MLF-adjusted revenue, dispatch, capacity factor, and estimated SRMC from AEMO 5‑minute dispatch data. Data through 06 Nov 2026, 12:35 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Bayswater | BW04 |
NSW1 | Turbine - Steam Sub Critical | $51.67M | $10.4k | 7,507.4 | 401,398.0 | 484,123.2 | 81.4% | $55.48 | View |
| Bayswater | BW02 |
NSW1 | Turbine - Steam Sub Critical | $51.26M | $9.7k | 6,951.4 | 394,778.2 | 486,610.4 | 80.0% | $26.23 | View |
| Mt Piper | MP1 |
NSW1 | Turbine - Steam Sub Critical | $49.80M | $0 | — | 333,698.9 | 517,781.7 | 63.5% | $49.24 | View |
| Vales Point B | VP6 |
NSW1 | Turbine - Steam Sub Critical | $41.23M | $41 | 235.2 | 273,827.1 | 441,418.0 | 57.6% | $52.60 | View |
| Bayswater | BW01 |
NSW1 | Turbine - Steam Sub Critical | $40.54M | $9.1k | 6,168.6 | 328,228.0 | 395,868.7 | 69.1% | $53.57 | View |
| Eraring | ER04 |
NSW1 | Turbine - Steam Sub Critical | $37.90M | $3.8k | 542.2 | 265,665.9 | 397,835.7 | 51.2% | $55.48 | View |
| Vales Point B | VP5 |
NSW1 | Turbine - Steam Sub Critical | $34.70M | $44 | 239.8 | 258,375.7 | 394,785.8 | 54.4% | $52.60 | View |
| Millmerran Power Plant | MPP_2 |
QLD1 | Turbine - Steam Super Critical | $28.69M | $0 | — | 299,727.2 | 303,716.8 | 97.7% | $52.60 | View |
| Eraring | ER02 |
NSW1 | Turbine - Steam Sub Critical | $28.31M | $2.6k | 377.0 | 178,725.4 | 236,693.2 | 34.5% | $59.45 | View |
| Callide C | CPP_3 |
QLD1 | Turbine - Steam Super Critical | $25.19M | $0 | — | 272,151.2 | 296,499.8 | 89.1% | $44.41 | View |
| Callide C | CPP_4 |
QLD1 | Turbine - Steam Super Critical | $24.91M | $0 | — | 269,161.0 | 291,327.5 | 89.0% | $101.94 | View |
| Tumut 3 | TUMUT3 |
NSW1 | Hydro - Dam | $24.26M | $2.7k | 8,221.0 | 56,166.3 | 1,220,483.0 | 5.2% | $1.05 | View |
| Tarong North | TNPS1 |
QLD1 | Turbine - Steam Super Critical | $23.71M | $0 | — | 239,926.9 | 281,155.0 | 74.1% | $52.60 | View |
| Loy Yang B | LOYYB2 |
VIC1 | Turbine - Steam Sub Critical | $20.85M | $3.9k | 8,207.5 | 402,890.0 | 405,299.9 | 96.5% | $47.20 | View |
| Stanwell | STAN-1 |
QLD1 | Turbine - Steam Sub Critical | $20.74M | $5.2k | 1,619.3 | 221,337.2 | 248,692.5 | 84.2% | $52.60 | View |
| Loy Yang A Power Station | LYA3 |
VIC1 | Turbine - Steam Sub Critical | $20.53M | $2.1k | 5,560.3 | 314,053.3 | 391,901.7 | 77.9% | $47.20 | View |
| Stanwell | STAN-2 |
QLD1 | Turbine - Steam Sub Critical | $20.28M | $5.5k | 749.9 | 216,180.4 | 244,716.7 | 82.3% | $52.60 | View |
| Tarong | TARONG#2 |
QLD1 | Turbine - Steam Sub Critical | $20.27M | $5.6k | 737.6 | 201,659.9 | 233,885.0 | 80.0% | $55.48 | View |
| Loy Yang A Power Station | LYA4 |
VIC1 | Turbine - Steam Sub Critical | $19.90M | $2.0k | 5,300.3 | 304,043.6 | 381,792.1 | 75.4% | $47.20 | View |
| Callide B | CALL_B_1 |
QLD1 | Turbine - Steam Sub Critical | $19.85M | $7.2k | 4,604.0 | 214,987.4 | 248,017.1 | 85.3% | $32.60 | View |
| Loy Yang A Power Station | LYA2 |
VIC1 | Turbine - Steam Sub Critical | $19.68M | $3.3k | 1,760.1 | 322,497.8 | 374,785.0 | 84.5% | $47.20 | View |
| Stanwell | STAN-3 |
QLD1 | Turbine - Steam Sub Critical | $19.53M | $139 | 8.0 | 206,645.1 | 234,778.3 | 78.6% | $52.60 | View |
| Tarong | TARONG#4 |
QLD1 | Turbine - Steam Sub Critical | $19.51M | $5.8k | 820.1 | 195,023.7 | 221,805.4 | 77.4% | $52.58 | View |
| Loy Yang B | LOYYB1 |
VIC1 | Turbine - Steam Sub Critical | $19.14M | $4.3k | 8,217.1 | 382,740.2 | 382,604.3 | 91.7% | $47.20 | View |
| Upper Tumut | UPPTUMUT |
NSW1 | Hydro - Dam | $19.08M | $11.3k | 12,548.6 | 132,919.3 | 405,347.2 | 30.0% | $1.00 | View |
| Callide B | CALL_B_2 |
QLD1 | Turbine - Steam Sub Critical | $18.67M | $4.0k | 2,527.1 | 206,627.1 | 217,035.8 | 82.0% | $55.48 | View |
| Tarong | TARONG#1 |
QLD1 | Turbine - Steam Sub Critical | $17.74M | $1.2k | 3.3 | 185,168.2 | 210,706.7 | 73.5% | $52.60 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $16.41M | $0 | — | 177,586.1 | 175,539.0 | 26.7% | $0.58 | View |
| Eraring | ER01 |
NSW1 | Turbine - Steam Sub Critical | $16.00M | $1.6k | 225.7 | 159,816.9 | 194,334.9 | 30.8% | $48.29 | View |
| Eraring | ER03 |
NSW1 | Turbine - Steam Sub Critical | $14.09M | $1.9k | 244.4 | 138,905.3 | 208,691.8 | 26.8% | $49.77 | View |
| Yallourn W | YWPS4 |
VIC1 | Turbine - Steam Sub Critical | $13.38M | $0 | — | 247,460.0 | 268,687.3 | 91.7% | $47.20 | View |
| Gladstone | GSTONE4 |
QLD1 | Turbine - Steam Sub Critical | $13.31M | $5.4k | 3,452.4 | 137,082.7 | 191,806.2 | 68.0% | $52.60 | View |
| Stanwell | STAN-4 |
QLD1 | Turbine - Steam Sub Critical | $12.45M | $0 | — | 139,204.7 | 146,840.8 | 53.0% | $52.60 | View |
| Gladstone | GSTONE5 |
QLD1 | Turbine - Steam Sub Critical | $12.15M | $5.5k | 3,569.3 | 123,686.0 | 193,145.8 | 61.4% | $58.48 | View |
| Gladstone | GSTONE2 |
QLD1 | Turbine - Steam Sub Critical | $11.74M | $2.4k | 948.0 | 121,942.3 | 194,944.2 | 60.5% | $49.17 | View |
| Murray 2 | MURRAY |
VIC1 | Hydro - Dam | $11.71M | $5.7k | 5,298.2 | 97,524.0 | 832,953.5 | 22.6% | $1.00 | View |
| Gladstone | GSTONE6 |
QLD1 | Turbine - Steam Sub Critical | $11.69M | $6.3k | 3,807.7 | 120,606.4 | 192,967.1 | 59.8% | $54.96 | View |
| Yallourn W | YWPS1 |
VIC1 | Turbine - Steam Sub Critical | $11.23M | $0 | — | 219,349.9 | 229,212.5 | 87.0% | $47.20 | View |
| Tallawarra | TALWA1 |
NSW1 | Turbine - CCGT | $10.28M | $0 | — | 43,162.3 | 64,254.4 | 15.0% | $84.30 | View |
