MLF-adjusted revenue, dispatch, capacity factor, and estimated SRMC from AEMO 5‑minute dispatch data. Data through 22 Sep 2026, 05:45 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Eraring | ER02 |
NSW1 | Turbine - Steam Sub Critical | $28.62M | $5.7k | 8,914.6 | 388,806.1 | 496,282.5 | 75.0% | $59.45 | View |
| Eraring | ER03 |
NSW1 | Turbine - Steam Sub Critical | $27.53M | $6.1k | 7,608.7 | 393,672.0 | 474,863.7 | 75.9% | $49.77 | View |
| Eraring | ER04 |
NSW1 | Turbine - Steam Sub Critical | $27.17M | $6.8k | 8,950.3 | 363,952.3 | 469,362.5 | 70.2% | $55.48 | View |
| Bayswater | BW04 |
NSW1 | Turbine - Steam Sub Critical | $26.60M | $5.5k | 4,239.7 | 373,951.1 | 457,945.0 | 75.8% | $55.48 | View |
| Mt Piper | MP1 |
NSW1 | Turbine - Steam Sub Critical | $24.61M | $0 | — | 316,287.5 | 523,453.3 | 60.2% | $49.24 | View |
| Bayswater | BW01 |
NSW1 | Turbine - Steam Sub Critical | $23.22M | $4.9k | 3,973.0 | 339,854.9 | 416,539.7 | 71.5% | $53.57 | View |
| Vales Point B | VP5 |
NSW1 | Turbine - Steam Sub Critical | $21.27M | $67 | 211.8 | 281,630.4 | 463,101.7 | 59.3% | $52.60 | View |
| Vales Point B | VP6 |
NSW1 | Turbine - Steam Sub Critical | $19.53M | $104 | 353.5 | 264,977.0 | 391,071.2 | 55.8% | $52.60 | View |
| Loy Yang B | LOYYB1 |
VIC1 | Turbine - Steam Sub Critical | $18.37M | $11.4k | 16,966.2 | 352,842.8 | 414,812.8 | 84.5% | $47.20 | View |
| Loy Yang B | LOYYB2 |
VIC1 | Turbine - Steam Sub Critical | $17.24M | $10.0k | 16,318.1 | 328,920.4 | 386,394.6 | 78.8% | $47.20 | View |
| Loy Yang A Power Station | LYA3 |
VIC1 | Turbine - Steam Sub Critical | $17.03M | $2.6k | 5,281.4 | 306,637.0 | 363,800.0 | 76.1% | $47.20 | View |
| Loy Yang A Power Station | LYA4 |
VIC1 | Turbine - Steam Sub Critical | $16.86M | $2.7k | 5,910.1 | 311,027.2 | 377,750.4 | 77.1% | $47.20 | View |
| Millmerran Power Plant | MPP_2 |
QLD1 | Turbine - Steam Super Critical | $16.24M | $0 | — | 267,222.7 | 306,164.7 | 87.1% | $52.60 | View |
| Bayswater | BW02 |
NSW1 | Turbine - Steam Sub Critical | $14.44M | $4.9k | 3,641.8 | 222,136.8 | 262,165.0 | 45.0% | $26.23 | View |
| Callide C | CPP_3 |
QLD1 | Turbine - Steam Super Critical | $14.13M | $0 | — | 236,475.7 | 297,401.5 | 77.5% | $44.41 | View |
| Tarong North | TNPS1 |
QLD1 | Turbine - Steam Super Critical | $13.88M | $0 | — | 245,471.0 | 265,291.7 | 75.8% | $52.60 | View |
| Loy Yang A Power Station | LYA2 |
VIC1 | Turbine - Steam Sub Critical | $13.26M | $2.6k | 1,398.7 | 251,924.0 | 289,605.8 | 66.0% | $47.20 | View |
| Callide C | CPP_4 |
QLD1 | Turbine - Steam Super Critical | $12.07M | $0 | — | 207,548.6 | 250,326.8 | 68.6% | $101.94 | View |
| Murray 2 | MURRAY |
VIC1 | Hydro - Dam | $11.24M | $5.9k | 5,218.4 | 118,043.5 | 805,957.8 | 27.3% | $1.00 | View |
| Yallourn W | YWPS1 |
VIC1 | Turbine - Steam Sub Critical | $10.16M | $0 | — | 235,120.8 | 247,248.7 | 93.3% | $47.20 | View |
| Tarong | TARONG#1 |
QLD1 | Turbine - Steam Sub Critical | $10.12M | $0 | 2.0 | 161,178.1 | 193,021.7 | 64.0% | $52.60 | View |
| Stanwell | STAN-1 |
QLD1 | Turbine - Steam Sub Critical | $10.05M | $3.9k | 3,934.5 | 170,931.8 | 240,832.9 | 65.0% | $52.60 | View |
| Millmerran Power Plant | MPP_1 |
QLD1 | Turbine - Steam Super Critical | $10.01M | $0 | — | 163,851.1 | 187,579.2 | 53.4% | $52.60 | View |
| Stanwell | STAN-2 |
QLD1 | Turbine - Steam Sub Critical | $9.96M | $3.6k | 716.8 | 166,980.5 | 239,200.8 | 63.5% | $52.60 | View |
| Callide B | CALL_B_2 |
QLD1 | Turbine - Steam Sub Critical | $9.96M | $345 | 307.5 | 182,210.4 | 242,545.8 | 72.3% | $55.48 | View |
| Callide B | CALL_B_1 |
QLD1 | Turbine - Steam Sub Critical | $9.92M | $179 | 136.4 | 180,406.6 | 249,912.9 | 71.6% | $32.60 | View |
| Tarong | TARONG#2 |
QLD1 | Turbine - Steam Sub Critical | $9.90M | $3.8k | 745.9 | 164,599.4 | 210,044.6 | 65.3% | $55.48 | View |
| Stanwell | STAN-3 |
QLD1 | Turbine - Steam Sub Critical | $9.79M | $93 | 3.1 | 168,388.3 | 238,589.7 | 64.1% | $52.60 | View |
| Loy Yang A Power Station | LYA1 |
VIC1 | Turbine - Steam Sub Critical | $9.74M | $1.4k | 3,194.9 | 165,166.1 | 196,326.7 | 41.0% | $47.20 | View |
| Yallourn W | YWPS2 |
VIC1 | Turbine - Steam Sub Critical | $9.72M | $0 | — | 224,843.7 | 229,435.0 | 89.2% | $47.20 | View |
| Tarong | TARONG#4 |
QLD1 | Turbine - Steam Sub Critical | $9.25M | $3.9k | 792.4 | 150,112.5 | 177,302.2 | 59.6% | $52.58 | View |
| Yallourn W | YWPS3 |
VIC1 | Turbine - Steam Sub Critical | $8.75M | $0 | — | 161,335.6 | 182,532.7 | 59.8% | $47.20 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $8.49M | $0 | — | 134,537.3 | 134,025.1 | 20.2% | $0.58 | View |
| Gladstone | GSTONE3 |
QLD1 | Turbine - Steam Sub Critical | $8.18M | $175 | 129.5 | 133,724.8 | 185,384.0 | 66.3% | $128.75 | View |
| Tumut 3 | TUMUT3 |
NSW1 | Hydro - Dam | $8.13M | $6.2k | 9,980.7 | 85,273.8 | 1,099,022.2 | 7.9% | $1.05 | View |
| Bayswater | BW03 |
NSW1 | Turbine - Steam Sub Critical | $7.99M | $480 | 406.1 | 117,466.7 | 119,255.0 | 23.8% | $28.68 | View |
| Gladstone | GSTONE5 |
QLD1 | Turbine - Steam Sub Critical | $7.45M | $56 | 22.6 | 118,802.4 | 166,196.7 | 58.9% | $58.48 | View |
| Gladstone | GSTONE1 |
QLD1 | Turbine - Steam Sub Critical | $7.42M | $221 | 138.0 | 124,116.2 | 172,819.2 | 61.6% | $52.99 | View |
| Stanwell | STAN-4 |
QLD1 | Turbine - Steam Sub Critical | $7.34M | $0 | — | 137,621.9 | 148,112.5 | 52.4% | $52.60 | View |
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $5.73M | $0 | — | 85,773.8 | 92,913.1 | 26.3% | $0.68 | View |
| Upper Tumut | UPPTUMUT |
NSW1 | Hydro - Dam | $5.59M | $5.7k | 7,096.5 | 59,429.7 | 423,138.4 | 13.4% | $1.00 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $5.57M | $0 | — | 83,084.6 | 88,182.6 | 33.3% | $0.00 | View |
| Mt Piper | MP2 |
NSW1 | Turbine - Steam Sub Critical | $5.39M | $0 | — | 56,755.1 | 95,895.0 | 11.9% | $52.60 | View |
| Pelican Point | PPCCGT |
SA1 | Turbine - CCGT | $5.11M | $0 | — | 65,381.5 | 95,227.0 | 17.2% | $84.30 | View |
| Gladstone | GSTONE6 |
QLD1 | Turbine - Steam Sub Critical | $5.08M | $0 | 6.9 | 78,367.6 | 113,097.1 | 38.9% | $54.96 | View |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $4.67M | $0 | — | 80,342.4 | 80,045.6 | 28.2% | $0.50 | View |
| Catagunya / Liapootah / Wayatinah | LI_WY_CA |
TAS1 | Hydro - Dam | $4.31M | $13.9k | 2,554.1 | 74,387.9 | 129,067.7 | 58.5% | $1.05 | View |
| Mortlake | MORTLK11 |
VIC1 | Turbine - OCGT | $4.29M | $0 | — | 41,018.1 | 183,932.2 | 19.5% | $128.50 | View |
| Yallourn W | YWPS4 |
VIC1 | Turbine - Steam Sub Critical | $4.07M | $0 | — | 98,449.2 | 112,945.4 | 36.5% | $47.20 | View |
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $3.69M | $0 | — | 57,347.9 | 57,250.8 | 31.6% | $0.50 | View |
| Eraring Big Battery | ERB01 |
NSW1 | Storage - Battery | $3.58M | $0 | — | -7,214.0 | 268,876.4 | -4.2% | $1.58 | View |
| Orana BESS | ORABESS1 |
NSW1 | Storage - Battery | $3.58M | $5.0k | 5,235.9 | -5,965.0 | 261,697.5 | -2.0% | $1.50 | View |
| Gladstone | GSTONE2 |
QLD1 | Turbine - Steam Sub Critical | $3.46M | $0 | — | 61,266.6 | 90,949.3 | 30.4% | $49.17 | View |
| Tamar Valley Combined Cycle | TVCC201 |
TAS1 | Turbine - CCGT | $3.31M | $94.9k | 706.2 | 60,762.3 | 77,815.7 | 40.6% | $84.30 | View |
| Barker Inlet Power Station | BARKIPS1 |
SA1 | Reciprocating Engine - Spark ignition | $3.21M | $52 | 19.0 | 31,946.8 | 124,501.2 | 21.1% | $9.00 | View |
| Reece | REECE1 |
TAS1 | Hydro - Dam | $3.19M | $67.4k | 11,624.0 | 47,764.4 | 82,419.2 | 57.4% | $1.00 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $3.19M | $0 | — | 140,250.5 | 141,614.7 | 36.9% | $0.50 | View |
| Gladstone | GSTONE4 |
QLD1 | Turbine - Steam Sub Critical | $2.91M | $0 | — | 46,780.2 | 67,096.2 | 23.2% | $52.60 | View |
| Reece | REECE2 |
TAS1 | Hydro - Dam | $2.89M | $61.4k | 10,053.0 | 44,588.5 | 74,504.7 | 53.6% | $1.00 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $2.88M | $0 | — | 43,634.8 | 43,470.6 | 35.0% | $0.53 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $2.67M | $0 | — | 55,059.5 | 54,799.0 | 28.3% | $0.50 | View |
| Yarwun 1 | YARWUN_1 |
QLD1 | Turbine - CCGT | $2.61M | $0 | — | 51,691.7 | 72,299.2 | 39.9% | $84.30 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $2.52M | $0 | — | 56,846.5 | 57,953.4 | 54.8% | $0.66 | View |
