | 18,575.4 | 35,473.4 | 12.9% | $2.00 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $2.50M | $0 | — | 41,478.6 | 40,153.2 | 25.4% | $0.65 | View |
| Eraring Big Battery | ERB01 |
NSW1 | Storage - Battery | $2.50M | $0 | — | -7,888.4 | 297,113.7 | -4.6% | $1.58 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $2.42M | $0 | — | 49,577.0 | 48,664.7 | 41.0% | $0.50 | View |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $2.38M | $0 | — | 72,552.3 | 78,922.7 | 24.0% | $0.50 | View |
| Somerton | AGLSOM |
VIC1 | Turbine - OCGT | $2.37M | $0 | — | 11,239.4 | 101,090.7 | 9.2% | $128.50 | View |
| Wellington North Solar Farm (Lightsource) | WELNSF1 |
NSW1 | Solar PV - Single axis tracking | $2.36M | $0 | — | 46,803.2 | 46,231.0 | 14.9% | $0.25 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $2.34M | $0 | — | 37,613.5 | 36,191.5 | 31.6% | $0.53 | View |
| Snapper Point Power Station | SNAPPER1 |
SA1 | Turbine - OCGT | $2.25M | $0 | — | 3,851.3 | 102,485.8 | 3.5% | $128.50 | View |
| Fisher | FISHER |
TAS1 | Hydro - Dam | $2.24M | $8.4k | 3,169.6 | 31,614.9 | 32,135.7 | 100.0% | $1.05 | View |
| Tarraleah | TARRALEA |
TAS1 | Hydro - Dam | $2.23M | $0 | — | 35,001.7 | 33,872.7 | 54.0% | $1.00 | View |
| West Kiewa | WKIEWA1 |
VIC1 | Hydro - Dam | $2.13M | $0 | — | 24,088.9 | 38,316.8 | 98.4% | $10.00 | View |
| Culcairn Solar Farm | CUSF1 |
NSW1 | Solar PV - Single axis tracking | $2.13M | $0 | — | 41,593.7 | 43,009.1 | 16.5% | $0.25 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $2.11M | $0 | — | 75,061.7 | 76,707.3 | 33.4% | $0.50 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $2.07M | $0 | — | 41,500.1 | 50,024.1 | 28.3% | $0.00 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $2.06M | $0 | — | 31,482.3 | 30,927.5 | 27.5% | $0.00 | View |
| Western Downs Green Power Hub P/L | WDGPH1 |
QLD1 | Solar PV - Single axis tracking | $2.05M | $111 | 16.0 | 70,993.8 | 69,656.5 | 24.7% | $0.32 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $2.01M | $0 | — | 30,868.3 | 29,975.8 | 30.3% | $0.53 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $1.95M | $0 | — | 29,335.5 | 28,322.1 | 36.8% | $0.50 | View |
| Supernode BESS | SNB02 |
QLD1 | Storage - Battery | $1.93M | $441 | 45.7 | -4,364.5 | 164,276.1 | -2.3% | $1.50 | View |
| Orana BESS | ORABESS1 |
NSW1 | Storage - Battery | $1.93M | $130 | 513.9 | -4,686.9 | 270,917.1 | -1.6% | $1.50 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $1.87M | $0 | — | 29,162.5 | 28,110.7 | 35.8% | $0.00 | View |
| Ladbroke Grove | LADBROK2 |
SA1 | Turbine - OCGT | $1.83M | $0 | — | 10,792.7 | 28,321.2 | 37.5% | $145.06 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $1.77M | $0 | — | 55,710.6 | 55,348.7 | 35.4% | $0.50 | View |
| Wollar Solar Farm | WOLARSF1 |
NSW1 | Solar PV - Single axis tracking | $1.77M | $0 | — | 35,507.1 | 34,997.2 | 17.6% | $0.25 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $1.76M | $0 | — | 27,044.5 | 26,365.0 | 36.3% | $0.58 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $1.76M | $0 | — | 22,733.1 | 22,415.5 | 27.9% | $0.68 | View |
| SHOAL1 | SHOAL1 |
NSW1 | $1.75M | $0 | — | 21,838.8 | — | 12.3% | $1.20 | View | |
| Stubbo Solar Farm | STUBSF2 |
NSW1 | Solar PV - Single axis tracking | $1.70M | $0 | — | 32,923.2 | 32,670.5 | 22.6% | $0.25 | View |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $1.70M | $0 | — | 23,213.2 | 22,515.3 | 22.2% | $0.58 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $1.69M | $0 | — | 36,952.5 | 36,469.7 | 46.0% | $0.66 | View |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $1.69M | $0 | — | 29,253.8 | 35,697.9 | 25.6% | $0.86 | View |
| Hallett GT | AGLHAL |
SA1 | Turbine - OCGT | $1.67M | $0 | — | 3,884.0 | 102,957.3 | 1.9% | $100.22 | View |
| Ladbroke Grove | LADBROK1 |
SA1 | Turbine - OCGT | $1.66M | $0 | — | 9,484.4 | 29,220.2 | 32.9% | $153.02 | View |
| Stubbo Solar Farm | STUBSF1 |
NSW1 | Solar PV - Single axis tracking | $1.65M | $0 | — | 31,868.7 | 31,581.9 | 22.4% | $0.25 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $1.64M | $0 | — | 50,954.8 | 61,799.1 | 28.5% | $0.00 | View |
| Meadowbank | MEADOWBK |
TAS1 | Hydro - Dam | $1.63M | $335 | 173.8 | 21,154.4 | 30,322.2 | 73.5% | $1.00 | View |
| Lemonthyme / Wilmot | LEM_WIL |
TAS1 | Hydro - Dam | $1.60M | $5.6k | 1,342.9 | 22,599.0 | 22,637.0 | 38.5% | $1.00 | View |
| Aldoga Solar Farm | ALDGASF1 |
QLD1 | Solar PV - Single axis tracking | $1.52M | $0 | — | 59,913.0 | 61,124.0 | 21.5% | $0.00 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $1.50M | $0 | — | 24,052.8 | 23,205.2 | 31.3% | $0.50 | View |
| Darlington Point Solar Farm | DARLSF1 |
NSW1 | Solar PV - Single axis tracking | $1.49M | $0 | — | 31,134.4 | 30,713.1 | 15.7% | $0.33 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $1.47M | $0 | — | 60,221.8 | 59,676.2 | 33.7% | $0.50 | View |
| Goorambat East Solar Farm (ENGIE) | GOESF1 |
VIC1 | Solar PV - Single axis tracking | $1.46M | $0 | — | 25,935.0 | 29,047.0 | 14.4% | $0.25 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $1.45M | $0 | — | 49,509.5 | 61,289.6 | 26.4% | $0.50 | View |
| Rangebank BESS | RANGEB1 |
VIC1 | Storage - Battery | $1.42M | $68 | 154.1 | -2,671.9 | 107,649.6 | -1.9% | $1.50 | View |
| Bolivar Power Station | BOLIVPS1 |
SA1 | Turbine - OCGT | $1.38M | $0 | — | 3,040.8 | 3,579.5 | 3.3% | $151.37 | View |
| Dartmouth | DARTM1 |
VIC1 | Hydro - Dam | $1.37M | $0 | — | 5,456.3 | 101,415.3 | 4.1% | $0.00 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $1.32M | $0 | — | 19,748.5 | 19,246.9 | 32.3% | $0.00 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $1.29M | $0 | — | 26,201.1 | 27,719.2 | 27.5% | $0.80 | View |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $1.28M | $0 | — | 47,765.1 | 47,704.8 | 36.7% | $0.50 | View |
| Koorangie Energy Storage System | KESSB1 |
VIC1 | Storage - Battery | $1.28M | $0 | — | -2,019.3 | 98,209.7 | -1.5% | $1.50 | View |
| Waratah Super Battery | WTAHB1 |
NSW1 | Storage - Battery | $1.27M | $0 | — | -6,712.3 | 273,212.5 | -1.1% | $1.50 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $1.25M | $0 | — | 20,741.2 | 19,871.8 | 30.0% | $0.69 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $1.25M | $0 | — | 27,876.8 | 36,284.4 | 17.2% | $0.50 | View |
| New England Solar Farm | NEWENSF2 |
NSW1 | Solar PV - Single axis tracking | $1.21M | $0 | — | 24,938.2 | 24,538.8 | 17.3% | $0.25 | View |
| Avonlie Solar Farm | AVLSF1 |
NSW1 | Solar PV - Single axis tracking | $1.19M | $0 | — | 25,295.3 | 24,408.9 | 13.8% | $0.00 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $1.18M | $0 | — | 30,528.0 | 29,326.7 | 39.8% | $0.00 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $1.17M | $0 | — | 32,915.0 | 45,919.6 | 27.2% | $0.66 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $1.16M | $0 | — | 19,634.3 | — | 19.4% | $0.00 | View |