| Yallourn W | YWPS3 |
VIC1 | Turbine - Steam Sub Critical | $10.21M | $0 | — | 205,630.9 | 226,644.6 | 76.2% | $47.20 | View |
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $10.18M | $0 | — | 111,052.3 | 113,719.8 | 34.1% | $0.68 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $10.04M | $0 | — | 99,670.4 | 111,777.1 | 40.0% | $0.00 | View |
| Gordon | GORDON |
TAS1 | Hydro - Dam | $9.73M | $142.6k | 46,107.7 | 124,895.1 | 175,049.2 | 40.2% | $1.05 | View |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $8.00M | $0 | — | 86,411.2 | 88,711.5 | 30.3% | $0.50 | View |
| Gladstone | GSTONE3 |
QLD1 | Turbine - Steam Sub Critical | $6.52M | $2.9k | 2,221.1 | 59,977.7 | 86,366.2 | 29.8% | $128.75 | View |
| Pelican Point | PPCCGT |
SA1 | Turbine - CCGT | $5.96M | $0 | — | 67,407.5 | 88,015.7 | 17.7% | $84.30 | View |
| Poatina | POAT220 |
TAS1 | Hydro - Dam | $5.63M | $210.7k | 23,652.4 | 62,711.7 | 170,780.0 | 43.5% | $1.00 | View |
| Wollar Solar Farm | WOLARSF1 |
NSW1 | Solar PV - Single axis tracking | $5.29M | $0 | — | 59,215.4 | 57,855.4 | 29.4% | $0.25 | View |
| Gladstone | GSTONE1 |
QLD1 | Turbine - Steam Sub Critical | $5.18M | $2.0k | 1,082.9 | 60,379.2 | 89,412.9 | 29.9% | $52.99 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $5.12M | $0 | — | 54,679.4 | 54,537.1 | 43.9% | $0.53 | View |
| Wellington North Solar Farm (Lightsource) | WELNSF1 |
NSW1 | Solar PV - Single axis tracking | $4.64M | $0 | — | 67,255.3 | 65,496.1 | 21.4% | $0.25 | View |
| Barker Inlet Power Station | BARKIPS1 |
SA1 | Reciprocating Engine - Spark ignition | $4.22M | $0 | — | 37,666.4 | 130,062.4 | 24.9% | $9.00 | View |
| Catagunya / Liapootah / Wayatinah | LI_WY_CA |
TAS1 | Hydro - Dam | $4.06M | $16.3k | 4,442.8 | 56,957.5 | 125,277.4 | 44.8% | $1.05 | View |
| Stubbo Solar Farm | STUBSF1 |
NSW1 | Solar PV - Single axis tracking | $3.89M | $0 | — | 48,511.2 | 47,454.4 | 34.0% | $0.25 | View |
| Darling Downs | DDPS1 |
QLD1 | Turbine - CCGT | $3.89M | $0 | — | 26,215.5 | 27,715.7 | 5.6% | $3.31 | View |
| Culcairn Solar Farm | CUSF1 |
NSW1 | Solar PV - Single axis tracking | $3.88M | $0 | — | 37,903.0 | 93,163.2 | 15.0% | $0.25 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $3.87M | $0 | — | 29,697.6 | 31,202.1 | 25.9% | $0.00 | View |
| Western Downs Green Power Hub P/L | WDGPH1 |
QLD1 | Solar PV - Single axis tracking | $3.79M | $2.1k | 179.4 | 73,599.1 | 71,523.5 | 25.6% | $0.32 | View |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $3.64M | $0 | — | 34,489.2 | 34,506.7 | 32.9% | $0.58 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $3.59M | $0 | — | 39,323.4 | 39,444.6 | 31.2% | $0.50 | View |
| Darlington Point Solar Farm | DARLSF1 |
NSW1 | Solar PV - Single axis tracking | $3.51M | $0 | — | 45,750.9 | 53,606.8 | 23.1% | $0.33 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $3.41M | $0 | — | 70,233.5 | 69,785.1 | 36.1% | $0.50 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $3.33M | $0 | — | 137,713.5 | 139,506.8 | 36.3% | $0.50 | View |
| Avonlie Solar Farm | AVLSF1 |
NSW1 | Solar PV - Single axis tracking | $3.33M | $0 | — | 42,525.1 | 45,908.7 | 23.2% | $0.00 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $3.30M | $0 | — | 34,656.7 | 35,078.3 | 24.2% | $0.50 | View |
| Shoalhaven | SHOAL1 |
NSW1 | Storage - Pumped hydro | $3.17M | $0 | — | 24,827.6 | — | 14.0% | $1.20 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $3.14M | $0 | — | 31,947.7 | 33,463.0 | 42.9% | $0.58 | View |
| Kogan Creek | KPP_1 |
QLD1 | Turbine - Steam Super Critical | $3.13M | $0 | — | 47,263.5 | 42,140.2 | 8.8% | $52.60 | View |
| Stubbo Solar Farm | STUBSF2 |
NSW1 | Solar PV - Single axis tracking | $3.09M | $0 | — | 46,855.8 | 45,839.0 | 32.2% | $0.25 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $3.09M | $0 | — | 19,634.3 | 19,508.0 | 25.5% | $0.50 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $3.04M | $0 | — | 43,762.8 | 44,591.8 | 42.2% | $0.66 | View |
| Hume Dam NSW | HUMENSW |
NSW1 | Hydro - Dam | $3.00M | $0 | — | 25,377.0 | 25,813.5 | 100.0% | $1.05 | View |
| Broadsound Solar Farm | BRDDSF01 |
QLD1 | Solar PV - Single axis tracking | $2.87M | $0 | — | 46,420.0 | 50,890.8 | 17.5% | $0.27 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $2.85M | $0 | — | 31,680.8 | 33,119.8 | 19.4% | $0.65 | View |
| Torrens Island B | TORRB3 |
SA1 | Turbine - Steam Sub Critical | $2.73M | $5.7k | 6,442.9 | 35,838.2 | 110,124.0 | 24.9% | $2.00 | View |
| Uranquinty | URANQ13 |
NSW1 | Turbine - OCGT | $2.71M | $0 | — | 3,818.5 | 108,220.0 | 3.1% | $128.50 | View |
| John Butters | JBUTTERS |
TAS1 | Hydro - Dam | $2.70M | $25.3k | 11,562.7 | 26,312.4 | 77,448.0 | 25.4% | $0.00 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $2.70M | $0 | — | 26,646.1 | 27,355.6 | 32.8% | $0.00 | View |
| Limondale Solar Farm 1 | LIMOSF11 |
NSW1 | Solar PV - Single axis tracking | $2.68M | $0 | — | 40,848.1 | 42,772.6 | 24.7% | $0.25 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $2.68M | $0 | — | 26,348.9 | 26,328.9 | 32.3% | $0.68 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $2.67M | $0 | — | 28,627.0 | 30,202.4 | 24.0% | $0.53 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $2.63M | $0 | — | 27,869.7 | 27,933.6 | 27.3% | $0.53 | View |