| Supernode BESS | SNB02 |
QLD1 | Storage - Battery | $2.40M | $0 | — | -4,317.7 | 153,851.2 | -2.3% | $1.50 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $2.38M | $0 | — | 65,918.2 | 65,963.2 | 54.5% | $0.50 | View |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $2.37M | $0 | — | 39,026.8 | 53,282.9 | 30.0% | $0.50 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $2.34M | $0 | — | 32,505.6 | 37,234.9 | 22.7% | $0.50 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $2.34M | $0 | — | 56,863.2 | 60,623.3 | 37.8% | $0.55 | View |
| Cethana | CETHANA |
TAS1 | Hydro - Dam | $2.23M | $32.8k | 5,476.1 | 30,351.3 | 68,784.5 | 49.6% | $1.09 | View |
| Mackintosh | MACKNTSH |
TAS1 | Hydro - Dam | $2.21M | $42.8k | 8,485.8 | 35,758.0 | 60,177.4 | 62.2% | $1.00 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $2.20M | $0 | — | 46,798.2 | 58,501.7 | 31.9% | $0.00 | View |
| Bastyan | BASTYAN |
TAS1 | Hydro - Dam | $2.20M | $92.0k | 2,765.9 | 36,229.4 | 53,926.7 | 63.0% | $0.00 | View |
| Osborne | OSB-AG |
SA1 | Turbine - CCGT | $2.15M | $0 | — | 20,995.6 | 21,975.7 | 16.2% | $84.30 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $2.15M | $0 | — | 38,251.2 | 45,101.0 | 33.9% | $0.00 | View |
| Gordon | GORDON |
TAS1 | Hydro - Dam | $2.08M | $507.1k | 29,184.9 | 32,260.0 | 206,448.0 | 10.4% | $1.05 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $2.07M | $0 | — | 39,347.9 | 39,208.5 | 24.1% | $0.65 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $1.98M | $0 | — | 36,406.0 | 36,373.8 | 30.6% | $0.53 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $1.97M | $0 | — | 32,668.6 | 34,886.7 | 25.9% | $0.50 | View |
| Tarraleah | TARRALEA |
TAS1 | Hydro - Dam | $1.97M | $0 | — | 44,552.9 | 44,474.2 | 68.8% | $1.00 | View |
| Mortlake | MORTLK12 |
VIC1 | Turbine - OCGT | $1.91M | $0 | — | 17,039.1 | 182,756.3 | 8.1% | $128.50 | View |
| Guthega | GUTHEGA |
NSW1 | Hydro - Dam | $1.91M | $0 | — | 24,613.8 | 47,787.0 | 57.0% | $1.05 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $1.90M | $0 | — | 29,811.6 | 30,268.8 | 40.0% | $0.58 | View |
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $1.85M | $0 | — | 36,066.4 | 49,700.6 | 24.9% | $0.50 | View |
| John Butters | JBUTTERS |
TAS1 | Hydro - Dam | $1.82M | $31.2k | 9,123.9 | 22,492.2 | 103,464.0 | 21.7% | $0.00 | View |
| Tallawarra | TALWA1 |
NSW1 | Turbine - CCGT | $1.74M | $0 | — | 17,199.7 | 22,513.3 | 6.0% | $84.30 | View |
| Tribute | TRIBUTE |
TAS1 | Hydro - Dam | $1.73M | $8.2k | 3,384.5 | 26,060.5 | 35,325.3 | 43.7% | $1.00 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $1.72M | $0 | — | 32,251.0 | 32,251.0 | 39.6% | $0.00 | View |
| Devils Gate | DEVILS_G |
TAS1 | Hydro - Dam | $1.60M | $24.9k | 7,041.3 | 22,807.4 | 43,741.8 | 52.8% | $1.00 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $1.58M | $0 | — | 26,929.0 | 27,553.5 | 23.5% | $0.00 | View |
| SHOAL1 | SHOAL1 |
NSW1 | $1.57M | $0 | — | 23,819.1 | — | 13.4% | $1.20 | View | |
| Tungatinah | TUNGATIN |
TAS1 | Hydro - Dam | $1.56M | $10.2k | 3,235.3 | 21,183.5 | 34,897.1 | 23.5% | $1.00 | View |
| Bogong / Mackay | MCKAY1 |
VIC1 | Hydro - Dam | $1.56M | $0 | — | 14,792.4 | 209,590.8 | 6.8% | $1.00 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $1.54M | $0 | — | 27,055.4 | 26,960.6 | 26.5% | $0.53 | View |
| Waratah Super Battery | WTAHB1 |
NSW1 | Storage - Battery | $1.52M | $0 | — | -9,304.5 | 252,799.6 | -1.5% | $1.50 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $1.50M | $0 | — | 33,305.4 | 54,349.0 | 20.5% | $0.50 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $1.50M | $0 | — | 26,990.5 | 26,962.6 | 35.1% | $0.50 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $1.49M | $0 | — | 32,078.8 | 38,059.7 | 33.7% | $0.80 | View |
| Wellington North Solar Farm (Lightsource) | WELNSF1 |
NSW1 | Solar PV - Single axis tracking | $1.48M | $0 | — | 74,012.6 | 74,307.4 | 23.5% | $0.25 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $1.45M | $0 | — | 26,062.1 | 25,991.1 | 32.7% | $0.50 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $1.41M | $0 | — | 29,824.9 | 34,190.1 | 32.9% | $0.50 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $1.40M | $0 | — | 21,424.1 | 21,433.2 | 26.3% | $0.68 | View |
| Fisher | FISHER |
TAS1 | Hydro - Dam | $1.36M | $229.9k | 12,541.6 | 30,571.9 | 32,154.0 | 98.3% | $1.05 | View |
| Culcairn Solar Farm | CUSF1 |
NSW1 | Solar PV - Single axis tracking | $1.36M | $0 | — | 45,343.2 | 78,072.1 | 18.0% | $0.25 | View |
| Trevallyn | TREVALLN |
TAS1 | Hydro - Dam | $1.32M | $224 | 35.2 | 18,662.5 | 68,696.6 | 27.9% | $1.00 | View |
| Darling Downs | DDPS1 |
QLD1 | Turbine - CCGT | $1.32M | $0 | — | 13,629.5 | 14,016.8 | 2.9% | $3.31 | View |
| Tarong BESS - Stanwell | TARBESS1 |
QLD1 | Storage - Battery | $1.30M | $5.8k | 202,230.9 | -2,569.4 | 201,477.0 | -1.2% | $1.50 | View |
| Swanbank E GT | SWAN_E |
QLD1 | Turbine - CCGT | $1.30M | $0 | — | 12,153.2 | 13,818.9 | 4.4% | $2.00 | View |
| Torrens Island B | TORRB3 |
SA1 | Turbine - Steam Sub Critical | $1.27M | $2.9k | 2,321.1 | 11,090.1 | 22,501.6 | 7.7% | $2.00 | View |
| Somerton | AGLSOM |
VIC1 | Turbine - OCGT | $1.25M | $0 | — | 11,692.0 | 92,869.2 | 9.6% | $128.50 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $1.25M | $0 | — | 34,143.1 | — | 34.4% | $0.53 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $1.25M | $0 | — | 39,931.1 | 42,019.4 | 27.1% | $0.00 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $1.24M | $0 | — | 36,524.1 | 49,211.0 | 24.3% | $0.50 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $1.23M | $0 | — | 47,360.6 | 56,300.7 | 30.1% | $0.50 | View |
| Western Downs Green Power Hub P/L | WDGPH1 |
QLD1 | Solar PV - Single axis tracking | $1.23M | $7 | 1.0 | 94,077.3 | 94,470.7 | 32.7% | $0.32 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $1.22M | $0 | — | 30,033.5 | 54,982.1 | 16.8% | $0.00 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $1.22M | $0 | — | 23,112.0 | 23,118.2 | 33.4% | $0.69 | View |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $1.20M | $0 | — | 62,978.6 | 73,828.7 | 20.8% | $0.50 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $1.20M | $0 | — | 54,886.6 | 60,759.2 | 24.4% | $0.50 | View |
| Torrens Island B | TORRB4 |
SA1 | Turbine - Steam Sub Critical | $1.18M | $4.7k | 4,436.6 | 21,961.1 | 37,625.8 | 15.3% | $2.00 | View |
| Swanbank BESS | SWANBBF1 |
QLD1 | Storage - Battery | $1.18M | $0 | — | -1,777.1 | 93,709.5 | -1.0% | $1.50 | View |
| West Kiewa | WKIEWA1 |
VIC1 | Hydro - Dam | $1.16M | $0 | — | 19,545.9 | 40,701.0 | 79.8% | $10.00 | View |
| Liddell BESS | LDBESS1 |
NSW1 | Storage - Battery | $1.16M | $6.5k | 3,959.0 | -3,497.2 | 137,277.0 | -1.0% | $1.50 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $1.16M | $0 | — | 33,496.7 | 33,596.3 | 41.5% | $0.68 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $1.15M | $0 | — | 32,771.0 | 33,494.2 | 38.0% | $0.50 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $1.13M | $0 | — | 35,787.8 | 35,789.3 | 44.5% | $0.66 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $1.12M | $0 | — | 31,381.5 | 31,512.8 | 42.6% | $0.50 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $1.11M | $0 | — | 24,226.2 | 29,804.4 | 35.6% | $0.71 | View |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $1.11M | $0 | — | 17,461.2 | 17,440.7 | 16.7% | $0.58 | View |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $1.11M | $0 | — | 26,091.0 | 32,113.7 | 36.7% | $0.50 | View |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $1.11M | $0 | — | 35,009.5 | — | 25.3% | $0.50 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $1.10M | $0 | — | 34,425.6 | 34,616.5 | 37.9% | $0.74 | View |
| Supernode BESS | SNB01 |
QLD1 | Storage - Battery | $1.08M | $0 | — | -2,606.3 | 123,730.2 | -1.4% | $1.50 | View |
| Western Downs Battery - Stage 1 And 2 | WDBESS1 |
QLD1 | Storage - Battery | $1.07M | $32.5k | 15,659.9 | -3,417.2 | 147,952.9 | -1.9% | $1.58 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $1.07M | $6 | 412.3 | 30,122.2 | 30,340.2 | 40.9% | $0.69 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $1.06M | $0 | — | 20,384.1 | — | 20.1% | $0.00 | View |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $1.06M | $0 | — | 34,244.2 | 35,162.7 | 36.4% | $0.50 | View |