| New England Solar Farm | NEWENSF1 |
NSW1 | Solar PV - Single axis tracking | $1.16M | $0 | — | 23,762.7 | 23,379.1 | 16.5% | $0.25 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $1.14M | $0 | — | 29,190.3 | — | 29.4% | $0.53 | View |
| Tarong BESS - Stanwell | TARBESS1 |
QLD1 | Storage - Battery | $1.12M | $8.8k | 179,927.4 | -2,421.5 | 150,626.7 | -1.1% | $1.50 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $1.12M | $0 | — | 28,720.7 | 30,082.1 | 41.3% | $0.00 | View |
| Limondale Solar Farm 1 | LIMOSF11 |
NSW1 | Solar PV - Single axis tracking | $1.12M | $0 | — | 24,373.5 | 23,914.6 | 14.7% | $0.25 | View |
| Swanbank BESS | SWANBBF1 |
QLD1 | Storage - Battery | $1.11M | $0 | — | -2,408.2 | 95,527.9 | -1.3% | $1.50 | View |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $1.10M | $0 | — | 28,515.9 | 27,883.5 | 30.3% | $0.50 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $1.10M | $0 | — | 22,509.4 | 22,253.4 | 30.5% | $0.50 | View |
| Suntop Solar Farm | SUNTPSF1 |
NSW1 | Solar PV - Single axis tracking | $1.10M | $0 | — | 20,957.1 | 23,483.2 | 19.4% | $0.25 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $1.08M | $0 | — | 38,386.2 | 37,134.2 | 33.9% | $0.50 | View |
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $1.07M | $0 | — | 17,517.7 | 20,101.0 | 12.1% | $0.50 | View |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $1.05M | $0 | — | 30,080.0 | — | 27.5% | $0.50 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $1.04M | $0 | — | 22,415.2 | 22,151.3 | 27.8% | $0.68 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $1.01M | $0 | — | 21,188.8 | 22,431.4 | 31.1% | $0.71 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $1.01M | $0 | — | 33,164.7 | 33,922.3 | 22.0% | $0.50 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $1.00M | $0 | — | 24,877.6 | 24,543.6 | 28.9% | $0.50 | View |
| Gunnedah Solar Farm | GNNDHSF1 |
NSW1 | Solar PV - Single axis tracking | $990.4k | $0 | — | 20,150.5 | 20,403.2 | 25.4% | $0.33 | View |
| Kiamal Solar Farm - Stage 1 | KIAMSF1 |
VIC1 | Solar PV - Single axis tracking | $969.9k | $0 | — | 22,762.8 | 22,201.7 | 15.8% | $0.00 | View |
| Sunraysia Solar Farm | SUNRSF1 |
NSW1 | Solar PV - Single axis tracking | $937.2k | $0 | — | 20,563.8 | 20,000.4 | 12.5% | $0.25 | View |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $925.1k | $0 | — | 27,392.5 | — | 19.8% | $0.50 | View |
| Wellington Solar Farm | WELLSF1 |
NSW1 | Solar PV - Single axis tracking | $907.0k | $0 | — | 18,903.2 | 20,724.6 | 12.2% | $0.25 | View |
| Bungala Two Solar Farm | BNGSF2 |
SA1 | Solar PV - Single axis tracking | $901.6k | $0 | — | 14,437.5 | 14,421.6 | 14.9% | $0.33 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $899.8k | $0 | — | 19,542.8 | 19,321.4 | 26.5% | $0.69 | View |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $896.1k | $0 | — | 32,519.2 | 33,132.0 | 31.3% | $0.50 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $895.6k | $0 | — | 25,230.3 | 34,279.4 | 28.8% | $0.53 | View |
| Supernode BESS | SNB01 |
QLD1 | Storage - Battery | $881.6k | $3.0k | 945.7 | -2,757.7 | 147,222.6 | -1.5% | $1.50 | View |
| Kareeya | KAREEYA1 |
QLD1 | Hydro - Run of River | $861.8k | $0 | — | 13,977.6 | 14,140.0 | 89.9% | $1.00 | View |
| Kareeya | KAREEYA3 |
QLD1 | Hydro - Run of River | $861.4k | $7 | 0.9 | 13,999.7 | 14,140.0 | 90.0% | $1.05 | View |
| Kareeya | KAREEYA4 |
QLD1 | Hydro - Run of River | $861.2k | $0 | — | 13,936.6 | 14,140.0 | 89.6% | $1.66 | View |
| Guthega | GUTHEGA |
NSW1 | Hydro - Dam | $859.1k | $0 | — | 9,149.7 | 47,407.3 | 21.2% | $1.05 | View |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $852.6k | $0 | — | 27,374.4 | 29,920.4 | 29.0% | $0.50 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $852.5k | $0 | — | 28,077.1 | 26,820.0 | 28.1% | $0.50 | View |
| Coleambally Solar Farm | COLEASF1 |
NSW1 | Solar PV - Single axis tracking | $844.9k | $0 | — | 17,823.5 | 17,168.8 | 16.5% | $0.00 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $844.5k | $0 | — | 25,583.3 | 25,207.9 | 28.2% | $0.74 | View |
| Quarantine | QPS1 |
SA1 | Turbine - OCGT | $838.0k | $0 | — | 3,739.4 | 18,446.4 | 17.9% | $128.50 | View |
| Moranbah North | MBAHNTH |
QLD1 | Reciprocating Engine - Spark ignition | $835.4k | $0 | — | 13,338.8 | — | 29.0% | $57.00 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $833.2k | $0 | — | 12,924.3 | 12,507.1 | 38.6% | $0.50 | View |
| Columboola Solar Farm | COLUMSF1 |
QLD1 | Solar PV - Single axis tracking | $818.1k | $0 | — | 29,706.5 | 29,049.8 | 19.0% | $0.32 | View |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $817.7k | $0 | — | 28,611.4 | 29,322.6 | 36.4% | $0.65 | View |
| Barron Gorge | BARRON-1 |
QLD1 | Hydro - Run of River | $816.0k | $0 | — | 10,643.4 | 17,996.7 | 42.2% | $0.00 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $815.9k | $0 | — | 15,311.2 | 17,667.9 | 26.4% | $0.79 | View |
| Metz Solar Farm | METZSF1 |
NSW1 | Solar PV - Single axis tracking | $804.0k | $0 | — | 16,734.0 | 16,506.4 | 17.2% | $0.25 | View |
| Brendale BESS | BRNDBES1 |
QLD1 | Storage - Battery | $801.3k | $14.1k | 6,785.2 | -3,717.6 | 125,696.2 | -2.5% | $1.58 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $799.8k | $0 | — | 14,896.7 | 16,942.8 | 16.4% | $0.50 | View |
| Quarantine | QPS3 |
SA1 | Turbine - OCGT | $799.7k | $0 | — | 3,436.0 | 18,334.1 | 16.5% | $128.50 | View |
| Western Downs Gas Peaking Plant - KCI | WDBESS2 |
QLD1 | Turbine - CCGT | $790.5k | $37.6k | 26,264.8 | -4,446.6 | 157,612.6 | -1.5% | $2.00 | View |
| Tailem Bend - Solar | TBSF1 |
SA1 | Solar PV - Fixed | $776.4k | $0 | — | 11,945.3 | 12,329.5 | 15.4% | $0.20 | View |
| Nyngan Solar Plant | NYNGAN1 |
NSW1 | Solar PV - Fixed | $768.0k | $0 | — | 14,105.8 | 16,007.6 | 19.2% | $0.20 | View |
| Repulse | REPULSE |
TAS1 | Hydro - Dam | $753.0k | $0 | — | 12,352.6 | — | 61.3% | $1.00 | View |
| Edenvale Solar Park | EDENVSF1 |
QLD1 | Solar PV - Single axis tracking | $746.3k | $0 | — | 27,928.3 | 27,385.1 | 21.5% | $0.00 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $746.1k | $0 | — | 12,394.4 | 11,860.6 | 29.9% | $0.76 | View |
| Western Downs Battery - Stage 1 And 2 | WDBESS1 |
QLD1 | Storage - Battery | $746.1k | $27.5k | 15,197.3 | -4,234.5 | 159,597.0 | -2.3% | $1.58 | View |
| Uranquinty | URANQ13 |
NSW1 | Turbine - OCGT | $704.9k | $0 | — | 4,713.9 | 104,404.4 | 3.8% | $128.50 | View |
| Broadwater | BWTR1 |
NSW1 | Turbine - Steam Sub Critical | $691.2k | $0 | — | 9,015.6 | — | 33.0% | $124.22 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $689.3k | $0 | — | 27,663.3 | 28,155.1 | 16.0% | $0.00 | View |
| Walla Walla Solar Farm | WLWLSF1 |
NSW1 | Solar PV - Single axis tracking | $685.3k | $0 | — | 13,614.3 | 14,675.1 | 12.4% | $0.25 | View |