| Eraring Big Battery | ERB01 |
NSW1 | Storage - Battery | $2.59M | $82 | 7,993.8 | -5,663.5 | 283,321.6 | -3.3% | $1.58 | View |
| Tarraleah | TARRALEA |
TAS1 | Hydro - Dam | $2.59M | $0 | — | 42,445.4 | 41,914.8 | 65.5% | $1.00 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $2.55M | $0 | — | 18,909.3 | — | 18.7% | $0.00 | View |
| Glenellen Solar Farm | GESF1 |
NSW1 | Solar PV - Fixed | $2.55M | $0 | — | 35,121.8 | 39,506.7 | 18.8% | $0.00 | View |
| Wellington Solar Farm | WELLSF1 |
NSW1 | Solar PV - Single axis tracking | $2.45M | $0 | — | 31,913.0 | 32,344.5 | 20.5% | $0.25 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $2.44M | $0 | — | 20,069.5 | 20,466.8 | 32.9% | $0.00 | View |
| Reece | REECE2 |
TAS1 | Hydro - Dam | $2.41M | $120.6k | 20,165.8 | 24,952.2 | 74,147.5 | 30.0% | $1.00 | View |
| Blowering | BLOWERNG |
NSW1 | Hydro - Dam | $2.36M | $0 | — | 17,989.6 | 17,589.2 | 31.2% | $0.00 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $2.34M | $0 | — | 25,451.4 | 26,701.4 | 31.9% | $0.50 | View |
| Sunraysia Solar Farm | SUNRSF1 |
NSW1 | Solar PV - Single axis tracking | $2.30M | $0 | — | 34,987.7 | 36,173.4 | 21.2% | $0.25 | View |
| New England Solar Farm | NEWENSF1 |
NSW1 | Solar PV - Single axis tracking | $2.28M | $0 | — | 28,980.1 | 28,571.9 | 20.1% | $0.25 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $2.27M | $0 | — | 41,949.6 | 48,953.9 | 27.9% | $0.55 | View |
| Mortlake | MORTLK11 |
VIC1 | Turbine - OCGT | $2.26M | $0 | — | 16,523.4 | 147,016.5 | 7.9% | $128.50 | View |
| Uranquinty | URANQ14 |
NSW1 | Turbine - OCGT | $2.25M | $0 | — | 3,506.4 | 102,985.3 | 2.8% | $128.50 | View |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $2.24M | $0 | — | 22,135.4 | 28,711.7 | 17.0% | $0.50 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $2.17M | $0 | — | 39,369.2 | 39,130.7 | 32.5% | $0.50 | View |
| New England Solar Farm | NEWENSF2 |
NSW1 | Solar PV - Single axis tracking | $2.12M | $0 | — | 26,979.6 | 26,530.1 | 18.7% | $0.25 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $2.09M | $0 | — | 20,715.5 | 23,773.0 | 18.3% | $0.00 | View |
| Gunnedah Solar Farm | GNNDHSF1 |
NSW1 | Solar PV - Single axis tracking | $2.05M | $0 | — | 20,239.4 | 23,927.7 | 25.6% | $0.33 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $2.03M | $0 | — | 35,967.0 | 61,119.9 | 22.1% | $0.50 | View |
| Smithfield Energy Facility | SITHE01 |
NSW1 | Turbine - OCGT | $1.99M | $0 | — | 4,279.6 | 4,619.2 | 4.7% | $128.50 | View |
| Colongra | CG3 |
NSW1 | Turbine - OCGT | $1.97M | $0 | — | 6,856.6 | 121,822.4 | 5.3% | $144.24 | View |
| Reece | REECE1 |
TAS1 | Hydro - Dam | $1.97M | $118.0k | 16,644.4 | 20,548.3 | 77,738.7 | 24.7% | $1.00 | View |
| Mackintosh | MACKNTSH |
TAS1 | Hydro - Dam | $1.95M | $2.9k | 1,140.5 | 21,150.1 | 57,706.6 | 36.8% | $1.00 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $1.92M | $0 | — | 35,501.5 | — | 35.7% | $0.53 | View |
| Bastyan | BASTYAN |
TAS1 | Hydro - Dam | $1.91M | $2.9k | 1,574.3 | 21,866.3 | 52,860.0 | 38.0% | $0.00 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $1.89M | $0 | — | 32,863.9 | 44,084.3 | 22.4% | $0.00 | View |
| Orana BESS | ORABESS1 |
NSW1 | Storage - Battery | $1.86M | $14.5k | 11,402.7 | -7,607.4 | 230,425.6 | -2.5% | $1.50 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $1.82M | $0 | — | 56,875.9 | 67,088.0 | 25.3% | $0.50 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $1.78M | $0 | — | 44,448.0 | 57,618.1 | 28.3% | $0.50 | View |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $1.77M | $0 | — | 53,351.4 | 71,303.9 | 17.6% | $0.50 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $1.76M | $0 | — | 18,705.5 | 20,039.1 | 27.1% | $0.69 | View |
| Golden Plains Wind Farm West | GPWFWST2 |
VIC1 | Wind Turbine - Onshore | $1.72M | $0 | — | 30,758.6 | 67,685.6 | 7.7% | $0.53 | View |
| Coleambally Solar Farm | COLEASF1 |
NSW1 | Solar PV - Single axis tracking | $1.70M | $0 | — | 21,992.4 | 24,317.2 | 20.3% | $0.00 | View |
| Braemar | BRAEMAR1 |
QLD1 | Turbine - OCGT | $1.67M | $0 | — | 9,318.6 | 128,345.7 | 6.9% | $133.75 | View |
| Aldoga Solar Farm | ALDGASF1 |
QLD1 | Solar PV - Single axis tracking | $1.67M | $0 | — | 42,854.3 | 65,229.0 | 15.4% | $0.00 | View |
| Suntop Solar Farm | SUNTPSF1 |
NSW1 | Solar PV - Single axis tracking | $1.67M | $0 | — | 24,224.3 | 26,314.0 | 22.4% | $0.25 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $1.66M | $0 | — | 25,255.9 | 53,569.1 | 14.1% | $0.00 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $1.64M | $0 | — | 37,961.8 | 55,312.6 | 25.2% | $0.50 | View |
| Uranquinty | URANQ11 |
NSW1 | Turbine - OCGT | $1.64M | $0 | — | 2,317.8 | 55,696.9 | 1.9% | $128.50 | View |
| Broadwater | BWTR1 |
NSW1 | Turbine - Steam Sub Critical | $1.63M | $0 | — | 12,788.7 | — | 46.7% | $124.22 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $1.58M | $0 | — | 22,695.3 | 27,983.1 | 25.0% | $0.50 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $1.57M | $0 | — | 32,827.6 | 32,311.3 | 40.9% | $0.66 | View |
| Poatina | POAT110 |
TAS1 | Hydro - Dam | $1.52M | $289.9k | 19,427.6 | 19,877.0 | 41,824.2 | 27.6% | $1.00 | View |
| Columboola Solar Farm | COLUMSF1 |
QLD1 | Solar PV - Single axis tracking | $1.51M | $0 | — | 29,718.4 | 28,806.6 | 19.0% | $0.32 | View |