| GPWFWST2 | GPWFWST2 |
VIC1 | $1.04M | $0 | — | 31,801.1 | 52,847.2 | 7.9% | $0.53 | View | |
| Wollar Solar Farm | WOLARSF1 |
NSW1 | Solar PV - Single axis tracking | $1.03M | $0 | — | 56,572.6 | 56,582.3 | 28.1% | $0.25 | View |
| Stubbo Solar Farm | STUBSF1 |
NSW1 | Solar PV - Single axis tracking | $1.03M | $0 | — | 48,296.0 | 48,884.9 | 33.9% | $0.25 | View |
| Western Downs Gas Peaking Plant - KCI | WDBESS2 |
QLD1 | Turbine - CCGT | $1.03M | $60.8k | 39,976.2 | -4,747.5 | 169,026.1 | -1.6% | $2.00 | View |
| Brendale BESS | BRNDBES1 |
QLD1 | Storage - Battery | $1.00M | $19.6k | 7,598.7 | -4,197.2 | 134,286.4 | -2.8% | $1.58 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $999.6k | $0 | — | 22,497.2 | 26,146.3 | 36.2% | $0.50 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $994.4k | $0 | — | 40,616.0 | 41,559.6 | 23.5% | $0.00 | View |
| Stubbo Solar Farm | STUBSF2 |
NSW1 | Solar PV - Single axis tracking | $979.9k | $0 | — | 47,368.7 | 47,944.4 | 32.6% | $0.25 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $954.3k | $0 | — | 14,453.4 | 16,554.9 | 23.7% | $0.00 | View |
| New England Solar Farm | NEWENSF1 |
NSW1 | Solar PV - Single axis tracking | $933.5k | $0 | — | 42,520.8 | 42,538.3 | 29.5% | $0.25 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $931.9k | $0 | — | 26,156.0 | 53,636.0 | 14.0% | $0.50 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $903.3k | $0 | — | 48,986.0 | 53,011.5 | 27.4% | $0.50 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $898.9k | $0 | — | 27,014.6 | 43,261.6 | 22.3% | $0.66 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $896.8k | $0 | — | 33,395.9 | 33,395.8 | 43.5% | $0.00 | View |
| Quarantine | QPS5 |
SA1 | Turbine - OCGT | $892.6k | $0 | — | 9,204.7 | 57,285.8 | 10.0% | $209.05 | View |
| Meadowbank | MEADOWBK |
TAS1 | Hydro - Dam | $882.4k | $14.7k | 283.7 | 14,383.3 | 31,024.4 | 49.9% | $1.00 | View |
| Torrens Island B | TORRB2 |
SA1 | Turbine - Steam Sub Critical | $875.1k | $1.5k | 1,151.1 | 7,045.2 | 12,046.1 | 4.9% | $5.47 | View |
| GPWFWST1 | GPWFWST1 |
VIC1 | $860.2k | $0 | — | 37,591.4 | 54,313.5 | 9.4% | $0.53 | View | |
| Limondale BESS | LIMBESS1 |
NSW1 | Storage - Battery | $854.2k | $3.3k | 2,577.2 | -1,637.5 | 35,461.7 | -4.5% | $1.50 | View |
| Greenbank BESS | GREENB1 |
QLD1 | Storage - Battery | $853.3k | $2.8k | 45,894.0 | -1,921.4 | 107,035.4 | -1.3% | $1.54 | View |
| Lemonthyme / Wilmot | LEM_WIL |
TAS1 | Hydro - Dam | $852.7k | $14.1k | 3,342.5 | 13,102.1 | 19,354.7 | 22.3% | $1.00 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $849.3k | $0 | — | 17,889.2 | 21,731.5 | 34.8% | $0.00 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $830.1k | $0 | — | 14,374.1 | 17,011.3 | 46.2% | $0.68 | View |
| New England Solar Farm | NEWENSF2 |
NSW1 | Solar PV - Single axis tracking | $826.2k | $0 | — | 37,898.7 | 37,907.2 | 26.3% | $0.25 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $795.1k | $0 | — | 25,784.9 | 25,853.6 | 24.9% | $0.50 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $792.2k | $0 | — | 38,838.3 | 39,871.4 | 34.2% | $0.50 | View |
| Darlington Point Solar Farm | DARLSF1 |
NSW1 | Solar PV - Single axis tracking | $785.8k | $0 | — | 36,655.0 | 39,945.4 | 18.5% | $0.33 | View |
| Blyth BESS | BLYTHB1 |
SA1 | Storage - Battery | $783.8k | $49.5k | 39,575.7 | -4,008.7 | 137,093.6 | -2.8% | $4.86 | View |
| Avonlie Solar Farm | AVLSF1 |
NSW1 | Solar PV - Single axis tracking | $782.2k | $0 | — | 31,509.2 | 35,869.0 | 17.2% | $0.00 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $781.8k | $0 | — | 14,310.9 | 17,526.9 | 34.5% | $0.53 | View |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $776.6k | $0 | — | 20,245.1 | 31,404.0 | 17.7% | $0.86 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $760.8k | $0 | — | 14,187.0 | 14,201.3 | 34.2% | $0.76 | View |
| Ladbroke Grove | LADBROK2 |
SA1 | Turbine - OCGT | $756.7k | $0 | — | 7,470.1 | 29,903.9 | 25.9% | $145.06 | View |
| Broadwater | BWTR1 |
NSW1 | Turbine - Steam Sub Critical | $739.3k | $0 | — | 11,288.4 | — | 41.3% | $124.22 | View |
| Koorangie Energy Storage System | KESSB1 |
VIC1 | Storage - Battery | $738.2k | $0 | — | -1,822.7 | 91,938.0 | -1.4% | $1.50 | View |
| Ulinda Park BESS | ULPBESS1 |
QLD1 | Storage - Battery | $726.2k | $19.5k | 7,121.9 | -4,081.6 | 106,223.0 | -3.7% | $1.50 | View |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $724.4k | $0 | — | 25,065.3 | — | 22.9% | $0.50 | View |
| Limondale Solar Farm 1 | LIMOSF11 |
NSW1 | Solar PV - Single axis tracking | $719.8k | $0 | — | 32,898.3 | 35,648.9 | 19.9% | $0.25 | View |
| BRDDSF01 | BRDDSF01 |
QLD1 | $709.5k | $0 | — | 38,697.3 | 55,660.2 | 14.6% | $0.27 | View | |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $697.6k | $0 | — | 42,477.2 | 43,462.3 | 32.7% | $0.50 | View |
| Ladbroke Grove | LADBROK1 |
SA1 | Turbine - OCGT | $677.9k | $0 | — | 6,463.7 | 29,937.1 | 22.4% | $153.02 | View |
| Goorambat East Solar Farm (ENGIE) | GOESF1 |
VIC1 | Solar PV - Single axis tracking | $667.8k | $0 | — | 49,038.2 | 55,138.5 | 27.2% | $0.25 | View |
| Barron Gorge | BARRON-2 |
QLD1 | Hydro - Run of River | $652.5k | $0 | — | 8,910.8 | 12,128.7 | 35.4% | $0.00 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $651.6k | $0 | — | 20,460.2 | 26,492.0 | 29.4% | $0.00 | View |
| Moranbah North | MBAHNTH |
QLD1 | Reciprocating Engine - Spark ignition | $646.7k | $0 | — | 11,473.0 | — | 25.0% | $57.00 | View |
| BRDDBES1 | BRDDBES1 |
QLD1 | $646.5k | $1.7k | 4,801.9 | -1,645.9 | 101,829.0 | -0.6% | $0.27 | View | |
| Rangebank BESS | RANGEB1 |
VIC1 | Storage - Battery | $611.4k | $68 | 14.0 | -1,877.4 | 80,033.7 | -1.3% | $1.50 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $608.9k | $0 | — | 25,115.2 | 25,900.8 | 25.2% | $0.50 | View |
| Metz Solar Farm | METZSF1 |
NSW1 | Solar PV - Single axis tracking | $608.1k | $0 | — | 24,406.3 | 27,659.4 | 25.1% | $0.25 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $607.4k | $0 | — | 26,178.7 | 32,064.3 | 29.9% | $0.53 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $606.9k | $0 | — | 10,620.8 | 10,590.5 | 31.7% | $0.50 | View |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $598.6k | $0 | — | 18,567.4 | 30,848.3 | 17.9% | $0.50 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $595.5k | $0 | — | 18,366.5 | 21,683.3 | 31.9% | $0.68 | View |
| Victorian Big Battery | VBB1 |
VIC1 | Storage - Battery | $594.0k | $21.6k | 10,058.0 | -3,243.7 | 104,850.0 | -1.5% | $1.50 | View |
| Wellington Solar Farm | WELLSF1 |
NSW1 | Solar PV - Single axis tracking | $591.1k | $0 | — | 24,251.7 | 34,631.0 | 15.6% | $0.25 | View |
| Sunraysia Solar Farm | SUNRSF1 |
NSW1 | Solar PV - Single axis tracking | $589.8k | $0 | — | 27,837.8 | 28,687.1 | 16.9% | $0.25 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $587.6k | $0 | — | 11,317.8 | 11,285.7 | 32.5% | $0.50 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $585.8k | $0 | — | 14,808.7 | 17,972.1 | 28.5% | $0.50 | View |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $579.1k | $0 | — | 12,288.3 | 14,542.5 | 27.5% | $0.53 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $576.5k | $0 | — | 14,609.5 | 14,830.9 | 35.8% | $0.80 | View |
| Repulse | REPULSE |
TAS1 | Hydro - Dam | $566.7k | $0 | — | 9,346.9 | — | 46.4% | $1.00 | View |
| SHGEN | SHGEN |
NSW1 | $542.5k | $0 | — | 5,490.0 | 28,813.3 | 3.1% | $1.20 | View | |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $531.3k | $0 | — | 24,175.9 | 26,482.2 | 30.7% | $0.65 | View |
| Coleambally Solar Farm | COLEASF1 |
NSW1 | Solar PV - Single axis tracking | $506.1k | $0 | — | 23,832.0 | 24,104.7 | 22.0% | $0.00 | View |
| Suntop Solar Farm | SUNTPSF1 |
NSW1 | Solar PV - Single axis tracking | $480.7k | $0 | — | 17,700.6 | 30,305.7 | 16.4% | $0.25 | View |
| Kiamal Solar Farm - Stage 1 | KIAMSF1 |
VIC1 | Solar PV - Single axis tracking | $478.6k | $0 | — | 35,107.5 | 40,249.9 | 24.4% | $0.00 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $465.0k | $0 | — | 13,794.5 | 16,845.1 | 21.1% | $0.50 | View |
| Columboola Solar Farm | COLUMSF1 |