| Walla Walla Solar Farm | WLWLSF2 |
NSW1 | Solar PV - Single axis tracking | $683.4k | $0 | — | 13,640.6 | 14,700.4 | 12.5% | $0.25 | View |
| Paloona | PALOONA |
TAS1 | Hydro - Dam | $680.2k | $0 | — | 10,803.0 | — | 53.6% | $1.00 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $678.2k | $0 | — | 29,207.1 | 29,042.8 | 19.8% | $0.00 | View |
| Nevertire Solar Farm | NEVERSF1 |
NSW1 | Solar PV - Single axis tracking | $677.1k | $0 | — | 13,766.9 | 14,816.0 | 18.3% | $0.25 | View |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $675.1k | $0 | — | 9,949.2 | 11,243.2 | 22.3% | $0.53 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $670.0k | $0 | — | 10,969.4 | 14,187.4 | 28.2% | $0.50 | View |
| Port Augusta Renewable Energy Park - Solar | PAREPS1 |
SA1 | Solar PV - Fixed | $669.3k | $0 | — | 9,503.8 | 10,959.0 | 13.3% | $0.20 | View |
| Wandoan South Solar Stage 1 | WANDSF1 |
QLD1 | Solar PV - Single axis tracking | $667.8k | $0 | — | 16,781.8 | 22,728.4 | 14.6% | $0.25 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $667.7k | $0 | — | 10,874.9 | 10,345.3 | 31.3% | $0.50 | View |
| Swanbank E GT | SWAN_E |
QLD1 | Turbine - CCGT | $656.2k | $0 | — | 5,092.6 | 5,910.1 | 1.8% | $2.00 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $650.0k | $0 | — | 23,027.3 | 22,773.4 | 22.2% | $0.50 | View |
| Glenrowan West Solar Farm | GLRWNSF1 |
VIC1 | Solar PV - Single axis tracking | $638.1k | $0 | — | 12,213.4 | 12,360.2 | 12.9% | $0.32 | View |
| Greenbank BESS | GREENB1 |
QLD1 | Storage - Battery | $630.9k | $3.7k | 53,033.3 | -2,362.1 | 109,012.2 | -1.6% | $1.54 | View |
| Hillston Sun Farm | HILLSTN1 |
NSW1 | Solar PV - Single axis tracking | $624.2k | $0 | — | 12,737.4 | 12,353.3 | 16.1% | $0.00 | View |
| Bungala One Solar Farm | BNGSF1 |
SA1 | Solar PV - Single axis tracking | $623.8k | $0 | — | 10,186.1 | 9,776.2 | 10.5% | $0.34 | View |
| Woolooga Solar Farm | WOOLGSF1 |
QLD1 | Solar PV - Single axis tracking | $616.0k | $0 | — | 21,895.0 | 23,208.4 | 13.7% | $0.25 | View |
| Glenrowan Solar Farm | GLENSF1 |
VIC1 | Solar PV - Single axis tracking | $615.2k | $0 | — | 12,307.0 | 12,005.8 | 13.6% | $0.25 | View |
| Glenellen Solar Farm | GESF1 |
NSW1 | Solar PV - Fixed | $614.9k | $0 | — | 11,648.5 | 13,598.2 | 6.2% | $0.00 | View |
| Beryl Solar Farm | BERYLSF1 |
NSW1 | Solar PV - Single axis tracking | $585.5k | $0 | — | 11,813.7 | 11,645.8 | 16.7% | $0.25 | View |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $584.6k | $0 | — | 16,871.4 | 19,370.5 | 23.7% | $0.50 | View |
| Numurkah Solar Farm | NUMURSF1 |
VIC1 | Solar PV - Single axis tracking | $583.5k | $0 | — | 11,065.1 | 11,853.0 | 15.2% | $0.25 | View |
| Ulinda Park BESS | ULPBESS1 |
QLD1 | Storage - Battery | $582.7k | $13.1k | 6,225.6 | -3,547.6 | 103,175.3 | -3.2% | $1.50 | View |
| Bairnsdale | BDL01 |
VIC1 | Turbine - OCGT | $580.6k | $0 | — | 2,302.7 | 30,623.2 | 6.8% | $142.10 | View |
| Tamar Valley Peaking | TVPP104 |
TAS1 | Turbine - OCGT | $578.2k | $0 | — | 1,834.1 | 21,847.8 | 4.4% | $128.50 | View |
| BRDDSF01 | BRDDSF01 |
QLD1 | $576.6k | $0 | — | 25,492.3 | 28,412.9 | 9.6% | $0.27 | View | |
| Barron Gorge | BARRON-2 |
QLD1 | Hydro - Run of River | $572.4k | $0 | — | 6,542.0 | 11,240.6 | 26.0% | $0.00 | View |
| Sebastopol Solar Farm | SEBSF1 |
NSW1 | Solar PV - Single axis tracking | $569.4k | $0 | — | 11,031.8 | 10,993.1 | 17.0% | $0.25 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $564.0k | $0 | — | 12,919.7 | 13,583.5 | 25.1% | $0.00 | View |
| West Wyalong Solar Farm | WSTWYSF1 |
NSW1 | Solar PV - Single axis tracking | $557.0k | $0 | — | 10,973.2 | 10,996.0 | 14.5% | $0.25 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $554.8k | $0 | — | 11,104.1 | 12,670.6 | 17.8% | $0.50 | View |
| Tallawarra | TALWA1 |
NSW1 | Turbine - CCGT | $554.5k | $0 | — | 5,324.8 | 6,915.4 | 1.8% | $84.30 | View |
| Gangarri Solar Farm | GANGARR1 |
QLD1 | Solar PV - Single axis tracking | $546.5k | $0 | — | 17,077.2 | 17,931.9 | 14.6% | $0.26 | View |
| Condong | CONDONG1 |
NSW1 | Turbine - Steam Sub Critical | $543.3k | $0 | — | 7,318.9 | — | 33.9% | $112.12 | View |
| Daydream Solar Farm | DAYDSF1 |
QLD1 | Solar PV - Single axis tracking | $537.2k | $0 | — | 19,986.5 | 19,877.2 | 16.5% | $0.00 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $531.9k | $0 | — | 18,758.6 | 19,571.2 | 31.2% | $0.53 | View |
| Kareeya | KAREEYA2 |
QLD1 | Hydro - Run of River | $529.5k | $0 | — | 8,504.3 | 8,582.8 | 54.7% | $1.00 | View |
| Limondale BESS | LIMBESS1 |
NSW1 | Storage - Battery | $528.9k | $0 | — | -1,421.1 | 34,136.2 | -3.9% | $1.50 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $506.0k | $0 | — | 9,719.5 | 9,950.3 | 29.3% | $0.50 | View |
| Uranquinty | URANQ14 |
NSW1 | Turbine - OCGT | $504.3k | $0 | — | 3,200.5 | 103,238.3 | 2.6% | $128.50 | View |
| Bluegrass Solar Farm | BLUEGSF1 |
QLD1 | Solar PV - Single axis tracking | $492.8k | $0 | — | 18,183.6 | 17,758.9 | 17.1% | $0.29 | View |
| SHGEN | SHGEN |
NSW1 | $485.9k | $0 | — | 4,518.7 | 38,150.0 | 2.5% | $1.20 | View | |
| Goonumbla Solar Farm | GOONSF1 |
NSW1 | Solar PV - Single axis tracking | $474.0k | $0 | — | 9,178.6 | 9,505.4 | 18.3% | $0.25 | View |
| Wemen Solar Farm | WEMENSF1 |
VIC1 | Solar PV - Single axis tracking | $464.9k | $0 | — | 10,473.4 | 10,310.6 | 14.9% | $0.25 | View |
| Bomen Solar Farm | BOMENSF1 |
NSW1 | Solar PV - Single axis tracking | $462.5k | $0 | — | 9,127.5 | 8,992.8 | 10.5% | $0.25 | View |
| Haughton Solar Farm Stage 1 | HAUGHT11 |
QLD1 | Solar PV - Single axis tracking | $461.2k | $0 | — | 17,134.5 | 16,748.0 | 17.9% | $0.00 | View |
| Mannum BESS | MANNUMB1 |
SA1 | Storage - Battery | $454.4k | $5.7k | 337.3 | -1,152.1 | 67,915.7 | -1.6% | $1.50 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $453.3k | $0 | — | 7,013.1 | 6,851.6 | 22.5% | $0.68 | View |
| Eildon | EILDON2 |
VIC1 | Hydro - Dam | $452.6k | $0 | — | 2,555.3 | 27,205.8 | 5.3% | $1.00 | View |
| Munna Creek Solar Farm | MUCRKSF1 |
QLD1 | Solar PV - Single axis tracking | $452.5k | $0 | — | 14,123.9 | 16,982.3 | 12.7% | $0.25 | View |
| Cluny | CLUNY |
TAS1 | Hydro - Dam | $452.4k | $0 | — | 7,495.9 | — | 54.8% | $1.00 | View |
| Poatina | POAT110 |
TAS1 | Hydro - Dam | $451.0k | $85.5k | 5,984.4 | 3,922.8 | 11,715.0 | 5.4% | $1.00 | View |
| Sun Metals Corporation Solar Farm | SMCSF1 |
QLD1 | Solar PV - Fixed | $448.0k | $0 | — | 16,129.5 | 16,877.7 | 15.7% | $0.00 | View |
| Uranquinty | URANQ11 |
NSW1 | Turbine - OCGT | $448.0k | $0 | — | 2,840.8 | 103,656.5 | 2.3% | $128.50 | View |
| Karadoc Solar Farm | KARSF1 |
VIC1 | Solar PV - Single axis tracking | $445.2k | $0 | — | 9,908.2 | 9,949.6 | 13.2% | $0.00 | View |
| Winton Solar Farm | WINTSF1 |