| Moranbah North | MBAHNTH |
QLD1 | Reciprocating Engine - Spark ignition | $1.50M | $0 | — | 15,959.8 | — | 34.7% | $57.00 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $1.49M | $0 | — | 10,922.0 | 11,353.5 | 32.6% | $0.50 | View |
| Supernode BESS | SNB02 |
QLD1 | Storage - Battery | $1.46M | $11.9k | 7,380.8 | -3,623.0 | 164,274.1 | -1.9% | $1.50 | View |
| Uranquinty | URANQ12 |
NSW1 | Turbine - OCGT | $1.45M | $0 | — | 3,040.4 | 58,634.9 | 2.4% | $128.50 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $1.44M | $0 | — | 9,489.7 | 9,410.3 | 27.3% | $0.50 | View |
| Woolooga Solar Farm | WOOLGSF1 |
QLD1 | Solar PV - Single axis tracking | $1.38M | $0 | — | 22,801.6 | 26,315.0 | 14.2% | $0.25 | View |
| Edenvale Solar Park | EDENVSF1 |
QLD1 | Solar PV - Single axis tracking | $1.37M | $0 | — | 26,975.9 | 26,173.1 | 20.8% | $0.00 | View |
| Golden Plains Wind Farm West | GPWFWST1 |
VIC1 | Wind Turbine - Onshore | $1.35M | $0 | — | 33,527.8 | 54,699.0 | 8.4% | $0.53 | View |
| Walla Walla Solar Farm | WLWLSF1 |
NSW1 | Solar PV - Single axis tracking | $1.35M | $0 | — | 13,946.9 | 34,035.5 | 12.7% | $0.25 | View |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $1.35M | $0 | — | 33,445.7 | — | 24.2% | $0.50 | View |
| Walla Walla Solar Farm | WLWLSF2 |
NSW1 | Solar PV - Single axis tracking | $1.35M | $0 | — | 13,988.9 | 34,951.8 | 12.8% | $0.25 | View |
| Templers B BESS | TEMPB1 |
SA1 | Storage - Battery | $1.33M | $0 | — | -1,484.2 | 54,128.8 | -1.9% | $1.50 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $1.33M | $0 | — | 21,976.9 | 51,450.1 | 11.7% | $0.50 | View |
| Waratah Super Battery | WTAHB1 |
NSW1 | Storage - Battery | $1.32M | $0 | — | -8,469.1 | 431,446.6 | -1.4% | $1.50 | View |
| Metz Solar Farm | METZSF1 |
NSW1 | Solar PV - Single axis tracking | $1.32M | $0 | — | 18,556.8 | 18,457.8 | 19.1% | $0.25 | View |
| Condong | CONDONG1 |
NSW1 | Turbine - Steam Sub Critical | $1.31M | $0 | — | 10,762.0 | — | 49.8% | $112.12 | View |
| Hillston Sun Farm | HILLSTN1 |
NSW1 | Solar PV - Single axis tracking | $1.29M | $0 | — | 17,047.9 | 18,602.4 | 21.5% | $0.00 | View |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $1.29M | $0 | — | 20,048.9 | 26,870.7 | 28.2% | $0.50 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $1.29M | $0 | — | 31,817.2 | 32,444.8 | 35.1% | $0.74 | View |
| Blyth BESS | BLYTHB1 |
SA1 | Storage - Battery | $1.28M | $50.2k | 44,137.7 | -4,767.8 | 128,848.7 | -3.3% | $4.86 | View |
| New England Solar Farm BESS | NESBESS1 |
NSW1 | Storage - Battery | $1.26M | $0 | — | -1,218.5 | 26,105.2 | -0.8% | $1.50 | View |
| Kareeya | KAREEYA3 |
QLD1 | Hydro - Run of River | $1.25M | $1.6k | 1,370.4 | 13,666.6 | 15,654.5 | 87.9% | $1.05 | View |
| Sebastopol Solar Farm | SEBSF1 |
NSW1 | Solar PV - Single axis tracking | $1.23M | $0 | — | 12,072.4 | 21,800.8 | 18.6% | $0.25 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $1.21M | $0 | — | 18,744.5 | 23,464.1 | 30.1% | $0.50 | View |
| Nevertire Solar Farm | NEVERSF1 |
NSW1 | Solar PV - Single axis tracking | $1.21M | $0 | — | 17,184.2 | 18,406.4 | 22.8% | $0.25 | View |
| Bogong / Mackay | MCKAY1 |
VIC1 | Hydro - Dam | $1.20M | $0 | — | 11,498.0 | 99,372.1 | 5.3% | $1.00 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $1.19M | $0 | — | 27,018.2 | 26,502.7 | 35.2% | $0.00 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $1.17M | $0 | — | 43,274.8 | 48,649.1 | 24.2% | $0.50 | View |
| Barron Gorge | BARRON-1 |
QLD1 | Hydro - Run of River | $1.15M | $0 | — | 10,322.3 | 14,217.4 | 41.0% | $0.00 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $1.14M | $0 | — | 31,002.3 | 31,509.2 | 29.9% | $0.50 | View |
| Kareeya | KAREEYA4 |
QLD1 | Hydro - Run of River | $1.13M | $1.5k | 1,309.6 | 12,018.3 | 14,136.5 | 77.3% | $1.66 | View |
| Barron Gorge | BARRON-2 |
QLD1 | Hydro - Run of River | $1.10M | $0 | — | 9,837.1 | 14,377.8 | 39.0% | $0.00 | View |
| Goorambat East Solar Farm (ENGIE) | GOESF1 |
VIC1 | Solar PV - Single axis tracking | $1.09M | $0 | — | 57,454.0 | 64,151.0 | 31.9% | $0.25 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $1.09M | $0 | — | 22,824.8 | 36,566.3 | 18.9% | $0.66 | View |
| Mornington BESS | MRNBESS1 |
VIC1 | Storage - Battery | $1.08M | $0 | — | -2,652.2 | 103,459.9 | -1.5% | $1.50 | View |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $1.08M | $0 | — | 24,873.8 | — | 22.8% | $0.50 | View |
| Wandoan South Solar Stage 2 | WANDSF2 |
QLD1 | Solar PV - Single axis tracking | $1.07M | $0 | — | 13,821.7 | 16,356.0 | 6.0% | $0.25 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $1.07M | $0 | — | 18,098.3 | 23,890.7 | 19.0% | $0.80 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $1.05M | $0 | — | 35,521.0 | 36,794.8 | 24.1% | $0.00 | View |
| Somerton | AGLSOM |
VIC1 | Turbine - OCGT | $1.05M | $0 | — | 8,869.4 | 63,562.7 | 7.2% | $128.50 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $1.03M | $0 | — | 11,326.3 | 12,129.3 | 27.3% | $0.76 | View |
| Wandoan South Solar Stage 1 | WANDSF1 |
QLD1 | Solar PV - Single axis tracking | $1.03M | $0 | — | 15,222.0 | 18,588.3 | 13.2% | $0.25 | View |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $1.02M | $0 | — | 25,063.1 | 26,775.2 | 26.6% | $0.50 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $1.00M | $0 | — | 35,180.4 | 36,611.5 | 31.0% | $0.50 | View |