QLD1 | Solar PV - Single axis tracking | $443.4k | $0 | — | 40,033.0 | 40,033.0 | 25.6% | $0.32 | View |
| Paloona | PALOONA |
TAS1 | Hydro - Dam | $441.7k | $0 | — | 7,832.0 | — | 38.8% | $1.00 | View |
| Gunnedah Solar Farm | GNNDHSF1 |
NSW1 | Solar PV - Single axis tracking | $438.6k | $0 | — | 15,378.8 | 24,108.5 | 19.4% | $0.33 | View |
| Terang BESS | TRGBESS1 |
VIC1 | Storage - Battery | $434.6k | $31.3k | 16,392.4 | -3,391.9 | 63,306.6 | -4.7% | $1.50 | View |
| Condong | CONDONG1 |
NSW1 | Turbine - Steam Sub Critical | $429.3k | $0 | — | 7,672.8 | — | 35.5% | $112.12 | View |
| Mannum BESS | MANNUMB1 |
SA1 | Storage - Battery | $424.7k | $1.5k | 237.3 | -1,171.0 | 66,082.4 | -1.6% | $1.50 | View |
| Edenvale Solar Park | EDENVSF1 |
QLD1 | Solar PV - Single axis tracking | $416.3k | $0 | — | 36,231.8 | 36,850.2 | 28.0% | $0.00 | View |
| LaTrobe Valley BESS | LVES1 |
VIC1 | Storage - Battery | $411.5k | $8.7k | 170,695.1 | -1,511.6 | 61,419.1 | -2.1% | $1.54 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $401.3k | $0 | — | 9,001.3 | 11,139.2 | 23.8% | $0.77 | View |
| Wandoan South Solar Stage 1 | WANDSF1 |
QLD1 | Solar PV - Single axis tracking | $398.2k | $0 | — | 20,680.5 | 30,088.6 | 18.0% | $0.25 | View |
| Torrens Island BESS | TIB1 |
SA1 | Storage - Battery | $397.1k | $32.8k | 108,851.1 | -2,522.9 | 104,261.9 | -1.4% | $1.50 | View |
| Newport | NPS |
VIC1 | Turbine - Steam Sub Critical | $394.7k | $0 | — | 4,347.0 | 4,639.2 | 1.2% | $2.00 | View |
| Aldoga Solar Farm | ALDGASF1 |
QLD1 | Solar PV - Single axis tracking | $392.8k | $0 | — | 57,570.8 | 65,746.1 | 20.7% | $0.00 | View |
| Capital Battery | CAPBES1 |
NSW1 | Storage - Battery | $389.3k | $0 | — | -840.5 | 60,194.2 | -1.2% | $1.50 | View |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $388.0k | $0 | — | 17,397.6 | 22,138.9 | 18.4% | $0.50 | View |
| German Creek | GERMCRK |
QLD1 | Reciprocating Engine - Spark ignition | $375.1k | $0 | — | 7,477.9 | — | 23.1% | $122.81 | View |
| Bungala Two Solar Farm | BNGSF2 |
SA1 | Solar PV - Single axis tracking | $371.9k | $0 | — | 14,592.8 | 20,375.6 | 15.0% | $0.33 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $367.1k | $0 | — | 9,340.1 | 14,751.5 | 16.1% | $0.79 | View |
| Woolooga Solar Farm | WOOLGSF1 |
QLD1 | Solar PV - Single axis tracking | $366.3k | $0 | — | 15,194.9 | 34,018.9 | 9.5% | $0.25 | View |
| Bungala One Solar Farm | BNGSF1 |
SA1 | Solar PV - Single axis tracking | $347.0k | $0 | — | 12,498.6 | 18,100.0 | 12.9% | $0.34 | View |
| Chinchilla BESS | CHBESS1 |
QLD1 | Storage - Battery | $345.8k | $2.2k | 21,101.5 | -979.2 | 43,906.6 | -1.4% | $1.75 | View |
| Hillston Sun Farm | HILLSTN1 |
NSW1 | Solar PV - Single axis tracking | $344.7k | $0 | — | 14,415.1 | 16,040.0 | 18.2% | $0.00 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $340.6k | $0 | — | 8,088.8 | 13,488.1 | 20.8% | $0.50 | View |
| Clements Gap - BESS | CGBESS01 |
SA1 | Storage - Battery | $340.0k | $0 | — | -1,117.7 | 35,466.3 | -2.6% | $1.58 | View |
| Cluny | CLUNY |
TAS1 | Hydro - Dam | $337.5k | $0 | — | 5,727.3 | — | 41.9% | $1.00 | View |
| Gangarri Solar Farm | GANGARR1 |
QLD1 | Solar PV - Single axis tracking | $333.0k | $0 | — | 20,467.5 | 23,603.5 | 17.5% | $0.26 | View |
| Quorn Park Solar Hybrid | QPSFB1 |
NSW1 | Solar PV - Single axis tracking | $329.4k | $0 | — | 11,408.4 | 17,114.0 | 16.4% | $0.26 | View |
| Glenellen Solar Farm | GESF1 |
NSW1 | Solar PV - Fixed | $326.1k | $0 | — | 10,850.0 | 26,278.5 | 5.8% | $0.00 | View |
| Nyngan Solar Plant | NYNGAN1 |
NSW1 | Solar PV - Fixed | $325.3k | $0 | — | 9,367.2 | 19,641.7 | 12.8% | $0.20 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $323.8k | $0 | — | 8,681.9 | 15,348.5 | 14.4% | $0.53 | View |
| Daydream Solar Farm | DAYDSF1 |
QLD1 | Solar PV - Single axis tracking | $314.1k | $0 | — | 22,404.1 | 26,283.2 | 18.5% | $0.00 | View |
| Nevertire Solar Farm | NEVERSF1 |
NSW1 | Solar PV - Single axis tracking | $312.2k | $0 | — | 14,655.5 | 19,956.5 | 19.5% | $0.25 | View |
| KIATAWF1 | KIATAWF1 |
VIC1 | $310.5k | $0 | — | 8,697.3 | 9,660.2 | 38.9% | $0.68 | View | |
| Glenrowan West Solar Farm | GLRWNSF1 |
VIC1 | Solar PV - Single axis tracking | $302.9k | $0 | — | 15,971.1 | 21,970.5 | 16.8% | $0.32 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $297.9k | $0 | — | 5,192.1 | — | 24.0% | $0.68 | View |
| Bluegrass Solar Farm | BLUEGSF1 |
QLD1 | Solar PV - Single axis tracking | $293.6k | $0 | — | 25,946.9 | 26,200.0 | 24.3% | $0.29 | View |
| NESBESS1 | NESBESS1 |
NSW1 | $292.1k | $0 | — | -985.4 | 12,572.1 | -0.7% | $1.50 | View | |
| Walla Walla Solar Farm | WLWLSF1 |
NSW1 | Solar PV - Single axis tracking | $291.9k | $0 | — | 13,195.3 | 27,819.5 | 12.1% | $0.25 | View |
| Sebastopol Solar Farm | SEBSF1 |
NSW1 | Solar PV - Single axis tracking | $291.7k | $0 | — | 12,142.5 | 16,696.8 | 18.7% | $0.25 | View |
| Port Augusta Renewable Energy Park - Solar | PAREPS1 |
SA1 | Solar PV - Fixed | $286.9k | $0 | — | 7,346.1 | 14,931.7 | 10.3% | $0.20 | View |
| West Wyalong Solar Farm | WSTWYSF1 |
NSW1 | Solar PV - Single axis tracking | $286.3k | $0 | — | 12,703.6 | 14,742.8 | 16.8% | $0.25 | View |
| Tully Sugar Mill | TULLYSM1 |
QLD1 | Turbine - Steam Super Critical | $283.8k | $0 | — | 5,279.7 | — | 22.9% | $117.00 | View |
| Walla Walla Solar Farm | WLWLSF2 |
NSW1 | Solar PV - Single axis tracking | $281.4k | $0 | — | 12,948.2 | 26,021.2 | 11.8% | $0.25 | View |
| Yarranlea Solar Farm | YARANSF1 |
QLD1 | Solar PV - Single axis tracking | $277.4k | $0 | — | 10,990.6 | 19,514.5 | 12.6% | $0.25 | View |
| Gunsynd Solar Farm | GUSF1 |
QLD1 | Solar PV - Fixed | $276.9k | $0 | — | 16,886.5 | 20,428.8 | 25.0% | $0.00 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $275.9k | $0 | — | 12,097.7 | 14,044.3 | 25.0% | $0.50 | View |
| Haughton Solar Farm Stage 1 | HAUGHT11 |
QLD1 | Solar PV - Single axis tracking | $275.0k | $0 | — | 20,857.6 | 22,632.9 | 21.8% | $0.00 | View |
| Tailem Bend Stage 2 Solar Project | TB2SF1 |
SA1 | Solar PV - Single axis tracking | $266.4k | $0 | — | 8,345.1 | 14,822.8 | 11.0% | $0.25 | View |
| Tailem Bend - Solar | TBSF1 |
SA1 | Solar PV - Fixed | $264.4k | $0 | — | 8,980.7 | 16,184.1 | 11.5% | $0.20 | View |
| Goonumbla Solar Farm | GOONSF1 |
NSW1 | Solar PV - Single axis tracking | $261.3k | $0 | — | 12,026.4 | 14,548.5 | 23.9% | $0.25 | View |
| Wandoan South BESS | WANDB1 |
QLD1 | Storage - Battery | $260.9k | $33.0k | 153,688.4 | -894.9 | 52,478.8 | -1.2% | $1.50 | View |
| Clare Solar Farm | CLARESF1 |
QLD1 | Solar PV - Single axis tracking | $254.1k | $0 | — | 12,415.2 | 22,463.5 | 15.6% | $0.00 | View |
| Glenrowan Solar Farm | GLENSF1 |
VIC1 | Solar PV - Single axis tracking | $253.3k | $0 | — | 21,657.3 | 22,240.3 | 23.9% | $0.25 | View |
| Moree Solar Farm | MOREESF1 |
NSW1 | Solar PV - Single axis tracking | $248.6k | $0 | — | 11,597.5 | 11,697.9 | 28.8% | $0.25 | View |
| Blowering | BLOWERNG |
NSW1 | Hydro - Dam | $247.3k | $0 | — | 3,875.5 | 3,831.1 | 6.7% | $0.00 | View |
| Bomen Solar Farm | BOMENSF1 |
NSW1 | Solar PV - Single axis tracking | $245.8k | $0 | — | 12,162.6 | 13,771.8 | 14.0% | $0.25 | View |
| Numurkah Solar Farm | NUMURSF1 |
VIC1 | Solar PV - Single axis tracking | $244.5k | $0 | — | 11,842.4 | 16,381.7 | 16.3% | $0.25 | View |
| Dartmouth | DARTM1 |
VIC1 | Hydro - Dam | $241.1k | $0 | — | 1,945.0 | 112,077.5 | 1.5% | $0.00 | View |
| Hazelwood Battery Energy Storage System (HBESS) | HBESS1 |
VIC1 | Storage - Battery | $240.2k | $15.0k | 7,854.9 | -3,009.2 | 83,635.0 | -2.1% | $1.87 | View |
| Clermont Solar Farm | CLERMSF1 |
QLD1 | Solar PV - Single axis tracking | $239.3k | $0 | — | 13,748.1 | 16,990.4 | 20.6% | $0.34 | View |
| Barron Gorge | BARRON-1 |
QLD1 | Hydro - Run of River | $239.2k | $0 | — | 2,619.1 | 4,043.4 | 10.4% | $0.00 | View |
| Wandoan South Solar Stage 2 | WANDSF2 |
QLD1 | Solar PV - Single axis tracking | $233.9k | $0 | — | 8,243.4 | 14,583.5 | 3.6% | $0.25 | View |
| Quarantine | QPS1 |
SA1 | Turbine - OCGT | $231.0k | $0 | — | 2,139.3 | 19,082.7 | 10.2% | $128.50 | View |
| Moura Solar Farm | MOUSF1 |
QLD1 | Solar PV - Single axis tracking | $229.2k | $0 | — | 20,595.4 | 20,751.7 | 28.9% | $0.25 | View |