VIC1 | Solar PV - Single axis tracking | $438.8k | $0 | — | 8,958.1 | 8,719.8 | 14.6% | $0.25 | View |
| Lake Echo | LK_ECHO |
TAS1 | Hydro - Dam | $432.4k | $0 | — | 3,017.7 | 5,106.2 | 12.9% | $1.17 | View |
| Girgarre Solar Farm | GIRGSF |
VIC1 | Solar PV - Single axis tracking | $432.2k | $0 | — | 8,410.2 | 8,812.3 | 12.5% | $0.00 | View |
| Darling Downs Solar Farm | DDSF1 |
QLD1 | Solar PV - Fixed | $429.6k | $0 | — | 17,191.4 | 16,869.2 | 19.7% | $0.28 | View |
| Ross River Solar Farm | RRSF1 |
QLD1 | Solar PV - Single axis tracking | $428.1k | $0 | — | 17,354.0 | 17,518.5 | 18.8% | $0.25 | View |
| Victorian Big Battery | VBB1 |
VIC1 | Storage - Battery | $428.1k | $11.5k | 10,200.3 | -5,035.8 | 124,327.8 | -2.3% | $1.50 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $426.2k | $0 | — | 10,136.1 | 10,468.2 | 24.4% | $0.53 | View |
| Wyalong Solar Farm | WYASF1 |
NSW1 | Solar PV - Single axis tracking | $419.8k | $0 | — | 8,241.5 | 8,334.5 | 18.4% | $0.25 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $417.1k | $0 | — | 7,276.3 | 8,562.2 | 25.9% | $0.53 | View |
| Clare Solar Farm | CLARESF1 |
QLD1 | Solar PV - Single axis tracking | $416.0k | $0 | — | 13,106.3 | 15,944.4 | 16.5% | $0.00 | View |
| Gunsynd Solar Farm | GUSF1 |
QLD1 | Solar PV - Fixed | $412.0k | $0 | — | 14,167.0 | 14,700.3 | 20.9% | $0.00 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $411.1k | $0 | — | 13,040.1 | 13,140.1 | 20.0% | $0.50 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $406.6k | $0 | — | 15,440.4 | 16,380.6 | 26.8% | $0.68 | View |
| Yarranlea Solar Farm | YARANSF1 |
QLD1 | Solar PV - Single axis tracking | $406.1k | $0 | — | 12,703.1 | 14,508.3 | 14.6% | $0.25 | View |
| Wunghnu Solar Farm | WUNUSF1 |
VIC1 | Solar PV - Single axis tracking | $400.6k | $0 | — | 7,633.8 | 8,330.6 | 11.3% | $0.25 | View |
| LaTrobe Valley BESS | LVES1 |
VIC1 | Storage - Battery | $398.6k | $5.7k | 145,864.1 | -1,615.7 | 61,023.2 | -2.2% | $1.54 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $397.4k | $0 | — | 9,072.4 | 10,438.8 | 17.4% | $0.50 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $386.1k | $0 | — | 6,144.6 | — | 28.4% | $0.68 | View |
| Eildon | EILDON1 |
VIC1 | Hydro - Dam | $378.5k | $0 | — | 2,075.3 | 26,780.1 | 4.3% | $1.05 | View |
| Broken Hill Solar Plant | BROKENH1 |
NSW1 | Solar PV - Fixed | $374.7k | $0 | — | 7,558.9 | 7,847.8 | 19.8% | $0.28 | View |
| Bannerton Solar Park | BANN1 |
VIC1 | Solar PV - Single axis tracking | $372.0k | $0 | — | 8,884.1 | 8,753.3 | 12.3% | $0.34 | View |
| Parkes Solar Farm | PARSF1 |
NSW1 | Solar PV - Single axis tracking | $371.3k | $0 | — | 7,262.3 | 7,445.8 | 20.4% | $0.25 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $360.0k | $0 | — | 14,249.6 | 13,916.3 | 29.5% | $0.50 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $353.7k | $0 | — | 9,561.9 | 9,783.9 | 25.3% | $0.77 | View |
| Smithfield Energy Facility | SITHE01 |
NSW1 | Turbine - OCGT | $341.0k | $0 | — | 1,867.3 | 1,867.3 | 2.1% | $128.50 | View |
| Quarantine | QPS2 |
SA1 | Turbine - OCGT | $338.4k | $0 | — | 1,523.6 | 13,905.7 | 8.8% | $128.50 | View |
| Tallawarra B | TALWB1 |
NSW1 | Turbine - OCGT | $337.8k | $0 | — | 1,519.0 | 220,263.7 | 0.7% | $128.50 | View |
| German Creek | GERMCRK |
QLD1 | Reciprocating Engine - Spark ignition | $337.5k | $0 | — | 5,774.1 | — | 17.8% | $122.81 | View |
| Clermont Solar Farm | CLERMSF1 |
QLD1 | Solar PV - Single axis tracking | $337.3k | $0 | — | 12,247.0 | 12,443.1 | 18.4% | $0.34 | View |
| KIATAWF1 | KIATAWF1 |
VIC1 | $333.5k | $0 | — | 8,343.9 | 8,549.8 | 37.3% | $0.68 | View | |
| Blyth BESS | BLYTHB1 |
SA1 | Storage - Battery | $329.4k | $41.2k | 58,195.0 | -5,029.4 | 139,231.5 | -3.5% | $4.86 | View |
| Finley Solar Farm | FINLYSF1 |
NSW1 | Solar PV - Single axis tracking | $328.3k | $0 | — | 6,637.7 | 6,411.6 | 5.7% | $0.25 | View |
| Torrens Island BESS | TIB1 |
SA1 | Storage - Battery | $318.3k | $39.3k | 130,744.7 | -3,321.6 | 123,295.1 | -1.8% | $1.50 | View |
| Lilyvale Solar Farm | LILYSF1 |
QLD1 | Solar PV - Single axis tracking | $315.4k | $0 | — | 10,488.6 | 11,414.5 | 12.3% | $0.25 | View |
| Jemalong Solar | JEMALNG1 |
NSW1 | Solar PV - Single axis tracking | $303.1k | $0 | — | 5,886.6 | 6,577.8 | 14.9% | $0.32 | View |
| Emerald Solar Park | EMERASF1 |
QLD1 | Solar PV - Single axis tracking | $302.3k | $0 | — | 10,861.1 | 10,776.0 | 21.0% | $0.25 | View |
| Clements Gap - BESS | CGBESS01 |
SA1 | Storage - Battery | $299.2k | $0 | — | -1,044.9 | 37,955.8 | -2.4% | $1.58 | View |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $297.7k | $0 | — | 8,894.5 | 12,297.6 | 26.7% | $0.66 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $296.4k | $0 | — | 8,679.7 | 8,664.3 | 21.3% | $0.80 | View |
| Rugby Run Solar Farm | RUGBYR1 |
QLD1 | Solar PV - Single axis tracking | $283.1k | $0 | — | 10,526.2 | 10,516.8 | 22.5% | $0.25 | View |
| Yatpool Solar Farm | YATSF1 |
VIC1 | Solar PV - Single axis tracking | $275.9k | $0 | — | 6,591.1 | 6,536.0 | 9.7% | $0.25 | View |
| Chinchilla BESS | CHBESS1 |
QLD1 | Storage - Battery | $263.6k | $1.3k | 25,640.5 | -1,005.5 | 46,480.8 | -1.4% | $1.75 | View |
| Rocky Point Sugar Mill Cogeneration Plant | RPCG |
QLD1 | Other - Other | $261.8k | $0 | — | 3,956.2 | — | 18.3% | $117.00 | View |
| Wagga North Solar Farm | WAGGNSF1 |
NSW1 | Solar PV - Single axis tracking | $261.0k | $0 | — | 5,177.2 | 5,182.9 | 12.9% | $0.25 | View |
| Mokoan Solar Farm (LightsourceBP) | MOKOSF1 |
VIC1 | Solar PV - Single axis tracking | $254.3k | $0 | — | 4,828.8 | 5,020.9 | 14.6% | $0.25 | View |
| Capital Battery | CAPBES1 |
NSW1 | Storage - Battery | $248.1k | $0 | — | -983.4 | 57,851.7 | -1.4% | $1.50 | View |
| Tully Sugar Mill | TULLYSM1 |
QLD1 | Turbine - Steam Super Critical | $239.5k | $0 | — | 3,762.8 | — | 16.3% | $117.00 | View |
| Rowallan | ROWALLAN |
TAS1 | Hydro - Dam | $235.8k | $0 | — | 3,921.3 | — | 51.9% | $1.00 | View |
| Susan River Solar Farm | SRSF1 |
QLD1 | Solar PV - Single axis tracking | $235.2k | $0 | — | 9,218.6 | 9,079.9 | 15.0% | $0.25 | View |
| Moree Solar Farm | MOREESF1 |
NSW1 | Solar PV - Single axis tracking | $234.3k | $0 | — | 4,961.3 | 4,779.3 | 12.3% | $0.25 | View |
| Manildra Solar Farm | MANSLR1 |
NSW1 | Solar PV - Single axis tracking | $225.1k | $0 | — | 3,995.4 | 4,650.5 | 11.1% | $0.25 | View |
| Lancaster Solar Farm | LANCSF1 |
VIC1 | Solar PV - Single axis tracking | $225.0k | $0 | — | 3,745.1 | 4,210.9 | 4.9% | $0.25 | View |
| Kidston Solar Project Phase One 50MW | KSP1 |
QLD1 | Solar PV - Fixed | $224.4k | $0 | — | 7,699.9 | 8,526.9 | 21.4% | $0.20 | View |
| Terang BESS | TRGBESS1 |
VIC1 | Storage - Battery | $222.9k | $0 | — | -469.0 | 1,367.5 | -0.7% | $1.50 | View |
| Oakey 2 Solar Farm | OAKEY2SF |
QLD1 | Solar PV - Single axis tracking | $221.5k | $0 | — | 7,010.7 | 7,822.7 | 17.5% | $0.25 | View |