| Guthega | GUTHEGA |
NSW1 | Hydro - Dam | $998.1k | $0 | — | 8,778.3 | 40,060.5 | 20.3% | $1.05 | View |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $994.5k | $0 | — | 20,240.7 | 28,839.1 | 17.7% | $0.86 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $981.6k | $0 | — | 20,465.2 | 28,498.6 | 29.4% | $0.00 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $975.0k | $0 | — | 26,707.0 | 27,606.8 | 26.8% | $0.50 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $969.7k | $0 | — | 23,263.6 | 24,706.0 | 27.0% | $0.50 | View |
| West Wyalong Solar Farm | WSTWYSF1 |
NSW1 | Solar PV - Single axis tracking | $964.3k | $0 | — | 9,721.0 | 14,617.7 | 12.8% | $0.25 | View |
| Trevallyn | TREVALLN |
TAS1 | Hydro - Dam | $963.9k | $10.9k | 436.1 | 11,694.4 | 67,316.1 | 17.5% | $1.00 | View |
| Nyngan Solar Plant | NYNGAN1 |
NSW1 | Solar PV - Fixed | $959.1k | $0 | — | 12,936.0 | 14,095.9 | 17.6% | $0.20 | View |
| Bomen Solar Farm | BOMENSF1 |
NSW1 | Solar PV - Single axis tracking | $958.9k | $0 | — | 11,778.9 | 19,022.2 | 13.5% | $0.25 | View |
| Beryl Solar Farm | BERYLSF1 |
NSW1 | Solar PV - Single axis tracking | $951.8k | $0 | — | 14,058.3 | 13,714.2 | 19.8% | $0.25 | View |
| Daydream Solar Farm | DAYDSF1 |
QLD1 | Solar PV - Single axis tracking | $901.4k | $0 | — | 20,300.6 | 23,550.8 | 16.8% | $0.00 | View |
| Swanbank BESS | SWANBBF1 |
QLD1 | Storage - Battery | $898.0k | $0 | — | -2,388.0 | 115,761.2 | -1.3% | $1.50 | View |
| Munna Creek Solar Farm | MUCRKSF1 |
QLD1 | Solar PV - Single axis tracking | $897.3k | $0 | — | 18,428.6 | 18,752.5 | 16.6% | $0.25 | View |
| Kareeya | KAREEYA2 |
QLD1 | Hydro - Run of River | $897.3k | $1.3k | 1,178.4 | 10,523.0 | 12,417.2 | 67.7% | $1.00 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $880.8k | $0 | — | 36,160.6 | 36,708.3 | 20.9% | $0.00 | View |
| Gangarri Solar Farm | GANGARR1 |
QLD1 | Solar PV - Single axis tracking | $880.3k | $0 | — | 16,364.4 | 16,595.8 | 14.0% | $0.26 | View |
| Victorian Big Battery | VBB1 |
VIC1 | Storage - Battery | $876.2k | $8.8k | 6,322.5 | -2,772.1 | 119,155.4 | -1.3% | $1.50 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $873.9k | $0 | — | 8,824.0 | 10,742.7 | 28.4% | $0.68 | View |
| Gunsynd Solar Farm | GUSF1 |
QLD1 | Solar PV - Fixed | $873.8k | $0 | — | 15,798.4 | 16,178.6 | 23.3% | $0.00 | View |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $872.5k | $0 | — | 40,917.9 | 41,222.6 | 31.5% | $0.50 | View |
| Liddell BESS | LDBESS1 |
NSW1 | Storage - Battery | $872.1k | $18.7k | 33,483.3 | -5,650.1 | 220,306.4 | -1.6% | $1.50 | View |
| Rangebank BESS | RANGEB1 |
VIC1 | Storage - Battery | $868.3k | $86 | 23.4 | -1,750.3 | 105,689.9 | -1.2% | $1.50 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $856.2k | $0 | 0.4 | 26,883.6 | 26,810.2 | 36.5% | $0.69 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $849.6k | $0 | — | 26,357.1 | 26,278.7 | 35.7% | $0.50 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $845.9k | $0 | — | 6,516.3 | — | 30.2% | $0.68 | View |
| Clare Solar Farm | CLARESF1 |
QLD1 | Solar PV - Single axis tracking | $841.3k | $0 | — | 15,995.5 | 21,195.8 | 20.1% | $0.00 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $839.3k | $0 | — | 27,921.5 | 27,842.9 | 34.6% | $0.68 | View |
| Jemalong Solar | JEMALNG1 |
NSW1 | Solar PV - Single axis tracking | $827.0k | $0 | — | 8,880.4 | 11,329.5 | 22.4% | $0.32 | View |
| Yarranlea Solar Farm | YARANSF1 |
QLD1 | Solar PV - Single axis tracking | $821.9k | $0 | — | 12,881.3 | 14,496.5 | 14.8% | $0.25 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $812.0k | $0 | — | 14,324.9 | 19,908.8 | 21.1% | $0.71 | View |
| Mannum BESS | MANNUMB1 |
SA1 | Storage - Battery | $804.6k | $21.6k | 10,414.0 | -2,118.4 | 66,896.0 | -2.9% | $1.50 | View |
| Torrens Island BESS | TIB1 |
SA1 | Storage - Battery | $788.3k | $28.1k | 112,488.7 | -3,218.0 | 93,892.9 | -1.8% | $1.50 | View |
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $786.9k | $0 | — | 19,623.2 | 25,194.1 | 13.6% | $0.50 | View |
| Lilyvale Solar Farm | LILYSF1 |
QLD1 | Solar PV - Single axis tracking | $771.7k | $0 | — | 11,545.3 | 14,746.1 | 13.5% | $0.25 | View |
| Sun Metals Corporation Solar Farm | SMCSF1 |
QLD1 | Solar PV - Fixed | $745.3k | $0 | — | 14,890.5 | 21,083.5 | 14.5% | $0.00 | View |
| Finley Solar Farm | FINLYSF1 |
NSW1 | Solar PV - Single axis tracking | $735.5k | $0 | — | 11,137.6 | 12,912.6 | 9.5% | $0.25 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $728.2k | $0 | — | 12,645.8 | 17,537.6 | 24.6% | $0.00 | View |
| Tarong BESS - Stanwell | TARBESS1 |
QLD1 | Storage - Battery | $728.1k | $15.7k | 84,974.6 | -1,847.4 | 96,155.0 | -0.9% | $1.50 | View |
| Haughton Solar Farm Stage 1 | HAUGHT11 |
QLD1 | Solar PV - Single axis tracking | $725.5k | $0 | — | 15,632.3 | 21,959.1 | 16.4% | $0.00 | View |
| West Kiewa | WKIEWA1 |
VIC1 | Hydro - Dam | $722.9k | $0 | — | 7,907.1 | 31,318.2 | 32.3% | $10.00 | View |
| Ross River Solar Farm | RRSF1 |
QLD1 | Solar PV - Single axis tracking | $720.9k | $0 | — | 16,281.0 | 22,075.6 | 17.7% | $0.25 | View |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $720.5k | $0 | — | 19,065.9 | 24,202.6 | 18.3% | $0.50 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $713.0k | $0 | — | 23,488.0 | 25,379.0 | 26.8% | $0.53 | View |