| Smithfield BESS | SMTHBES1 |
NSW1 | Storage - Battery | $228.1k | $10.3k | 102,066.3 | -880.7 | 31,834.9 | -1.4% | $1.50 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $226.7k | $0 | — | 7,004.2 | 9,684.0 | 21.1% | $0.50 | View |
| Townsville Power Station | YABULU |
QLD1 | Turbine - CCGT | $225.6k | $0 | — | 3,213.7 | 3,213.7 | 2.8% | $84.30 | View |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $220.3k | $0 | — | 9,163.1 | 11,532.4 | 27.5% | $0.66 | View |
| Lilyvale Solar Farm | LILYSF1 |
QLD1 | Solar PV - Single axis tracking | $213.5k | $0 | — | 9,324.7 | 15,872.1 | 10.9% | $0.25 | View |
| Munna Creek Solar Farm | MUCRKSF1 |
QLD1 | Solar PV - Single axis tracking | $213.0k | $0 | — | 14,289.0 | 23,331.5 | 12.9% | $0.25 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $205.7k | $0 | — | 4,870.7 | 7,648.2 | 17.3% | $0.53 | View |
| Sun Metals Corporation Solar Farm | SMCSF1 |
QLD1 | Solar PV - Fixed | $201.8k | $0 | — | 16,001.7 | 21,115.6 | 15.5% | $0.00 | View |
| Hornsdale Power Reserve Unit 1 | HPR1 |
SA1 | Storage - Battery | $200.1k | $8.0k | 5,442.5 | -1,119.0 | 34,782.9 | -1.0% | $1.50 | View |
| Ross River Solar Farm | RRSF1 |
QLD1 | Solar PV - Single axis tracking | $198.3k | $0 | — | 18,759.3 | 23,751.6 | 20.4% | $0.25 | View |
| Parkes Solar Farm | PARSF1 |
NSW1 | Solar PV - Single axis tracking | $196.9k | $0 | — | 9,528.4 | 11,088.5 | 26.7% | $0.25 | View |
| Girgarre Solar Farm | GIRGSF |
VIC1 | Solar PV - Single axis tracking | $195.6k | $0 | — | 9,276.5 | 12,421.1 | 13.8% | $0.00 | View |
| Jemalong Solar | JEMALNG1 |
NSW1 | Solar PV - Single axis tracking | $194.5k | $0 | — | 8,225.0 | 9,458.7 | 20.8% | $0.32 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $194.2k | $0 | — | 6,417.1 | — | 17.0% | $0.53 | View |
| Butlers Gorge | BUTLERSG |
TAS1 | Hydro - Dam | $193.9k | $0 | — | 4,595.6 | — | 52.3% | $1.00 | View |
| Darling Downs Solar Farm | DDSF1 |
QLD1 | Solar PV - Fixed | $189.1k | $0 | — | 21,154.9 | 21,207.0 | 24.3% | $0.28 | View |
| Beryl Solar Farm | BERYLSF1 |
NSW1 | Solar PV - Single axis tracking | $184.4k | $0 | — | 7,275.3 | 7,355.3 | 10.3% | $0.25 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $183.4k | $0 | — | 5,559.1 | 5,531.8 | 23.4% | $0.50 | View |
| Quarantine | QPS3 |
SA1 | Turbine - OCGT | $183.1k | $0 | — | 1,630.9 | 18,721.9 | 7.8% | $128.50 | View |
| Rocky Point Sugar Mill Cogeneration Plant | RPCG |
QLD1 | Other - Other | $177.0k | $0 | — | 3,375.5 | — | 15.6% | $117.00 | View |
| Karadoc Solar Farm | KARSF1 |
VIC1 | Solar PV - Single axis tracking | $175.8k | $0 | — | 13,478.9 | 17,291.7 | 17.9% | $0.00 | View |
| Broken Hill Solar Plant | BROKENH1 |
NSW1 | Solar PV - Fixed | $173.0k | $0 | — | 4,509.8 | 7,019.8 | 11.8% | $0.28 | View |
| Wunghnu Solar Farm | WUNUSF1 |
VIC1 | Solar PV - Single axis tracking | $171.6k | $0 | — | 7,537.0 | 9,351.7 | 11.2% | $0.25 | View |
| Rugby Run Solar Farm | RUGBYR1 |
QLD1 | Solar PV - Single axis tracking | $166.2k | $0 | — | 10,527.5 | 15,596.3 | 22.5% | $0.25 | View |
| Uranquinty | URANQ13 |
NSW1 | Turbine - OCGT | $164.2k | $0 | — | 1,264.0 | 90,730.7 | 1.0% | $128.50 | View |
| Finley Solar Farm | FINLYSF1 |
NSW1 | Solar PV - Single axis tracking | $161.1k | $0 | — | 7,058.3 | 7,252.2 | 6.0% | $0.25 | View |
| Wyalong Solar Farm | WYASF1 |
NSW1 | Solar PV - Single axis tracking | $160.1k | $0 | — | 8,468.0 | 10,250.9 | 18.9% | $0.25 | View |
| Hume Dam NSW | HUMENSW |
NSW1 | Hydro - Dam | $158.2k | $0 | — | 2,512.3 | 3,648.2 | 12.0% | $1.05 | View |
| Uranquinty | URANQ14 |
NSW1 | Turbine - OCGT | $158.0k | $0 | — | 1,238.4 | 90,557.3 | 1.0% | $128.50 | View |
| Oakey 2 Solar Farm | OAKEY2SF |
QLD1 | Solar PV - Single axis tracking | $156.9k | $0 | — | 7,001.0 | 11,833.8 | 17.5% | $0.25 | View |
| Wemen Solar Farm | WEMENSF1 |
VIC1 | Solar PV - Single axis tracking | $155.0k | $0 | — | 13,342.5 | 17,474.1 | 19.0% | $0.25 | View |
| Emerald Solar Park | EMERASF1 |
QLD1 | Solar PV - Single axis tracking | $155.0k | $0 | — | 15,230.6 | 15,256.1 | 29.4% | $0.25 | View |
| Riverina Energy Storage System 2 | RIVNB2 |
NSW1 | Storage - Battery | $149.0k | $0 | — | -300.3 | 11,418.9 | -0.6% | $1.50 | View |
| Corowa Solar Farm | CRWASF1 |
NSW1 | Solar PV - Single axis tracking | $142.2k | $0 | — | 5,796.5 | 6,421.9 | 22.4% | $0.33 | View |
| Eildon | EILDON2 |
VIC1 | Hydro - Dam | $140.5k | $0 | — | 1,444.7 | 32,108.4 | 3.0% | $1.00 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $139.2k | $0 | — | 4,821.6 | — | 22.3% | $0.50 | View |
| Yatpool Solar Farm | YATSF1 |
VIC1 | Solar PV - Single axis tracking | $138.9k | $0 | — | 8,782.6 | 9,880.8 | 13.0% | $0.25 | View |
| Limondale Solar Farm 2 | LIMOSF21 |
NSW1 | Solar PV - Single axis tracking | $138.5k | $0 | — | 5,971.2 | 6,543.0 | 28.6% | $0.25 | View |
| Winton Solar Farm | WINTSF1 |
VIC1 | Solar PV - Single axis tracking | $138.0k | $0 | — | 13,609.6 | 14,354.9 | 22.2% | $0.25 | View |
| Bouldercombe Battery project | BBATTERY1 |
QLD1 | Storage - Battery | $134.5k | $8.3k | 14,704.0 | -617.4 | 23,340.9 | -1.7% | $1.64 | View |
| Kidston Solar Project Phase One 50MW | KSP1 |
QLD1 | Solar PV - Fixed | $128.8k | $0 | — | 6,953.8 | 12,882.0 | 19.3% | $0.20 | View |
| Mokoan Solar Farm (LightsourceBP) | MOKOSF1 |
VIC1 | Solar PV - Single axis tracking | $127.3k | $0 | — | 7,175.6 | 9,339.7 | 21.7% | $0.25 | View |
| Wagga North Solar Farm | WAGGNSF1 |
NSW1 | Solar PV - Single axis tracking | $123.4k | $0 | — | 6,550.3 | 7,716.1 | 16.3% | $0.25 | View |
| Riverina Energy Storage System 1 | RESS1 |
NSW1 | Storage - Battery | $117.6k | $0 | — | -360.4 | 17,493.7 | -0.8% | $1.50 | View |
| Susan River Solar Farm | SRSF1 |
QLD1 | Solar PV - Single axis tracking | $117.5k | $0 | — | 9,723.2 | 12,873.0 | 15.8% | $0.25 | View |
| Lancaster Solar Farm | LANCSF1 |
VIC1 | Solar PV - Single axis tracking | $114.2k | $0 | — | 5,851.6 | 6,022.3 | 7.7% | $0.25 | View |
| Wallgrove Grid Battery project | WALGRV1 |
NSW1 | Storage - Battery | $111.7k | $2.0k | 63,830.3 | -367.3 | 17,363.2 | -1.0% | $1.50 | View |
| Whitsunday Solar Farm | WHITSF1 |
QLD1 | Solar PV - Single axis tracking | $108.4k | $0 | — | 6,104.4 | 9,571.2 | 14.7% | $0.25 | View |
| Bannerton Solar Park | BANN1 |
VIC1 | Solar PV - Single axis tracking | $106.7k | $0 | — | 10,935.4 | 14,547.2 | 15.2% | $0.34 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $106.1k | $0 | — | 3,743.6 | — | 18.1% | $0.50 | View |
| Bundaberg Solar Farm | BUSF1 |
QLD1 | Solar PV - Single axis tracking | $105.6k | $0 | — | 11,468.3 | 12,500.5 | 20.4% | $14.55 | View |
| Tallawarra B | TALWB1 |
NSW1 | Turbine - OCGT | $100.9k | $0 | — | 823.1 | 226,327.5 | 0.4% | $128.50 | View |
| Hayman Solar Farm | HAYMSF1 |
QLD1 | Solar PV - Single axis tracking | $98.8k | $0 | — | 6,769.7 | 9,658.5 | 16.3% | $0.34 | View |
| Rubicon Mountain Streams | RUBICON |
VIC1 | Hydro - Dam | $98.2k | $0 | — | 2,210.2 | — | 22.7% | $1.00 | View |
| Kingaroy Solar Farm | KINGASF1 |
QLD1 | Solar PV - Single axis tracking | $97.4k | $0 | — | 7,562.9 | 8,998.8 | 26.3% | $0.25 | View |
| Templers B BESS | TEMPB1 |
SA1 | Storage - Battery | $96.2k | $0 | — | -80.9 | 927.2 | -0.1% | $1.50 | View |
| Hamilton Solar Farm | HAMISF1 |
QLD1 | Solar PV - Single axis tracking | $94.5k | $0 | — | 5,942.7 | 8,290.0 | 14.4% | $18.64 | View |
| Braemar 2 Power Station | BRAEMAR6 |
QLD1 | Turbine - OCGT | $94.4k | $0 | — | 663.3 | 111,425.2 | 0.5% | $133.36 | View |
| Griffith Solar Farm | GRIFSF1 |
NSW1 | Solar PV - Single axis tracking | $92.2k | $0 | — | 4,121.9 | — | 21.1% | $0.35 | View |
| Kerang Hybrid | KERNGSP1 |
VIC1 | Solar PV - Single axis tracking | $89.5k | $0 | — | 3,481.6 | 6,202.7 | 3.0% | $0.26 | View |
| Eildon | EILDON1 |
VIC1 | Hydro - Dam | $89.3k | $0 | — | 792.6 | 29,668.0 | 1.6% | $1.05 | View |
| Junee Solar Farm | JUNEESF1 |
NSW1 | Solar PV - Single axis tracking | $89.3k | $0 | — | 4,440.3 | 5,362.1 | 17.1% | $0.00 | View |
| Tamar Valley Peaking | TVPP104 |
TAS1 | Turbine - OCGT | $88.1k | $0 | — | 874.6 | 21,866.2 | 2.1% | $128.50 | View |
| Lake Bonney Battery Energy Storage | LBB1 |
SA1 | Storage - Battery | $86.2k | $2.6k | 40,934.5 | -186.2 | 11,821.2 | -1.0% | $1.98 | View |