| Uranquinty | URANQ12 |
NSW1 | Turbine - OCGT | $215.3k | $0 | — | 1,094.7 | 103,844.4 | 0.9% | $128.50 | View |
| Hornsdale Power Reserve Unit 1 | HPR1 |
SA1 | Storage - Battery | $208.9k | $29.5k | 12,375.5 | -1,792.1 | 51,906.3 | -1.7% | $1.50 | View |
| Childers Solar Farm | CHILDSF1 |
QLD1 | Solar PV - Single axis tracking | $207.8k | $0 | — | 7,943.6 | 7,851.9 | 17.1% | $0.34 | View |
| Hazelwood Battery Energy Storage System (HBESS) | HBESS1 |
VIC1 | Storage - Battery | $206.8k | $13.9k | 12,778.9 | -2,739.5 | 88,544.9 | -1.9% | $1.87 | View |
| Molong Solar Farm | MOLNGSF1 |
NSW1 | Solar PV - Single axis tracking | $205.7k | $0 | — | 3,782.0 | 4,268.5 | 14.6% | $0.25 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $194.5k | $0 | — | 5,596.9 | 5,497.3 | 23.6% | $0.50 | View |
| Kingaroy Solar Farm | KINGASF1 |
QLD1 | Solar PV - Single axis tracking | $191.3k | $0 | — | 5,756.3 | 6,732.7 | 20.0% | $0.25 | View |
| Quarantine | QPS4 |
SA1 | Turbine - OCGT | $190.8k | $0 | — | 472.7 | 14,338.2 | 2.7% | $128.50 | View |
| Junee Solar Farm | JUNEESF1 |
NSW1 | Solar PV - Single axis tracking | $185.4k | $0 | — | 3,565.0 | 3,563.6 | 13.7% | $0.00 | View |
| Corowa Solar Farm | CRWASF1 |
NSW1 | Solar PV - Single axis tracking | $184.5k | $0 | — | 3,641.6 | 3,557.9 | 14.0% | $0.33 | View |
| Wandoan South BESS | WANDB1 |
QLD1 | Storage - Battery | $182.9k | $18.5k | 138,826.6 | -1,434.1 | 48,816.0 | -2.0% | $1.50 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $177.4k | $0 | — | 6,346.6 | — | 16.8% | $0.53 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $174.0k | $0 | — | 5,200.5 | — | 24.1% | $0.50 | View |
| Limondale Solar Farm 2 | LIMOSF21 |
NSW1 | Solar PV - Single axis tracking | $171.9k | $0 | — | 3,664.4 | 3,601.3 | 17.6% | $0.25 | View |
| Gannawarra Solar Farm | GANNSF1 |
VIC1 | Solar PV - Single axis tracking | $168.2k | $0 | — | 4,004.4 | 3,813.1 | 10.1% | $0.34 | View |
| Riverina Energy Storage System 1 | RESS1 |
NSW1 | Storage - Battery | $165.7k | $0 | — | -601.9 | 26,658.8 | -1.4% | $1.50 | View |
| Hayman Solar Farm | HAYMSF1 |
QLD1 | Solar PV - Single axis tracking | $165.5k | $0 | — | 6,135.2 | 6,285.9 | 14.8% | $0.34 | View |
| Bell Bay Three | BBTHREE3 |
TAS1 | Turbine - OCGT | $160.7k | $0 | — | 184.2 | 15,763.0 | 0.6% | $141.97 | View |
| Whitsunday Solar Farm | WHITSF1 |
QLD1 | Solar PV - Single axis tracking | $159.6k | $0 | — | 6,151.6 | 6,667.6 | 14.9% | $0.25 | View |
| Smithfield BESS | SMTHBES1 |
NSW1 | Storage - Battery | $153.4k | $10.7k | 101,824.7 | -1,049.8 | 40,220.7 | -1.7% | $1.50 | View |
| Riverina Energy Storage System 2 | RIVNB2 |
NSW1 | Storage - Battery | $152.2k | $39 | 21.3 | -514.1 | 15,974.5 | -1.1% | $1.50 | View |
| Hamilton Solar Farm | HAMISF1 |
QLD1 | Solar PV - Single axis tracking | $149.6k | $0 | — | 5,762.8 | 6,234.3 | 13.9% | $18.64 | View |
| Port Stanvac 1 | PTSTAN1 |
SA1 | Reciprocating Engine - Compression ignition | $143.2k | $0 | — | 169.9 | 37,889.2 | 0.4% | $308.00 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $140.0k | $0 | — | 4,177.3 | — | 20.2% | $0.50 | View |
| White Rock Solar Farm | WRSF1 |
NSW1 | Solar PV - Fixed | $132.3k | $0 | — | 2,804.2 | 2,768.0 | 19.5% | $0.20 | View |
| Mannum Solar Farm 2 | MANNSF2 |
SA1 | Solar PV - Single axis tracking | $130.6k | $0 | — | 2,427.5 | 2,518.4 | 11.2% | $0.25 | View |
| Collinsville PV | CSPVPS1 |
QLD1 | Solar PV - Fixed | $129.8k | $0 | — | 5,524.5 | 5,903.2 | 18.1% | $0.28 | View |
| Griffith Solar Farm | GRIFSF1 |
NSW1 | Solar PV - Single axis tracking | $127.6k | $0 | — | 2,670.0 | — | 13.6% | $0.35 | View |
| Moura Solar Farm | MOUSF1 |
QLD1 | Solar PV - Single axis tracking | $126.7k | $0 | — | 6,283.7 | 5,840.3 | 8.8% | $0.25 | View |
| Butlers Gorge | BUTLERSG |
TAS1 | Hydro - Dam | $121.2k | $0 | — | 2,048.6 | — | 23.3% | $1.00 | View |
| Bouldercombe Battery project | BBATTERY1 |
QLD1 | Storage - Battery | $114.1k | $14.6k | 14,864.6 | -560.8 | 29,727.7 | -1.6% | $1.64 | View |
| BRDDBES1 | BRDDBES1 |
QLD1 | $111.7k | $0 | — | -785.6 | 51,793.0 | -0.3% | $0.27 | View | |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $106.4k | $0 | — | 3,485.5 | — | 24.8% | $0.50 | View |
| Warwick Solar Farm | WARWSF1 |
QLD1 | Solar PV - Single axis tracking | $106.1k | $0 | — | 2,788.7 | 3,622.9 | 12.1% | $0.25 | View |
| Hunter Power Station | HUNTER2 |
NSW1 | Turbine - OCGT | $104.2k | $0 | — | 1,066.9 | 1,264.2 | 0.4% | $152.46 | View |
| Maryrorough Solar Farm | MARYRSF1 |
QLD1 | Solar PV - Single axis tracking | $102.7k | $0 | — | 3,488.5 | 3,819.8 | 14.0% | $0.25 | View |
| Oakey Solar Farm | OAKEY1SF |
QLD1 | Solar PV - Fixed | $102.6k | $0 | — | 3,506.5 | 3,650.6 | 19.5% | $0.20 | View |
| Middlemount Solar Farm | MIDDLSF1 |
QLD1 | Solar PV - Single axis tracking | $100.9k | $0 | — | 3,096.4 | 3,925.3 | 16.5% | $0.25 | View |
| Mulwala Solar Farm | MULWASF1 |
NSW1 | Solar PV - Single axis tracking | $100.9k | $0 | — | 1,871.1 | 2,822.7 | 8.4% | $0.25 | View |
| Adelaide Desalination Plant | ADPPV1 |
SA1 | Solar PV - Fixed | $98.8k | $0 | — | 1,452.5 | 1,529.5 | 18.3% | $0.00 | View |
| Warwick Solar Farm | WARWSF2 |
QLD1 | Solar PV - Single axis tracking | $97.4k | $0 | — | 2,545.9 | 3,285.7 | 11.0% | $0.25 | View |
| Bell Bay Three | BBTHREE1 |
TAS1 | Turbine - OCGT | $96.6k | $0 | — | 65.2 | 17,420.8 | 0.2% | $182.63 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $78.4k | $0 | — | 2,044.4 | — | 35.5% | $0.00 | View |
| Braemar | BRAEMAR3 |
QLD1 | Turbine - OCGT | $70.8k | $0 | — | 612.7 | 127,465.7 | 0.5% | $128.50 | View |
| Lake Bonney Battery Energy Storage | LBB1 |
SA1 | Storage - Battery | $69.1k | $5.4k | 43,748.5 | -126.6 | 14,178.7 | -0.7% | $1.98 | View |
| Gullen Range Solar Farm | GULLRSF1 |
NSW1 | Solar PV - Fixed | $67.8k | $0 | — | 1,289.9 | 1,269.6 | 17.9% | $0.27 | View |
| Townsville Power Station | YABULU |
QLD1 | Turbine - CCGT | $67.4k | $0 | — | 595.1 | 595.1 | 0.5% | $84.30 | View |
| Hunter Power Station | HUNTER1 |
NSW1 | Turbine - OCGT | $65.3k | $0 | — | 841.2 | 864.8 | 0.3% | $142.99 | View |
| Barcaldine Remote Community Solar Farm | BARCSF1 |
QLD1 | Solar PV - Single axis tracking | $61.2k | $0 | — | 1,900.1 | — | 13.2% | $0.00 | View |
| Wallgrove Grid Battery project | WALGRV1 |
NSW1 | Storage - Battery | $60.9k | $2.1k | 67,400.5 | -406.3 | 23,955.2 | -1.1% | $1.50 | View |
| Braemar 2 Power Station | BRAEMAR6 |
QLD1 | Turbine - OCGT | $60.5k | $0 | — | 438.5 | 110,888.8 | 0.4% | $133.36 | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | MBPS2PV1 |
SA1 | Solar PV - Single axis tracking | $59.7k | $0 | — | 805.9 | 901.8 | 8.1% | $0.25 | View |
| Bolivar Waste Water Treatment | BOWWPV1 |
SA1 | Solar PV - Fixed | $58.9k | $0 | — | 822.5 | 848.6 | 13.8% | $0.23 | View |