| Koorangie Energy Storage System | KESSB1 |
VIC1 | Storage - Battery | $709.6k | $0 | — | -1,342.7 | 85,636.4 | -1.0% | $1.50 | View |
| Western Downs Battery - Stage 1 And 2 | WDBESS1 |
QLD1 | Storage - Battery | $706.1k | $27.2k | 14,815.6 | -2,730.7 | 154,438.1 | -1.5% | $1.58 | View |
| Limondale BESS | LIMBESS1 |
NSW1 | Storage - Battery | $701.0k | $3.9k | 907.8 | -1,251.1 | 34,860.9 | -3.5% | $1.50 | View |
| Moura Solar Farm | MOUSF1 |
QLD1 | Solar PV - Single axis tracking | $698.2k | $0 | — | 14,078.9 | 14,383.6 | 19.8% | $0.25 | View |
| Meadowbank | MEADOWBK |
TAS1 | Hydro - Dam | $684.5k | $22.7k | 632.1 | 9,183.1 | 29,094.0 | 31.9% | $1.00 | View |
| Darling Downs Solar Farm | DDSF1 |
QLD1 | Solar PV - Fixed | $679.4k | $0 | — | 14,125.9 | 13,916.0 | 16.2% | $0.28 | View |
| Clermont Solar Farm | CLERMSF1 |
QLD1 | Solar PV - Single axis tracking | $664.0k | $0 | — | 11,679.4 | 12,844.4 | 17.5% | $0.34 | View |
| New England Solar Farm BESS | NESBESS2 |
NSW1 | Storage - Battery | $662.9k | $0 | — | -800.8 | 18,660.1 | -0.6% | $1.50 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $650.5k | $0 | — | 15,485.7 | 20,190.3 | 26.9% | $0.68 | View |
| Clements Gap - BESS | CGBESS01 |
SA1 | Storage - Battery | $647.4k | $0 | — | -876.8 | 35,001.2 | -2.0% | $1.58 | View |
| Tribute | TRIBUTE |
TAS1 | Hydro - Dam | $646.6k | $2.3k | 1,068.8 | 6,240.2 | 14,366.6 | 10.5% | $1.00 | View |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $643.1k | $0 | — | 17,719.6 | 25,880.5 | 18.8% | $0.50 | View |
| German Creek | GERMCRK |
QLD1 | Reciprocating Engine - Spark ignition | $642.2k | $0 | — | 7,284.0 | — | 22.5% | $122.81 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $634.9k | $0 | — | 11,912.3 | 16,367.8 | 18.2% | $0.50 | View |
| Eildon | EILDON2 |
VIC1 | Hydro - Dam | $622.4k | $0 | — | 8,256.0 | 35,225.0 | 17.0% | $1.00 | View |
| Kiamal Solar Farm - Stage 1 | KIAMSF1 |
VIC1 | Solar PV - Single axis tracking | $620.2k | $0 | — | 37,984.8 | 43,571.1 | 26.4% | $0.00 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $619.9k | $0 | — | 11,782.4 | 12,513.2 | 28.9% | $0.80 | View |
| Colongra | CG1 |
NSW1 | Turbine - OCGT | $616.1k | $0 | — | 833.6 | 120,276.3 | 0.6% | $197.00 | View |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $613.2k | $0 | — | 21,219.1 | 24,061.8 | 27.0% | $0.65 | View |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $610.5k | $0 | — | 9,592.6 | 14,252.1 | 21.5% | $0.53 | View |
| Wyalong Solar Farm | WYASF1 |
NSW1 | Solar PV - Single axis tracking | $606.2k | $0 | — | 6,134.3 | 10,572.5 | 13.7% | $0.25 | View |
| Devils Gate | DEVILS_G |
TAS1 | Hydro - Dam | $603.2k | $48.4k | 5,225.5 | 5,764.7 | 45,221.3 | 13.3% | $1.00 | View |
| Quorn Park Solar Hybrid | QPSFB1 |
NSW1 | Solar PV - Single axis tracking | $595.5k | $0 | — | 7,754.9 | 15,508.4 | 11.1% | $0.26 | View |
| Braemar 2 Power Station | BRAEMAR6 |
QLD1 | Turbine - OCGT | $594.7k | $0 | — | 3,182.8 | 77,108.4 | 2.6% | $133.36 | View |
| Tamar Valley Peaking | TVPP104 |
TAS1 | Turbine - OCGT | $592.8k | $0 | — | 5,553.9 | 22,987.6 | 13.3% | $128.50 | View |
| Rugby Run Solar Farm | RUGBYR1 |
QLD1 | Solar PV - Single axis tracking | $591.1k | $0 | — | 10,930.0 | 12,161.0 | 23.4% | $0.25 | View |
| Bluegrass Solar Farm | BLUEGSF1 |
QLD1 | Solar PV - Single axis tracking | $588.3k | $0 | — | 13,887.2 | 13,275.7 | 13.0% | $0.29 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $578.5k | $0 | — | 10,113.7 | 13,786.9 | 19.4% | $0.50 | View |
| Bundaberg Solar Farm | BUSF1 |
QLD1 | Solar PV - Single axis tracking | $577.6k | $0 | — | 11,280.8 | 11,294.2 | 20.1% | $14.55 | View |
| Repulse | REPULSE |
TAS1 | Hydro - Dam | $577.0k | $0 | — | 7,306.7 | — | 36.2% | $1.00 | View |
| Moree Solar Farm | MOREESF1 |
NSW1 | Solar PV - Single axis tracking | $576.1k | $0 | — | 7,661.7 | 7,978.2 | 19.0% | $0.25 | View |
| Yarwun 1 | YARWUN_1 |
QLD1 | Turbine - CCGT | $575.9k | $0 | — | 5,947.9 | 23,057.2 | 4.6% | $84.30 | View |
| Fisher | FISHER |
TAS1 | Hydro - Dam | $572.5k | $27.2k | 5,572.8 | 6,819.3 | 31,823.6 | 21.9% | $1.05 | View |
| Eildon | EILDON1 |
VIC1 | Hydro - Dam | $557.0k | $0 | — | 6,091.4 | 35,929.5 | 12.5% | $1.05 | View |
| Limondale Solar Farm 2 | LIMOSF21 |
NSW1 | Solar PV - Single axis tracking | $547.8k | $0 | — | 5,840.6 | 6,233.4 | 28.0% | $0.25 | View |
| Greenbank BESS | GREENB1 |
QLD1 | Storage - Battery | $537.2k | $36.1k | 49,819.5 | -2,175.4 | 101,304.7 | -1.5% | $1.54 | View |
| Swanbank E GT | SWAN_E |
QLD1 | Turbine - CCGT | $535.2k | $0 | — | 4,024.6 | 4,491.7 | 1.5% | $2.00 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $525.5k | $0 | — | 9,123.5 | 10,831.3 | 22.0% | $0.53 | View |
| Glenrowan West Solar Farm | GLRWNSF1 |
VIC1 | Solar PV - Single axis tracking | $524.0k | $0 | — | 13,882.2 | 26,257.2 | 14.6% | $0.32 | View |
| Numurkah Solar Farm | NUMURSF1 |
VIC1 | Solar PV - Single axis tracking | $513.2k | $0 | — | 14,865.5 | 21,890.1 | 20.4% | $0.25 | View |
| Broken Hill Solar Plant | BROKENH1 |
NSW1 | Solar PV - Fixed | $513.0k | $0 | — | 8,212.8 | 9,087.7 | 21.5% | $0.28 | View |
| Supernode BESS | SNB01 |
QLD1 | Storage - Battery | $510.7k | $17.0k | 17,249.8 | -2,332.3 | 163,094.8 | -1.2% | $1.50 | View |
| Goonumbla Solar Farm | GOONSF1 |