| Warwick Solar Farm | WARWSF1 |
QLD1 | Solar PV - Single axis tracking | $84.7k | $0 | — | 2,945.2 | 5,344.1 | 12.7% | $0.25 | View |
| Mulwala Solar Farm | MULWASF1 |
NSW1 | Solar PV - Single axis tracking | $84.2k | $0 | — | 3,127.4 | 4,185.9 | 14.0% | $0.25 | View |
| Molong Solar Farm | MOLNGSF1 |
NSW1 | Solar PV - Single axis tracking | $82.2k | $0 | — | 4,414.1 | 6,660.4 | 17.0% | $0.25 | View |
| Quarantine | QPS2 |
SA1 | Turbine - OCGT | $79.9k | $0 | — | 607.2 | 16,375.0 | 3.5% | $128.50 | View |
| Gannawarra Solar Farm | GANNSF1 |
VIC1 | Solar PV - Single axis tracking | $78.5k | $0 | — | 8,462.3 | 8,889.4 | 21.4% | $0.34 | View |
| White Rock Solar Farm | WRSF1 |
NSW1 | Solar PV - Fixed | $78.2k | $0 | — | 4,036.0 | 4,036.0 | 28.0% | $0.20 | View |
| Quorn Park Solar Hybrid | QPSFB2 |
NSW1 | Storage - Battery | $76.8k | $0 | — | 117.3 | 6,093.5 | 0.6% | $1.58 | View |
| Rowallan | ROWALLAN |
TAS1 | Hydro - Dam | $75.8k | $0 | — | 1,210.4 | — | 16.0% | $1.00 | View |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $72.2k | $0 | — | 3,743.2 | — | 26.7% | $0.50 | View |
| Oakey Solar Farm | OAKEY1SF |
QLD1 | Solar PV - Fixed | $72.0k | $0 | — | 4,001.9 | 5,469.4 | 22.2% | $0.20 | View |
| Broken Hill | BHB1 |
NSW1 | Storage - Battery | $70.3k | $0 | — | -353.8 | 13,076.9 | -1.0% | $1.50 | View |
| Mannum Solar Farm 2 | MANNSF2 |
SA1 | Solar PV - Single axis tracking | $68.6k | $0 | — | 3,118.4 | 3,656.9 | 14.4% | $0.25 | View |
| Manildra Solar Farm | MANSLR1 |
NSW1 | Solar PV - Single axis tracking | $68.3k | $0 | — | 2,115.6 | 4,513.1 | 5.9% | $0.25 | View |
| Middlemount Solar Farm | MIDDLSF1 |
QLD1 | Solar PV - Single axis tracking | $68.1k | $0 | — | 4,195.8 | 5,886.2 | 22.4% | $0.25 | View |
| Tailem Bend Battery Project | TB2B1 |
SA1 | Storage - Battery | $67.7k | $12.7k | 25,803.8 | -970.0 | 24,786.4 | -3.2% | $1.50 | View |
| Maryrorough Solar Farm | MARYRSF1 |
QLD1 | Solar PV - Single axis tracking | $67.2k | $0 | — | 3,482.6 | 5,107.5 | 14.0% | $0.25 | View |
| Hunter Power Station | HUNTER1 |
NSW1 | Turbine - OCGT | $66.8k | $0 | — | 655.4 | 738.0 | 0.2% | $142.99 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $66.7k | $0 | — | 2,095.1 | — | 36.4% | $0.00 | View |
| Braemar | BRAEMAR1 |
QLD1 | Turbine - OCGT | $65.1k | $0 | — | 551.1 | 112,654.7 | 0.4% | $133.75 | View |
| Williamsdale BESS | WILLBES1 |
NSW1 | Storage - Battery | $65.0k | $0 | — | -308.0 | 5,590.2 | -0.2% | $1.50 | View |
| Warwick Solar Farm | WARWSF2 |
QLD1 | Solar PV - Single axis tracking | $62.5k | $0 | — | 2,209.5 | 4,407.7 | 9.6% | $0.25 | View |
| Childers Solar Farm | CHILDSF1 |
QLD1 | Solar PV - Single axis tracking | $61.6k | $0 | — | 6,246.6 | 8,163.1 | 13.5% | $0.34 | View |
| Darlington Point Energy Storage System | DPNTB1 |
NSW1 | Storage - Battery | $54.7k | $0 | — | -120.6 | 4,209.4 | -0.7% | $0.00 | View |
| Adelaide Desalination Plant | ADPPV1 |
SA1 | Solar PV - Fixed | $54.3k | $0 | — | 1,793.3 | 3,210.7 | 22.6% | $0.00 | View |
| Collinsville PV | CSPVPS1 |
QLD1 | Solar PV - Fixed | $53.0k | $0 | — | 5,862.0 | 7,348.0 | 19.2% | $0.28 | View |
| Lake Echo | LK_ECHO |
TAS1 | Hydro - Dam | $52.0k | $0 | — | 431.6 | 461.8 | 1.9% | $1.17 | View |
| Gannawarra Energy Storage System | GANNB1 |
VIC1 | Storage - Battery | $50.7k | $0 | — | -82.9 | 2,801.8 | -0.5% | $1.98 | View |
| Cohuna Solar Farm | COHUNSF1 |
VIC1 | Solar PV - Single axis tracking | $50.6k | $0 | — | 2,691.8 | 3,351.9 | 12.0% | $0.33 | View |
| Barcaldine Remote Community Solar Farm | BARCSF1 |
QLD1 | Solar PV - Single axis tracking | $48.4k | $0 | — | 1,995.7 | — | 13.9% | $0.00 | View |
| Gullen Range Solar Farm | GULLRSF1 |
NSW1 | Solar PV - Fixed | $40.8k | $0 | — | 1,680.1 | 1,921.6 | 23.3% | $0.27 | View |
| Longreach Solar Farm | LRSF1 |
QLD1 | Solar PV - Fixed | $40.0k | $0 | — | 1,950.6 | — | 18.1% | $0.20 | View |
| Bolivar Power Station | BOLIVPS1 |
SA1 | Turbine - OCGT | $39.1k | $0 | — | 209.1 | 398.0 | 0.2% | $151.37 | View |
| Colongra | CG4 |
NSW1 | Turbine - OCGT | $37.0k | $0 | — | 141.4 | 124,555.8 | 0.1% | $194.33 | View |
| Ballarat Energy Storage System | BALB1 |
VIC1 | Storage - Battery | $35.0k | $0 | — | -123.3 | 6,324.5 | -0.6% | $0.00 | View |
| Smithfield Energy Facility | SITHE01 |
NSW1 | Turbine - OCGT | $32.7k | $0 | — | 193.3 | 193.3 | 0.2% | $128.50 | View |
| Clover | CLOVER |
VIC1 | Hydro - Dam | $31.7k | $0 | — | 815.3 | — | 3.9% | $1.17 | View |
| Royalla Solar Farm | ROYALLA1 |
NSW1 | Solar PV - Fixed | $31.0k | $0 | — | 1,453.3 | — | 10.1% | $0.20 | View |
| Mornington BESS | MRNBESS1 |
VIC1 | Storage - Battery | $28.6k | $0 | — | -1,088.5 | 5,075.5 | -0.6% | $1.50 | View |
| Kennedy Energy Park - Phase 1 - Solar | KEPSF1 |
QLD1 | Solar PV - Single axis tracking | $26.3k | $0 | — | 1,576.7 | 1,779.2 | 14.6% | $0.34 | View |
| Jeeralang B | JLB03 |
VIC1 | Turbine - OCGT | $25.5k | $0 | — | 183.7 | 56,043.0 | 0.3% | $137.85 | View |
| Hallett GT | AGLHAL |
SA1 | Turbine - OCGT | $24.7k | $0 | — | 203.3 | 115,548.3 | 0.1% | $100.22 | View |
| Hughenden Sun Farm | HUGSF1 |
QLD1 | Solar PV - Single axis tracking | $23.5k | $0 | — | 1,775.5 | — | 11.8% | $0.00 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | MAPS3PV1 |
SA1 | Solar PV - Single axis tracking | $23.4k | $0 | — | 1,407.0 | 1,880.1 | 11.8% | $0.25 | View |
| Bell Bay Three | BBTHREE2 |
TAS1 | Turbine - OCGT | $22.8k | $0 | — | 325.6 | 5,384.2 | 1.1% | $137.22 | View |
| Oakey Power Station | OAKEY2 |
QLD1 | Turbine - OCGT | $21.1k | $0 | — | 137.9 | 33,726.5 | 0.1% | $128.50 | View |
| Jeeralang A | JLA04 |
VIC1 | Turbine - OCGT | $20.2k | $0 | — | 138.1 | 38,799.0 | 0.4% | $177.20 | View |
| Bairnsdale | BDL01 |
VIC1 | Turbine - OCGT | $17.9k | $0 | — | 266.3 | 25,954.5 | 0.8% | $142.10 | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | MBPS2PV1 |
SA1 | Solar PV - Single axis tracking | $17.6k | $0 | — | 520.6 | 916.9 | 5.3% | $0.25 | View |
| Colongra | CG3 |
NSW1 | Turbine - OCGT | $17.1k | $0 | — | 151.3 | 120,306.1 | 0.1% | $144.24 | View |
| Happy Valley Reservoir | HVWWPV1 |
SA1 | Solar PV - Single axis tracking | $16.1k | $0 | — | 862.3 | 1,267.7 | 10.9% | $0.00 | View |
| Bolivar Waste Water Treatment | BOWWPV1 |
SA1 | Solar PV - Fixed | $16.1k | $0 | — | 742.6 | 1,009.2 | 12.5% | $0.23 | View |
| Adelaide Desalination Plant | ADPBA1 |
SA1 | Storage - Battery | $15.1k | $945 | 8,864.3 | -121.8 | 3,820.8 | -2.2% | $0.00 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | MAPS2PV1 |
SA1 | Solar PV - Single axis tracking | $14.6k | $0 | — | 868.6 | 1,172.4 | 7.3% | $0.26 | View |
| Oakey Power Station | OAKEY1 |
QLD1 | Turbine - OCGT | $14.4k | $0 | — | 85.3 | 23,317.0 | 0.1% | $128.50 | View |
| Colongra | CG2 |
NSW1 | Turbine - OCGT | $12.5k | $0 | — | 141.9 | 106,995.8 | 0.1% | $135.55 | View |
| Mt Stuart | MSTUART2 |
QLD1 | Turbine - OCGT | $11.9k | $0 | — | 150.9 | 64,174.3 | 0.1% | $148.45 | View |
| Happy Valley Reservoir | HVWWBA1 |
SA1 | Storage - Battery | $11.6k | $635 | 5,019.5 | -65.1 | 2,484.7 | -1.6% | $1.58 | View |
| Morgan To Whyalla Pipeline No 4 PS | MWPS4PV1 |
SA1 | Solar PV - Single axis tracking | $11.1k | $0 | — | 339.1 | 569.2 | 8.6% | $0.25 | View |
| Mt Stuart | MSTUART1 |
QLD1 | Turbine - OCGT | $10.5k | $0 | — | 150.9 | 55,843.4 | 0.1% | $2.00 | View |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | MWPS1PV1 |
SA1 | Solar PV - Single axis tracking | $10.4k | $0 | — | 370.9 | 685.8 | 9.4% | $0.25 | View |
| Colongra | CG1 |
NSW1 | Turbine - OCGT | $9.8k | $0 | — | 141.2 | 110,601.2 | 0.1% | $197.00 | View |
| Morgan To Whyalla Pipeline No 3 PS | MWPS3PV1 |
SA1 | Solar PV - Single axis tracking | $9.1k | $0 | — | 302.3 | 561.5 | 5.6% | $0.25 | View |
| Dalrymple BESS | DALNTH1 |
SA1 | Storage - Battery | $8.3k | $0 | — | -166.3 | 8,720.2 | -0.8% | $2.03 | View |
| Bolivar Waste Water Treatment | BOWWBA1 |
SA1 | Storage - Battery | $7.7k | $205 | 27.0 | -4.7 | 1,285.2 | -0.2% | $1.58 | View |
| Bell Bay Three | BBTHREE1 |
TAS1 | Turbine - OCGT | $6.6k | $0 | — | 143.3 | 11,193.7 | 0.5% | $182.63 | View |
| Philip Island BESS | PIBESS1 |
VIC1 | Storage - Battery | $6.0k | $5.5k | 1,547.3 | -394.5 | 3,139.9 | -11.0% | $1.50 | View |