| Darlington Point Energy Storage System | DPNTB1 |
NSW1 | Storage - Battery | $57.8k | $0 | — | -208.2 | 6,143.7 | -1.2% | $0.00 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | MAPS2PV1 |
SA1 | Solar PV - Single axis tracking | $57.6k | $0 | — | 856.8 | 875.8 | 7.2% | $0.26 | View |
| Longreach Solar Farm | LRSF1 |
QLD1 | Solar PV - Fixed | $54.8k | $0 | — | 1,846.2 | — | 17.1% | $0.20 | View |
| Tailem Bend Battery Project | TB2B1 |
SA1 | Storage - Battery | $54.4k | $18.2k | 47,371.9 | -739.3 | 26,899.1 | -2.5% | $1.50 | View |
| Gannawarra Energy Storage System | GANNB1 |
VIC1 | Storage - Battery | $54.1k | $0 | — | -254.9 | 7,697.4 | -1.4% | $1.98 | View |
| Royalla Solar Farm | ROYALLA1 |
NSW1 | Solar PV - Fixed | $53.2k | $0 | — | 1,018.3 | — | 7.1% | $0.20 | View |
| Happy Valley Reservoir | HVWWPV1 |
SA1 | Solar PV - Single axis tracking | $52.3k | $0 | — | 713.7 | 736.5 | 9.0% | $0.00 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | MAPS3PV1 |
SA1 | Solar PV - Single axis tracking | $51.2k | $0 | — | 741.2 | 766.0 | 6.2% | $0.25 | View |
| Dry Creek GT | DRYCGT1 |
SA1 | Turbine - OCGT | $49.2k | $0 | — | 47.7 | 32,908.5 | 0.1% | $141.50 | View |
| Broken Hill | BHB1 |
NSW1 | Storage - Battery | $46.2k | $0 | — | -342.6 | 16,371.5 | -1.0% | $1.50 | View |
| Colongra | CG2 |
NSW1 | Turbine - OCGT | $39.0k | $0 | — | 279.4 | 121,669.7 | 0.2% | $135.55 | View |
| Hughenden Sun Farm | HUGSF1 |
QLD1 | Solar PV - Single axis tracking | $38.8k | $0 | — | 1,554.8 | — | 10.3% | $0.00 | View |
| Valley Power | VPGS1 |
VIC1 | Turbine - OCGT | $37.9k | $0 | — | 266.0 | 39,366.7 | 0.7% | $128.50 | View |
| Valley Power | VPGS3 |
VIC1 | Turbine - OCGT | $36.3k | $0 | — | 256.0 | 39,375.2 | 0.7% | $128.50 | View |
| Valley Power | VPGS2 |
VIC1 | Turbine - OCGT | $33.2k | $0 | — | 210.7 | 39,274.3 | 0.6% | $128.50 | View |
| Condamine A | CPSA |
QLD1 | Turbine - CCGT | $32.4k | $0 | — | 268.0 | 580.5 | 0.4% | $95.40 | View |
| Valley Power | VPGS5 |
VIC1 | Turbine - OCGT | $31.3k | $0 | — | 194.9 | 37,739.5 | 0.5% | $128.50 | View |
| Valley Power | VPGS6 |
VIC1 | Turbine - OCGT | $31.3k | $0 | — | 194.8 | 37,739.5 | 0.5% | $128.50 | View |
| Valley Power | VPGS4 |
VIC1 | Turbine - OCGT | $31.1k | $0 | — | 194.0 | 37,746.2 | 0.5% | $128.50 | View |
| Morgan To Whyalla Pipeline No 4 PS | MWPS4PV1 |
SA1 | Solar PV - Single axis tracking | $27.6k | $0 | — | 390.8 | 415.5 | 9.9% | $0.25 | View |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | MWPS1PV1 |
SA1 | Solar PV - Single axis tracking | $26.8k | $0 | — | 385.9 | 431.6 | 9.7% | $0.25 | View |
| Jeeralang A | JLA01 |
VIC1 | Turbine - OCGT | $25.3k | $0 | — | 113.6 | 33,579.0 | 0.3% | $135.55 | View |
| Jeeralang B | JLB01 |
VIC1 | Turbine - OCGT | $25.2k | $0 | — | 86.6 | 54,359.5 | 0.2% | $128.50 | View |
| Jeeralang A | JLA03 |
VIC1 | Turbine - OCGT | $24.1k | $0 | — | 109.2 | 37,759.5 | 0.3% | $141.46 | View |
| Rubicon Mountain Streams | RUBICON |
VIC1 | Hydro - Dam | $23.9k | $0 | — | 405.9 | — | 4.2% | $1.00 | View |
| Ballarat Energy Storage System | BALB1 |
VIC1 | Storage - Battery | $23.8k | $0 | — | -159.9 | 15,089.2 | -0.7% | $0.00 | View |
| Colongra | CG4 |
NSW1 | Turbine - OCGT | $23.3k | $0 | — | 284.5 | 120,070.7 | 0.2% | $194.33 | View |
| Jeeralang A | JLA04 |
VIC1 | Turbine - OCGT | $22.7k | $0 | — | 102.1 | 37,759.5 | 0.3% | $177.20 | View |
| Kennedy Energy Park - Phase 1 - Solar | KEPSF1 |
QLD1 | Solar PV - Single axis tracking | $22.7k | $0 | — | 840.5 | 822.4 | 7.8% | $0.34 | View |
| Colongra | CG3 |
NSW1 | Turbine - OCGT | $22.5k | $0 | — | 284.1 | 119,976.5 | 0.2% | $144.24 | View |
| Braemar 2 Power Station | BRAEMAR5 |
QLD1 | Turbine - OCGT | $21.6k | $0 | — | 295.7 | 105,670.2 | 0.2% | $3.14 | View |
| Bulgana Green Power Hub - BESS | BULBES1 |
VIC1 | Storage - Battery | $21.6k | $8.1k | 23,306.2 | -706.0 | 11,271.7 | -4.9% | $1.98 | View |
| Colongra | CG1 |
NSW1 | Turbine - OCGT | $21.0k | $0 | — | 282.9 | 120,507.2 | 0.2% | $197.00 | View |
| Stanwell | STAN-3 |
QLD1 | Turbine - Steam Sub Critical | $20.0k | $0 | — | 262.9 | — | 0.1% | $52.60 | View |
| Happy Valley Reservoir | HVWWBA1 |
SA1 | Storage - Battery | $18.3k | $794 | 5,369.5 | -53.3 | 2,408.6 | -1.3% | $1.58 | View |
| Wandoan South Solar Stage 2 | WANDSF2 |
QLD1 | Solar PV - Single axis tracking | $17.5k | $0 | — | 392.5 | 391.3 | 0.2% | $0.25 | View |
| Morgan To Whyalla Pipeline No 3 PS | MWPS3PV1 |
SA1 | Solar PV - Single axis tracking | $15.6k | $0 | — | 256.2 | 284.3 | 4.7% | $0.25 | View |
| Cohuna Solar Farm | COHUNSF1 |
VIC1 | Solar PV - Single axis tracking | $14.8k | $0 | — | 549.6 | 531.1 | 2.4% | $0.33 | View |
| Morgan To Whyalla Pipeline No 2 PS | MWPS2PV1 |
SA1 | Solar PV - Single axis tracking | $13.9k | $0 | — | 191.2 | 214.7 | 4.8% | $0.25 | View |
| Clover | CLOVER |
VIC1 | Hydro - Dam | $13.1k | $0 | — | 204.2 | — | 1.0% | $1.17 | View |
| Adelaide Desalination Plant | ADPBA1 |
SA1 | Storage - Battery | $10.6k | $1.1k | 7,329.6 | -52.9 | 2,920.5 | -0.9% | $0.00 | View |
| Christies Beach Wastewater Treatment Plant | CBWWBA1 |
SA1 | Storage - Battery | $9.5k | $251 | 23.9 | -24.6 | 1,251.3 | -1.6% | $1.50 | View |
| Bolivar Waste Water Treatment | BOWWBA1 |
SA1 | Storage - Battery | $9.3k | $100 | 13.0 | -30.4 | 1,290.4 | -1.4% | $1.58 | View |
| Laverton North | LNGS2 |
VIC1 | Turbine - OCGT | $8.4k | $0 | — | 53.2 | 102,337.0 | 0.0% | $128.50 | View |
| Mt Stuart | MSTUART1 |
QLD1 | Turbine - OCGT | $7.2k | $0 | — | 71.3 | 96,289.5 | 0.1% | $2.00 | View |
| Philip Island BESS | PIBESS1 |
VIC1 | Storage - Battery | $5.8k | $1.6k | 525.8 | -224.7 | 2,321.2 | -6.2% | $1.50 | View |
| Jeeralang B | JLB03 |
VIC1 | Turbine - OCGT | $5.6k | $0 | — | 22.5 | 54,541.5 | 0.0% | $137.85 | View |
| Dalrymple BESS | DALNTH1 |
SA1 | Storage - Battery | $3.1k | $0 | — | -138.4 | 8,664.4 | -0.6% | $2.03 | View |
| Jeeralang B | JLB02 |
VIC1 | Turbine - OCGT | $2.5k | $0 | — | 25.0 | 35,400.0 | 0.0% | $137.71 | View |
| Mintaro GT | MINTARO |
SA1 | Turbine - OCGT | $1.5k | $0 | — | 22.6 | 61,780.7 | 0.0% | $128.50 | View |
| Angaston | ANGAST1 |
SA1 | Reciprocating Engine - Compression ignition | $1.3k | $0 | — | 12.3 | 30,088.7 | 0.0% | $0.00 | View |
| Roma | ROMA_8 |
QLD1 | Turbine - OCGT | $1.2k | $0 | — | 28.2 | 24,397.9 | 0.1% | $128.50 | View |
| Roma | ROMA_7 |
QLD1 | Turbine - OCGT | $1.2k | $0 | — | 28.0 | 25,246.0 | 0.1% | $128.50 | View |
| Braemar 2 Power Station | BRAEMAR7 |
QLD1 | Turbine - OCGT | $314 | $0 | — | 4.5 | 109,818.7 | 0.0% | $132.25 | View |
| Mt Stuart | MSTUART2 |
QLD1 | Turbine - OCGT | $265 | $0 | — | 3.9 | 86,836.5 | 0.0% | $148.45 | View |
| Kennedy Energy Park - Phase 1 - Storage | KEPBG1 |
QLD1 | Storage - Battery | $208 | $0 | — | 2.0 | — | 0.1% | $2.03 | View |