NSW1 | Solar PV - Single axis tracking | $483.9k | $0 | — | 6,157.5 | 11,810.5 | 12.3% | $0.25 | View |
| Colongra | CG2 |
NSW1 | Turbine - OCGT | $481.2k | $0 | — | 1,317.6 | 121,622.9 | 1.0% | $135.55 | View |
| Griffith Solar Farm | GRIFSF1 |
NSW1 | Solar PV - Single axis tracking | $475.0k | $0 | — | 5,466.5 | — | 27.9% | $0.35 | View |
| Condamine A | CPSA |
QLD1 | Turbine - CCGT | $473.0k | $0 | — | 2,719.1 | 3,328.2 | 4.3% | $95.40 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $471.2k | $0 | — | 13,073.1 | 17,384.7 | 21.7% | $0.53 | View |
| Hornsdale Power Reserve Unit 1 | HPR1 |
SA1 | Storage - Battery | $469.8k | $6.9k | 4,161.1 | -1,512.9 | 42,760.5 | -1.4% | $1.50 | View |
| LaTrobe Valley BESS | LVES1 |
VIC1 | Storage - Battery | $467.5k | $7.9k | 162,545.1 | -1,365.8 | 61,718.2 | -1.9% | $1.54 | View |
| Corowa Solar Farm | CRWASF1 |
NSW1 | Solar PV - Single axis tracking | $458.0k | $0 | — | 5,118.8 | 7,267.5 | 19.7% | $0.33 | View |
| Shoalhaven | SHGEN |
NSW1 | Storage - Pumped hydro | $455.3k | $0 | — | 4,106.7 | 23,527.5 | 2.3% | $1.20 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $447.1k | $0 | — | 7,453.2 | 13,858.5 | 19.2% | $0.50 | View |
| Susan River Solar Farm | SRSF1 |
QLD1 | Solar PV - Single axis tracking | $438.1k | $0 | — | 8,675.3 | 8,946.0 | 14.1% | $0.25 | View |
| Wagga North Solar Farm | WAGGNSF1 |
NSW1 | Solar PV - Single axis tracking | $433.6k | $0 | — | 5,379.0 | 10,121.1 | 13.4% | $0.25 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $429.8k | $0 | — | 9,171.0 | 12,886.8 | 15.8% | $0.79 | View |
| Terang BESS | TRGBESS1 |
VIC1 | Storage - Battery | $427.5k | $35.4k | 14,099.0 | -4,550.5 | 62,873.4 | -6.3% | $1.50 | View |
| Oakey 2 Solar Farm | OAKEY2SF |
QLD1 | Solar PV - Single axis tracking | $427.1k | $0 | — | 7,754.0 | 8,159.3 | 19.4% | $0.25 | View |
| Colongra | CG4 |
NSW1 | Turbine - OCGT | $400.5k | $0 | — | 390.7 | 120,596.2 | 0.3% | $194.33 | View |
| Kiata Wind Farm | KIATAWF1 |
VIC1 | Wind Turbine - Onshore | $395.5k | $0 | — | 8,716.7 | 10,491.5 | 39.0% | $0.68 | View |
| Wunghnu Solar Farm | WUNUSF1 |
VIC1 | Solar PV - Single axis tracking | $392.5k | $0 | — | 8,831.5 | 17,075.8 | 13.1% | $0.25 | View |
| Girgarre Solar Farm | GIRGSF |
VIC1 | Solar PV - Single axis tracking | $391.6k | $0 | — | 12,418.6 | 17,842.3 | 18.5% | $0.00 | View |
| Western Downs Gas Peaking Plant - KCI | WDBESS2 |
QLD1 | Turbine - CCGT | $390.7k | $117.6k | 50,273.7 | -5,934.4 | 159,887.6 | -2.1% | $2.00 | View |
| Oakey Power Station | OAKEY1 |
QLD1 | Turbine - OCGT | $390.5k | $0 | — | 1,815.5 | 31,128.6 | 1.5% | $128.50 | View |
| Whitsunday Solar Farm | WHITSF1 |
QLD1 | Solar PV - Single axis tracking | $385.3k | $0 | — | 7,207.3 | 9,535.4 | 17.4% | $0.25 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $382.6k | $0 | — | 6,986.7 | 9,919.2 | 18.5% | $0.77 | View |
| Glenrowan Solar Farm | GLENSF1 |
VIC1 | Solar PV - Single axis tracking | $381.7k | $0 | — | 24,706.4 | 25,328.9 | 27.2% | $0.25 | View |
| Williamsdale BESS | WILLBES1 |
NSW1 | Storage - Battery | $381.6k | $1.1k | 65,234.8 | -1,515.8 | 108,237.5 | -0.8% | $1.50 | View |
| Ladbroke Grove | LADBROK2 |
SA1 | Turbine - OCGT | $380.8k | $0 | — | 2,907.7 | 24,095.3 | 10.1% | $145.06 | View |
| Parkes Solar Farm | PARSF1 |
NSW1 | Solar PV - Single axis tracking | $375.4k | $0 | — | 4,796.4 | 9,282.6 | 13.5% | $0.25 | View |
| Brendale BESS | BRNDBES1 |
QLD1 | Storage - Battery | $374.7k | $63.4k | 17,692.1 | -4,783.7 | 133,952.0 | -3.2% | $1.58 | View |
| Junee Solar Farm | JUNEESF1 |
NSW1 | Solar PV - Single axis tracking | $371.5k | $0 | — | 3,601.7 | 6,681.7 | 13.9% | $0.00 | View |
| Oakey Power Station | OAKEY2 |
QLD1 | Turbine - OCGT | $367.5k | $0 | — | 1,747.4 | 19,050.0 | 1.4% | $128.50 | View |
| Smithfield BESS | SMTHBES1 |
NSW1 | Storage - Battery | $363.8k | $12.6k | 105,487.5 | -1,225.3 | 38,877.2 | -2.0% | $1.50 | View |
| Childers Solar Farm | CHILDSF1 |
QLD1 | Solar PV - Single axis tracking | $361.8k | $0 | — | 6,870.6 | 7,011.1 | 14.8% | $0.34 | View |
| Kingaroy Solar Farm | KINGASF1 |
QLD1 | Solar PV - Single axis tracking | $359.9k | $0 | — | 6,341.2 | 6,382.5 | 22.0% | $0.25 | View |
| Cluny | CLUNY |
TAS1 | Hydro - Dam | $350.8k | $0 | — | 4,529.9 | — | 33.1% | $1.00 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $346.3k | $0 | — | 11,575.4 | 14,214.0 | 23.9% | $0.50 | View |
| Hamilton Solar Farm | HAMISF1 |
QLD1 | Solar PV - Single axis tracking | $346.2k | $0 | — | 6,851.1 | 8,498.4 | 16.5% | $18.64 | View |
| Ladbroke Grove | LADBROK1 |
SA1 | Turbine - OCGT | $340.1k | $0 | — | 2,537.0 | 24,316.5 | 8.8% | $153.02 | View |
| Broadsound Solar Farm | BRDDBES1 |
QLD1 | Solar PV - Single axis tracking | $335.2k | $35.3k | 15,360.4 | -2,925.0 | 111,182.6 | -1.1% | $0.27 | View |
| Riverina Energy Storage System 1 | RESS1 |
NSW1 | Storage - Battery | $333.7k | $322 | 124.3 | -493.4 | 32,970.2 | -1.1% | $1.50 | View |
| Lemonthyme / Wilmot | LEM_WIL |
TAS1 | Hydro - Dam | $333.2k | $6.5k | 2,244.8 | 3,558.6 | 22,048.9 | 6.1% | $1.00 | View |
| Mulwala Solar Farm | MULWASF1 |
NSW1 | Solar PV - Single axis tracking | $325.9k | $0 | — | 3,926.1 | 5,208.0 | 17.6% | $0.25 | View |
| Lancaster Solar Farm | LANCSF1 |
VIC1 | Solar PV - Single axis tracking | $324.4k | $0 | — | 9,037.8 | 14,802.7 | 11.8% | $0.25 | View |