| Christies Beach Wastewater Treatment Plant | CBWWBA1 |
SA1 | Storage - Battery | $5.4k | $184 | 32.7 | -29.6 | 1,119.1 | -1.9% | $1.50 | View |
| Valley Power | VPGS1 |
VIC1 | Turbine - OCGT | $5.3k | $0 | — | 65.2 | 28,654.6 | 0.2% | $128.50 | View |
| Bulgana Green Power Hub - BESS | BULBES1 |
VIC1 | Storage - Battery | $4.6k | $12.9k | 27,065.4 | -1,009.9 | 11,515.3 | -7.0% | $1.98 | View |
| Valley Power | VPGS6 |
VIC1 | Turbine - OCGT | $4.2k | $0 | — | 49.4 | 26,353.7 | 0.1% | $128.50 | View |
| Bell Bay Three | BBTHREE3 |
TAS1 | Turbine - OCGT | $4.2k | $0 | — | 33.7 | 16,120.1 | 0.1% | $141.97 | View |
| Morgan To Whyalla Pipeline No 2 PS | MWPS2PV1 |
SA1 | Solar PV - Single axis tracking | $4.1k | $0 | — | 120.1 | 231.7 | 3.0% | $0.25 | View |
| Lonsdale | LONSDALE |
SA1 | Reciprocating Engine - Compression ignition | $2.7k | $0 | — | 19.4 | 13,703.4 | 0.1% | $308.00 | View |
| Port Stanvac 1 | PTSTAN1 |
SA1 | Reciprocating Engine - Compression ignition | $2.6k | $0 | — | 58.5 | 39,328.6 | 0.1% | $308.00 | View |
| Jeeralang A | JLA01 |
VIC1 | Turbine - OCGT | $2.0k | $0 | — | 21.2 | 13,918.5 | 0.1% | $135.55 | View |
| Dry Creek GT | DRYCGT2 |
SA1 | Turbine - OCGT | $1.0k | $0 | — | 67.9 | 25,098.7 | 0.2% | $135.55 | View |
| Dry Creek GT | DRYCGT1 |
SA1 | Turbine - OCGT | $1.0k | $0 | — | 67.9 | 33,166.5 | 0.2% | $141.50 | View |
| SMFBESS1 | SMFBESS1 |
SA1 | $860 | $0 | — | 12.5 | 133.8 | 0.0% | $1.50 | View | |
| Condamine A | CPSA |
QLD1 | Turbine - CCGT | $517 | $0 | — | 3.4 | 252.8 | 0.0% | $95.40 | View |
| Hunter EconomicZone | HEZ1 |
NSW1 | Reciprocating Engine - Compression ignition | $445 | $0 | — | 3.2 | 14,047.2 | 0.0% | $308.00 | View |
| Tarong | TARONG#3 |
QLD1 | Turbine - Steam Sub Critical | $52 | $0 | — | 0.6 | — | 0.0% | $55.48 | View |
| Braemar 2 Power Station | BRAEMAR5 |
QLD1 | Turbine - OCGT | $13 | $0 | — | 0.2 | 24,457.3 | 0.0% | $3.14 | View |
| Mintaro GT | MINTARO |
SA1 | Turbine - OCGT | $7 | $0 | — | 0.1 | 62,656.0 | 0.0% | $128.50 | View |
| DRGBND01 | DRGBND01 |
$0 | $0 | 2,963.9 | — | — | — | — | View | ||
| VENUS1 | VENUS1 |
$0 | $0 | 647.8 | — | — | — | — | View | ||
| DRGBND02 | DRGBND02 |
$0 | $0 | 1,961.0 | — | — | — | — | View | ||
| VSVEL2S1 | VSVEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND03 | DRGBND03 |
$0 | $0 | 14,208.1 | — | — | — | — | View | ||
| VSQHT1V1 | VSQHT1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND04 | DRGBND04 |
$0 | $0 | 15,706.4 | — | — | — | — | View | ||
| Valley Power | VPGS5 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 26,352.7 | 0.0% | $128.50 | View |
| DRFIIN02 | DRFIIN02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRFIIN01 | DRFIIN01 |
$0 | $0 | — | — | — | — | — | View | ||
| VSNEL2S1 | VSNEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| Valley Power | VPGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 28,816.0 | 0.0% | $128.50 | View |
| VSSSH1S1 | VSSSH1S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSE1V1 | VSSSE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| Valley Power | VPGS3 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 28,811.4 | 0.0% | $128.50 | View |
| Valley Power | VPGS4 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 16,362.7 | 0.0% | $128.50 | View |
| VSSAE1V1 | VSSAE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| Uranquinty | URANQ12 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 90,900.8 | 0.0% | $128.50 | View |
| DRXNAD01 | DRXNAD01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT02 | DRVIOT02 |
$0 | $0 | 1,409.9 | — | — | — | — | View | ||
| DRVIOT03 | DRVIOT03 |
$0 | $0 | 1,691.4 | — | — | — | — | View | ||
| DRVIOT04 | DRVIOT04 |
$0 | $0 | 50,918.9 | — | — | — | — | View | ||
| DRVIOT05 | DRVIOT05 |
$0 | $0 | 11,393.0 | — | — | — | — | View | ||
| DRVIOT06 | DRVIOT06 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT07 | DRVIOT07 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAE01 | DRXNAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA01 | DRXNDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA02 | DRXNDA02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT01 | DRVIOT01 |
$0 | $0 | 4,521.0 | — | — | — | — | View | ||
| DRSHVS02 | DRSHVS02 |
$0 | $0 | 18,628.2 | — | — | — | — | View | ||
| DRSHVS01 | DRSHVS01 |
$0 | $0 | 1,164.8 | — | — | — | — | View | ||
| Uranquinty | URANQ11 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | 89,828.3 | 0.0% | $128.50 | View |
| DRHTVP01 | DRHTVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC11 | RT_VIC11 |
$0 | $0 | — | — | — | — | — | View | ||
| DRHTVP03 | DRHTVP03 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP02 | DROZVP02 |
$0 | $0 | — | — | — | — | — | View | ||
| DROZVP03 | DROZVP03 |
$0 | $0 | 19.8 | — | — | — | — | View | ||
| DRPSTQ01 | DRPSTQ01 |
$0 | $0 | 4,200.0 | — | — | — | — | View | ||
| DRPSTV01 | DRPSTV01 |
$0 | $0 | 1,882.5 | — | — | — | — | View | ||
| DRSHVN01 | DRSHVN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVN02 | DRSHVN02 |
$0 | $0 | 27,342.8 | — | — | — | — | View | ||
| DRXNDA03 | DRXNDA03 |
$0 | $0 | — | — | — | — | — | View | ||
| Wivenhoe | W/HOE#1 |
Storage - Pumped hydro | $0 | $0 | — | — | — | — | — | View | |
| Wooreen Energy Storage System | WOORB1 |
VIC1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $1.50 | View |
| ASNENC1 | ASNENC1 |
$0 | $0 | 2,802.7 | — | — | — | — | View | ||
| ASPAPM01 | ASPAPM01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPBSC01 | ASPBSC01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPSTV01 | ASPSTV01 |
$0 | $0 | 465.8 | — | — | — | — | View | ||
| ASQEEV1 | ASQEEV1 |
$0 | $0 | 2,575.0 | — | — | — | — | View | ||
| ASQENC1 | ASQENC1 |
$0 | $0 | 720.7 | — | — | — | — | View | ||
| ASRMGE01 | ASRMGE01 |
$0 | $0 | 14.1 | — | — | — | — | View | ||
| ASRMGE02 | ASRMGE02 |
$0 | $0 | 14.2 | — | — | — | — | View | ||
| ASRMGE03 | ASRMGE03 |
$0 | $0 | 14.1 | — | — | — | — | View | ||
| ASRMGE04 | ASRMGE04 |
$0 | $0 | 11,738.0 | — | — | — | — | View | ||
| Townsville Power Station | YABULU2 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| ASNBRL1 | ASNBRL1 |
$0 | $0 | 11,882.1 | — | — | — | — | View | ||
| TB3B1 | TB3B1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVQ01 | DRSHVQ01 |
$0 | $0 | 249.5 | — | — | — | — | View | ||
| APD01 | APD01 |
$0 | $0 | 74,178.2 | — | — | — | — | View | ||
| ASACLE01 | ASACLE01 |
$0 | $0 | 5,437.4 | — | — | — | — | View | ||
| ASDEVI01 | ASDEVI01 |
$0 | $0 | 5,631.7 | — | — | — | — | View | ||
| ASDLBY01 | ASDLBY01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGV01 | ASENGV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGY01 | ASENGY01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASGENE01 | ASGENE01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNAES1 | ASNAES1 |
$0 | $0 | 90.7 | — | — | — | — | View | ||
| WOOLES1 | WOOLES1 |
$0 | $0 | — | -301.6 | 849.1 | — | — | View | ||
| ASRMGE05 | ASRMGE05 |
$0 | $0 | 8,765.3 | — | — | — | — | View | ||
| ASSDE1 | ASSDE1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_QLD1 | DG_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_SA1 | DG_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_TAS1 | DG_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_VIC1 | DG_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRACAN1 | DRACAN1 |
$0 | $0 | 592.0 | — | — | — | — | View | ||
| DRACAV1 | DRACAV1 |
$0 | $0 | — | — | — | — | — | View | ||
| WAMBOWF2 | WAMBOWF2 |
$0 | $0 | — | 9,328.7 | 9,326.7 | — | — | View | ||
| DRAESN3 | DRAESN3 |
$0 | $0 | — | — | — | — | — | View | ||
| DRAESS1 | DRAESS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DRBRLV01 | DRBRLV01 |
$0 | $0 | 10,228.7 | — | — | — | — | View | ||
| DG_NSW1 | DG_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| CRWARP1 | CRWARP1 |
$0 | $0 | — | 27,820.3 | 31,280.6 | — | — | View | ||
| WNSF1 | WNSF1 |
$0 | $0 | — | 2,974.3 | — | — | — | View | ||
| ASSENC1 | ASSENC1 |
$0 | $0 | 886.0 | — | — | — | — | View | ||
| ASSERDV1 | ASSERDV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASTHYD1 | ASTHYD1 |
$0 | $0 | 860.7 | — | — | — | — | View | ||
| Barcaldine Power Station | BARCALDN |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $141.78 | View |