| Tailem Bend Stage 2 Solar Project | TB2SF1 |
SA1 | Solar PV - Single axis tracking | $22 | $0 | — | 1.6 | — | 0.0% | $0.25 | View |
| DRFIIN02 | DRFIIN02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND02 | DRGBND02 |
$0 | $0 | 1,816.8 | — | — | — | — | View | ||
| DRGBND01 | DRGBND01 |
$0 | $0 | 3,875.9 | — | — | — | — | View | ||
| DRFIIN01 | DRFIIN01 |
$0 | $0 | — | — | — | — | — | View | ||
| VENUS1 | VENUS1 |
$0 | $0 | 1,122.1 | — | — | — | — | View | ||
| DRGBND03 | DRGBND03 |
$0 | $0 | 3,805.7 | — | — | — | — | View | ||
| DRBRLV01 | DRBRLV01 |
$0 | $0 | 11,428.7 | — | — | — | — | View | ||
| VSVEL2S1 | VSVEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSH1S1 | VSSSH1S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSE1V1 | VSSSE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSAE1V1 | VSSAE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSQHT1V1 | VSQHT1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSNEL2S1 | VSNEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAV1 | DRACAV1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRAESN3 | DRAESN3 |
$0 | $0 | — | — | — | — | — | View | ||
| DRAESS1 | DRAESS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND04 | DRGBND04 |
$0 | $0 | 16,391.7 | — | — | — | — | View | ||
| DRHTVP01 | DRHTVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT02 | DRVIOT02 |
$0 | $0 | 1,216.8 | — | — | — | — | View | ||
| DRVIOT03 | DRVIOT03 |
$0 | $0 | 1,580.8 | — | — | — | — | View | ||
| DRVIOT04 | DRVIOT04 |
$0 | $0 | 45,311.6 | — | — | — | — | View | ||
| DRVIOT05 | DRVIOT05 |
$0 | $0 | 1,588.0 | — | — | — | — | View | ||
| DRVIOT06 | DRVIOT06 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT07 | DRVIOT07 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA03 | DRXNDA03 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAD01 | DRXNAD01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAE01 | DRXNAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA01 | DRXNDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT01 | DRVIOT01 |
$0 | $0 | 3,713.8 | — | — | — | — | View | ||
| DRSHVS02 | DRSHVS02 |
$0 | $0 | 13,214.4 | — | — | — | — | View | ||
| DRHTVP03 | DRHTVP03 |
$0 | $0 | 0.6 | — | — | — | — | View | ||
| DROZVP01 | DROZVP01 |
$0 | $0 | 1.2 | — | — | — | — | View | ||
| RT_VIC1 | RT_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP02 | DROZVP02 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP03 | DROZVP03 |
$0 | $0 | 22.5 | — | — | — | — | View | ||
| DRPSTQ01 | DRPSTQ01 |
$0 | $0 | 4,270.8 | — | — | — | — | View | ||
| DRPSTV01 | DRPSTV01 |
$0 | $0 | 1,938.6 | — | — | — | — | View | ||
| DRSHVN01 | DRSHVN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVN02 | DRSHVN02 |
$0 | $0 | 25,416.2 | — | — | — | — | View | ||
| DRSHVS01 | DRSHVS01 |
$0 | $0 | 1,551.3 | — | — | — | — | View | ||
| DRXNDA02 | DRXNDA02 |
$0 | $0 | — | — | — | — | — | View | ||
| Wivenhoe | W/HOE#1 |
Storage - Pumped hydro | $0 | $0 | — | — | — | — | — | View | |
| PLBESS1 | PLBESS1 |
$0 | $0 | — | — | 13.7 | — | — | View | ||
| ASPAPM01 | ASPAPM01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPBSC01 | ASPBSC01 |
$0 | $0 | 984.1 | — | — | — | — | View | ||
| ASPSTV01 | ASPSTV01 |
$0 | $0 | 648.1 | — | — | — | — | View | ||
| ASQEEV1 | ASQEEV1 |
$0 | $0 | 3,104.0 | — | — | — | — | View | ||
| ASQENC1 | ASQENC1 |
$0 | $0 | 321.6 | — | — | — | — | View | ||
| ASRMGE01 | ASRMGE01 |
$0 | $0 | 3,021.1 | — | — | — | — | View | ||
| ASRMGE02 | ASRMGE02 |
$0 | $0 | 2,851.8 | — | — | — | — | View | ||
| ASRMGE03 | ASRMGE03 |
$0 | $0 | 2,932.1 | — | — | — | — | View | ||
| ASRMGE04 | ASRMGE04 |
$0 | $0 | 6,386.0 | — | — | — | — | View | ||
| ASNENC1 | ASNENC1 |
$0 | $0 | 4,202.7 | — | — | — | — | View | ||
| Townsville Power Station | YABULU2 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| APD01 | APD01 |
$0 | $0 | 68,594.3 | — | — | — | — | View | ||
| ASACLE01 | ASACLE01 |
$0 | $0 | 8,729.9 | — | — | — | — | View | ||
| ASDEVI01 | ASDEVI01 |
$0 | $0 | 4,601.0 | — | — | — | — | View | ||
| ASDLBY01 | ASDLBY01 |
$0 | $0 | 0.5 | — | — | — | — | View | ||
| ASENGV01 | ASENGV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGY01 | ASENGY01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASGENE01 | ASGENE01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNAES1 | ASNAES1 |
$0 | $0 | 175.5 | — | — | — | — | View | ||
| ASNBRL1 | ASNBRL1 |
$0 | $0 | 14,220.4 | — | — | — | — | View | ||
| WOOLES1 | WOOLES1 |
$0 | $0 | — | -232.1 | 744.2 | — | — | View | ||
| ASRMGE05 | ASRMGE05 |
$0 | $0 | 11,276.3 | — | — | — | — | View | ||
| ASSDE1 | ASSDE1 |
$0 | $0 | — | — | — | — | — | View | ||
| BUSF1 | BUSF1 |
$0 | $0 | — | 10,399.8 | 10,134.4 | — | — | View | ||
| CRWARP1 | CRWARP1 |
$0 | $0 | — | 17,567.1 | 17,173.6 | — | — | View | ||
| DG_NSW1 | DG_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_QLD1 | DG_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_SA1 | DG_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| WAMBOWF2 | WAMBOWF2 |
$0 | $0 | — | 1,304.9 | 1,287.0 | — | — | View | ||
| DG_TAS1 | DG_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_VIC1 | DG_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAN1 | DRACAN1 |
$0 | $0 | 581.7 | — | — | — | — | View | ||
| BUNGAMB1 | BUNGAMB1 |
$0 | $0 | 286,167.6 | -2,721.9 | 102,565.0 | — | — | View | ||
| Braemar | BRAEMAR2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 129,961.5 | 0.0% | $130.94 | View |
| WNSF1 | WNSF1 |
$0 | $0 | — | 1,908.3 | — | — | — | View | ||
| ASSENC1 | ASSENC1 |
$0 | $0 | 677.7 | — | — | — | — | View | ||
| ASSERDV1 | ASSERDV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASTHYD1 | ASTHYD1 |
$0 | $0 | 1,836.4 | — | — | — | — | View | ||
| Barcaldine Power Station | BARCALDN |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $141.78 | View |
| Bell Bay Three | BBTHREE2 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $137.22 | View |
| Bairnsdale | BDL02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $158.38 | View |
| Blowering | BLOWERNG |
NSW1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Braemar | BRAEMAR1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 127,979.6 | 0.0% | $133.75 | View |
| Wivenhoe | W/HOE#2 |
Storage - Pumped hydro | $0 | $0 | 745.3 | 33,423.4 | 122,002.2 | — | — | View | |
| RT_VIC6 | RT_VIC6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA4 | RT_SA4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA3 | RT_SA3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA2 | RT_SA2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA1 | RT_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_QLD1 | RT_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW6 | RT_NSW6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW5 | RT_NSW5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW4 | RT_NSW4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW3 | RT_NSW3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA5 | RT_SA5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA6 | RT_SA6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC5 | RT_VIC5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC4 | RT_VIC4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC3 | RT_VIC3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC2 | RT_VIC2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC12 | RT_VIC12 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC11 | RT_VIC11 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC10 | RT_VIC10 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG1 | KIDSPHG1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_TAS1 | RT_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW2 | RT_NSW2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW1 | RT_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG2 | KIDSPHG2 |
$0 | $0 | — | — | — | — | — | View | ||
| PUMP2 | PUMP2 |
$0 | $0 | — | 49,061.1 | 49,545.5 | — | — | View | ||
| PUMP1 | PUMP1 |
$0 | $0 | — | — | — | — | — | View | ||
| Mt Stuart | MSTUART3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 80,475.1 | 0.0% | $2.00 | View |
| Port Lincoln GT | POR03 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Port Lincoln GT | POR01 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| KIDSPHL2 | KIDSPHL2 |
$0 | $0 | — | — | — | — | — | View | ||
| NESBESS1 | NESBESS1 |
$0 | $0 | — | -424.7 | 6,162.1 | — | — | View | ||
| PIONEER | PIONEER |
$0 | $0 | — | 16,563.6 | — | — | — | View | ||
| NESBESS2 | NESBESS2 |
$0 | $0 | — | -269.1 | 3,607.5 | — | — | View | ||
| MREHA3 | MREHA3 |
$0 | $0 | 44,714.0 | -5,374.4 | 137,416.8 | — | — | View | ||
| MREHA2 | MREHA2 |
$0 | $0 | 58,409.2 | -3,503.6 | 126,270.3 | — | — | View | ||
| KIDSPHL1 | KIDSPHL1 |
$0 | $0 | — | — | — | — | — | View | ||
| Oakey Power Station | OAKEY2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 34,463.0 | 0.0% | $128.50 | View |
| Laverton North | LNGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 104,878.0 | 0.0% | $128.50 | View |
| Lonsdale | LONSDALE |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 13,723.2 | 0.0% | $308.00 | View |
| MLB01 | MLB01 |
$0 | $0 | — | -550.5 | 1,283.3 | — | — | View | ||
| QPSFB2 | QPSFB2 |
$0 | $0 | — | 20.3 | 4,532.6 | — | — | View | ||
| QPSFB1 | QPSFB1 |
$0 | $0 | — | 7,612.4 | 8,245.6 | — | — | View | ||
| MLSP1 | MLSP1 |
$0 | $0 | — | 1,229.6 | — | — | — | View | ||
| MREHA1 | MREHA1 |
$0 | $0 | 56,619.3 | -3,209.9 | 125,439.7 | — | — | View | ||
| Oakey Power Station | OAKEY1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 34,299.5 | 0.0% | $128.50 | View |
| DRXNDA04 | DRXNDA04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQQE01 | DRXQQE01 |
$0 | $0 | — | — | 343.2 | — | — | View | ||
| DRXSQS01 | DRXSQS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDJ01 | DRXVDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDP01 | DRXVDP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDX01 | DRXVDX01 |
$0 | $0 | — | 1.1 | 1.1 | — | — | View | ||
| STABESS1 | STABESS1 |
$0 | $0 | — | 3.8 | 3.0 | — | — | View | ||
| DRXVQP01 | DRXVQP01 |
$0 | $0 | — | — | — | — | — | View | ||
| Snuggery | SNUG1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| SNOWYP | SNOWYP |
$0 | $0 | — | 10,786.4 | 10,905.5 | — | — | View | ||
| DRXQDA01 | DRXQDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNVS01 | DRXNVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDB04 | DRXNDB04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDE01 | DRXNDE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDJ01 | DRXNDJ01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDW01 | DRXNDW01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNFS01 | DRXNFS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNQX01 | DRXNQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNSS01 | DRXNSS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNFF01 | DRXNFF01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNTM02 | DRXNTM02 |
$0 | $0 | — | — | — | — | — | View | ||
| SNOWYGJP | SNOWYGJP |
$0 | $0 | 12,146.7 | — | — | — | — | View | ||
| DRXVQX01 | DRXVQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| Gladstone | GSTONE5 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $58.48 | View |
| SHPUMP | SHPUMP |
$0 | $0 | — | 6,158.1 | 6,138.0 | — | — | View | ||
| Hunter EconomicZone | HEZ1 |
NSW1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | 13,797.5 | 0.0% | $308.00 | View |
| Hume Dam VIC | HUMEV |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.54 | View |
| Jeeralang A | JLA02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 30,240.0 | 0.0% | $128.50 | View |
| KEPBL1 | KEPBL1 |
$0 | $0 | — | — | — | — | — | View | ||
| KERNGSP1 | KERNGSP1 |
$0 | $0 | — | 2,231.1 | 2,799.2 | — | — | View | ||
| RT_VIC9 | RT_VIC9 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC8 | RT_VIC8 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC7 | RT_VIC7 |
$0 | $0 | — | — | — | — | — | View | ||
| GPWFWST2 | GPWFWST2 |
$0 | $0 | — | 26,574.6 | 36,335.2 | — | — | View | ||
| Eraring GT | ERGT01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $96.96 | View |
| Dry Creek GT | DRYCGT3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 34,014.7 | 0.0% | $210.15 | View |
| DRXVAE01 | DRXVAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX02 | DRXVQX02 |
$0 | $0 | — | — | 0.8 | — | — | View | ||
| Broken Hill GT | GB01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.11 | View |
| GPWFWST1 | GPWFWST1 |
$0 | $0 | — | 41,704.5 | 62,604.5 | — | — | View | ||
| Dry Creek GT | DRYCGT2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 24,473.7 | 0.0% | $135.55 | View |
| Hume Dam NSW | HUMENSW |
NSW1 | Hydro - Dam | $-40 | $0 | — | -0.5 | — | 0.0% | $1.05 | View |
| SMFBESS2 | SMFBESS2 |
SA1 | $-268 | $0 | — | -5.1 | — | 0.0% | $1.50 | View | |
| LINCOLN GAP BESSBDU | LGAPBS1 |
SA1 | Storage - Battery | $-297 | $0 | — | -2.0 | — | 0.0% | $1.50 | View |
| Templers B BESS | TEMPB1 |
SA1 | Storage - Battery | $-491 | $0 | — | -9.4 | — | 0.0% | $1.50 | View |
| Williamsdale BESS | WILLBES1 |
NSW1 | Storage - Battery | $-1.2k | $0 | — | -13.9 | 1,336.3 | 0.0% | $1.50 | View |
| SMFBESS1 | SMFBESS1 |
SA1 | $-1.3k | $0 | — | 5.1 | 114.1 | 0.0% | $1.50 | View | |
| Queanbeyan BESS | QBYNB1 |
NSW1 | Storage - Battery | $-7.5k | $4.7k | 9,808.0 | -347.3 | 3,907.7 | -4.8% | $1.50 | View |
| Mornington BESS | MRNBESS1 |
VIC1 | Storage - Battery | $-9.7k | $0 | — | -607.0 | 734.5 | -0.4% | $1.50 | View |
| Liddell BESS | LDBESS1 |
NSW1 | Storage - Battery | $-665.7k | $0 | — | -4,154.5 | 96,856.2 | -1.2% | $1.50 | View |