| Bairnsdale | BDL02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $158.38 | View |
| Braemar | BRAEMAR2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 132,078.0 | 0.0% | $130.94 | View |
| Braemar | BRAEMAR3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 128,970.5 | 0.0% | $128.50 | View |
| Braemar 2 Power Station | BRAEMAR7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 111,814.7 | 0.0% | $132.25 | View |
| BUNGAMB1 | BUNGAMB1 |
$0 | $0 | 302,205.2 | -3,923.6 | 100,883.6 | — | — | View | ||
| Wivenhoe | W/HOE#2 |
Storage - Pumped hydro | $0 | $0 | 1,345.7 | 39,256.8 | 117,346.1 | — | — | View | |
| Jeeralang B | JLB01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 18,369.0 | 0.0% | $128.50 | View |
| RT_NSW3 | RT_NSW3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW2 | RT_NSW2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW1 | RT_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| Jeeralang B | JLB02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 53,887.5 | 0.0% | $137.71 | View |
| Kareeya | KAREEYA1 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Kareeya | KAREEYA2 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Kareeya | KAREEYA3 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.05 | View |
| Roma | ROMA_8 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 23,263.7 | 0.0% | $128.50 | View |
| Kareeya | KAREEYA4 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.66 | View |
| RT_NSW4 | RT_NSW4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW5 | RT_NSW5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW6 | RT_NSW6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC10 | RT_VIC10 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC1 | RT_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_TAS1 | RT_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA6 | RT_SA6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA4 | RT_SA4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA3 | RT_SA3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA2 | RT_SA2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA1 | RT_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_QLD1 | RT_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| Kennedy Energy Park - Phase 1 - Storage | KEPBG1 |
QLD1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $2.03 | View |
| KEPBL1 | KEPBL1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG1 | KIDSPHG1 |
$0 | $0 | — | — | — | — | — | View | ||
| Poatina | POAT220 |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Poatina | POAT110 |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| PLBESS1 | PLBESS1 |
$0 | $0 | — | -126.5 | 2,130.7 | — | — | View | ||
| PIONEER | PIONEER |
$0 | $0 | — | 19,417.4 | — | — | — | View | ||
| MLB01 | MLB01 |
$0 | $0 | — | -1,835.0 | 56,495.7 | — | — | View | ||
| MLSP1 | MLSP1 |
$0 | $0 | — | 1,715.5 | — | — | — | View | ||
| MREHA1 | MREHA1 |
$0 | $0 | 54,310.2 | -3,675.8 | 122,105.4 | — | — | View | ||
| MREHA2 | MREHA2 |
$0 | $0 | 56,186.8 | -3,835.1 | 117,581.5 | — | — | View | ||
| MREHA3 | MREHA3 |
$0 | $0 | 105,940.7 | -2,970.7 | 140,681.8 | — | — | View | ||
| Port Lincoln GT | POR01 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Port Lincoln GT | POR03 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| PUMP1 | PUMP1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG2 | KIDSPHG2 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL1 | KIDSPHL1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL2 | KIDSPHL2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA5 | RT_SA5 |
$0 | $0 | — | — | — | — | — | View | ||
| Kogan Creek | KPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Quarantine | QPS4 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Laverton North | LNGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 105,942.7 | 0.0% | $128.50 | View |
| Laverton North | LNGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 114,553.3 | 0.0% | $128.50 | View |
| PUMP2 | PUMP2 |
$0 | $0 | — | 57,224.5 | 58,570.1 | — | — | View | ||
| Mt Stuart | MSTUART3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 83,583.0 | 0.0% | $2.00 | View |
| DRXNDA04 | DRXNDA04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXSQS01 | DRXSQS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVAE01 | DRXVAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDJ01 | DRXVDJ01 |
$0 | $0 | — | — | 134.6 | — | — | View | ||
| STABESS1 | STABESS1 |
$0 | $0 | — | -472.6 | 477.5 | — | — | View | ||
| DRXVDP01 | DRXVDP01 |
$0 | $0 | — | — | — | — | — | View | ||
| Snuggery | SNUG1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| SNOWYP | SNOWYP |
$0 | $0 | — | 63,181.7 | 63,609.1 | — | — | View | ||
| SNOWYGJP | SNOWYGJP |
$0 | $0 | 4,676.5 | — | — | — | — | View | ||
| DRXVDX01 | DRXVDX01 |
$0 | $0 | — | — | 10.6 | — | — | View | ||
| DRXVQP01 | DRXVQP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQQE01 | DRXQQE01 |
$0 | $0 | — | — | 353.5 | — | — | View | ||
| DRXQDA01 | DRXQDA01 |
$0 | $0 | — | — | 1.9 | — | — | View | ||
| DRXNDB04 | DRXNDB04 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDE01 | DRXNDE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDJ01 | DRXNDJ01 |
$0 | $0 | — | — | 2.5 | — | — | View | ||
| DRXNDW01 | DRXNDW01 |
$0 | $0 | — | — | 2.7 | — | — | View | ||
| DRXNFF01 | DRXNFF01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNFS01 | DRXNFS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNQX01 | DRXNQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNSS01 | DRXNSS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNTM02 | DRXNTM02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNVS01 | DRXNVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX01 | DRXVQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX02 | DRXVQX02 |
$0 | $0 | — | — | 5.2 | — | — | View | ||
| Hunter Power Station | HUNTER2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $152.46 | View |
| Jeeralang A | JLA02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 38,493.0 | 0.0% | $128.50 | View |
| Jeeralang A | JLA03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 38,799.0 | 0.0% | $141.46 | View |
| RT_VIC9 | RT_VIC9 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC8 | RT_VIC8 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC7 | RT_VIC7 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC6 | RT_VIC6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC5 | RT_VIC5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC4 | RT_VIC4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC3 | RT_VIC3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC2 | RT_VIC2 |
$0 | $0 | — | — | — | — | — | View | ||
| Hume Dam VIC | HUMEV |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.54 | View |
| RT_VIC12 | RT_VIC12 |
$0 | $0 | — | — | — | — | — | View | ||
| Snapper Point Power Station | SNAPPER1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 107,255.6 | 0.0% | $128.50 | View |
| DROZVP01 | DROZVP01 |
$0 | $0 | 2.0 | — | — | — | — | View | ||
| Dry Creek GT | DRYCGT3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 34,575.0 | 0.0% | $210.15 | View |
| Eraring | ER01 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $48.29 | View |
| SHPUMP | SHPUMP |
$0 | $0 | — | 7,272.0 | 7,392.0 | — | — | View | ||
| ERB02 | ERB02 |
$0 | $0 | — | -123.3 | 382.7 | — | — | View | ||
| Eraring GT | ERGT01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $96.96 | View |
| Broken Hill GT | GB01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.11 | View |
| LINCOLN GAP BESSBDU | LGAPBS1 |
SA1 | Storage - Battery | $-3 | $0 | — | 0.7 | — | 0.0% | $1.50 | View |
| Angaston | ANGAST1 |
SA1 | Reciprocating Engine - Compression ignition | $-14 | $0 | — | -0.2 | 32,607.7 | 0.0% | $0.00 | View |
| NESBESS2 | NESBESS2 |
NSW1 | $-17 | $0 | — | -1.1 | — | 0.0% | $1.50 | View | |
| Roma | ROMA_7 |
QLD1 | Turbine - OCGT | $-601 | $0 | — | 100.8 | 23,656.0 | 0.4% | $128.50 | View |
| Queanbeyan BESS | QBYNB1 |
NSW1 | Storage - Battery | $-1.4k | $3 | 1.3 | -33.8 | 8.1 | -0.5% | $1.50 | View |
| SMFBESS2 | SMFBESS2 |
SA1 | $-9.4k | $0 | — | -182.5 | 152.1 | -0.1% | $1.50 | View |