| Hayman Solar Farm | HAYMSF1 |
QLD1 | Solar PV - Single axis tracking | $312.2k | $0 | — | 6,772.5 | 9,406.0 | 16.3% | $0.34 | View |
| Rocky Point Sugar Mill Cogeneration Plant | RPCG |
QLD1 | Other - Other | $303.2k | $0 | — | 3,153.4 | — | 14.6% | $117.00 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $296.5k | $0 | — | 5,641.7 | 8,910.9 | 17.0% | $0.50 | View |
| Braemar | BRAEMAR2 |
QLD1 | Turbine - OCGT | $288.9k | $0 | — | 1,593.9 | 127,591.2 | 1.2% | $130.94 | View |
| Butlers Gorge | BUTLERSG |
TAS1 | Hydro - Dam | $281.5k | $0 | — | 4,499.6 | — | 51.2% | $1.00 | View |
| Karadoc Solar Farm | KARSF1 |
VIC1 | Solar PV - Single axis tracking | $279.4k | $0 | — | 16,951.9 | 20,738.8 | 22.5% | $0.00 | View |
| Bungala Two Solar Farm | BNGSF2 |
SA1 | Solar PV - Single axis tracking | $267.9k | $0 | — | 10,410.1 | 25,645.8 | 10.7% | $0.33 | View |
| Quarantine | QPS5 |
SA1 | Turbine - OCGT | $267.3k | $0 | — | 1,824.0 | 85,687.2 | 2.0% | $209.05 | View |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $253.5k | $0 | — | 7,990.0 | 9,330.6 | 24.0% | $0.66 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $251.9k | $0 | — | 5,715.7 | 5,709.8 | 24.1% | $0.50 | View |
| Wallgrove Grid Battery project | WALGRV1 |
NSW1 | Storage - Battery | $246.4k | $2.4k | 74,792.6 | -395.0 | 23,492.8 | -1.1% | $1.50 | View |
| Wemen Solar Farm | WEMENSF1 |
VIC1 | Solar PV - Single axis tracking | $244.2k | $0 | — | 15,376.9 | 20,741.3 | 21.9% | $0.25 | View |
| Collinsville PV | CSPVPS1 |
QLD1 | Solar PV - Fixed | $242.3k | $0 | — | 5,097.1 | 6,347.1 | 16.7% | $0.28 | View |
| Newport | NPS |
VIC1 | Turbine - Steam Sub Critical | $238.6k | $0 | — | 1,819.2 | 2,540.0 | 0.5% | $2.00 | View |
| Yatpool Solar Farm | YATSF1 |
VIC1 | Solar PV - Single axis tracking | $234.1k | $0 | — | 10,261.9 | 12,093.6 | 15.2% | $0.25 | View |
| Clover | CLOVER |
VIC1 | Hydro - Dam | $231.9k | $0 | — | 2,420.6 | — | 11.6% | $1.17 | View |
| Mortlake | MORTLK12 |
VIC1 | Turbine - OCGT | $230.0k | $0 | — | 1,699.6 | 157,313.1 | 0.8% | $128.50 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $228.3k | $0 | — | 5,324.2 | — | 24.6% | $0.50 | View |
| Mokoan Solar Farm (LightsourceBP) | MOKOSF1 |
VIC1 | Solar PV - Single axis tracking | $223.9k | $0 | — | 6,449.5 | 11,021.0 | 19.5% | $0.25 | View |
| Tailem Bend Stage 2 Solar Project | TB2SF1 |
SA1 | Solar PV - Single axis tracking | $220.3k | $0 | — | 6,646.3 | 18,444.2 | 8.8% | $0.25 | View |
| Hazelwood Battery Energy Storage System (HBESS) | HBESS1 |
VIC1 | Storage - Battery | $219.5k | $16.2k | 7,620.7 | -3,696.0 | 80,314.7 | -2.6% | $1.87 | View |
| Braemar | BRAEMAR3 |
QLD1 | Turbine - OCGT | $218.8k | $0 | — | 4,226.4 | 4,087.8 | 3.1% | $128.50 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $218.6k | $0 | — | 5,884.3 | — | 15.6% | $0.53 | View |
| Maryrorough Solar Farm | MARYRSF1 |
QLD1 | Solar PV - Single axis tracking | $218.0k | $0 | — | 4,008.6 | 4,276.6 | 16.1% | $0.25 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $216.9k | $0 | — | 4,555.2 | 6,205.2 | 16.2% | $0.53 | View |
| Manildra Solar Farm | MANSLR1 |
NSW1 | Solar PV - Single axis tracking | $213.3k | $0 | — | 2,451.6 | 7,726.1 | 6.8% | $0.25 | View |
| Capital Battery | CAPBES1 |
NSW1 | Storage - Battery | $211.7k | $83 | 121.4 | -758.5 | 64,382.4 | -1.1% | $1.50 | View |
| Warwick Solar Farm | WARWSF1 |
QLD1 | Solar PV - Single axis tracking | $211.6k | $0 | — | 3,196.5 | 3,637.0 | 13.8% | $0.25 | View |
| Dartmouth | DARTM1 |
VIC1 | Hydro - Dam | $209.0k | $0 | — | 1,751.2 | 103,476.8 | 1.3% | $0.00 | View |
| Chinchilla BESS | CHBESS1 |
QLD1 | Storage - Battery | $207.1k | $17.3k | 23,243.0 | -1,073.1 | 45,340.2 | -1.5% | $1.75 | View |
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $206.2k | $0 | — | 1,200.5 | 1,200.5 | 0.7% | $0.50 | View |
| Wandoan South BESS | WANDB1 |
QLD1 | Storage - Battery | $203.8k | $23.6k | 170,831.9 | -762.5 | 31,939.7 | -1.1% | $1.50 | View |
| Oakey Solar Farm | OAKEY1SF |
QLD1 | Solar PV - Fixed | $202.1k | $0 | — | 3,669.3 | 3,891.6 | 20.4% | $0.20 | View |
| Winton Solar Farm | WINTSF1 |
VIC1 | Solar PV - Single axis tracking | $198.7k | $0 | — | 15,969.7 | 18,095.0 | 26.1% | $0.25 | View |
| Ulinda Park BESS | ULPBESS1 |
QLD1 | Storage - Battery | $196.3k | $18.1k | 8,447.0 | -4,197.5 | 93,218.1 | -3.8% | $1.50 | View |
| Middlemount Solar Farm | MIDDLSF1 |
QLD1 | Solar PV - Single axis tracking | $193.7k | $0 | — | 3,690.4 | 4,428.7 | 19.7% | $0.25 | View |
| Bannerton Solar Park | BANN1 |
VIC1 | Solar PV - Single axis tracking | $193.6k | $0 | — | 14,454.3 | 18,909.2 | 20.1% | $0.34 | View |
| Molong Solar Farm | MOLNGSF1 |
NSW1 | Solar PV - Single axis tracking | $191.2k | $0 | — | 2,407.3 | 5,440.0 | 9.3% | $0.25 | View |
| Tallawarra B | TALWB1 |
NSW1 | Turbine - OCGT | $190.1k | $0 | — | 817.4 | 223,623.7 | 0.4% | $128.50 | View |
| Royalla Solar Farm | ROYALLA1 |
NSW1 | Solar PV - Fixed | $184.3k | $0 | — | 1,753.7 | — | 12.2% | $0.20 | View |
| Kidston Solar Project Phase One 50MW | KSP1 |
QLD1 | Solar PV - Fixed | $182.7k | $0 | — | 4,530.8 | 8,465.7 | 12.6% | $0.20 | View |
| Bungala One Solar Farm | BNGSF1 |
SA1 | Solar PV - Single axis tracking | $166.7k | $0 | — | 6,404.6 | 13,125.9 | 6.6% | $0.34 | View |
| Quorn Park Solar Hybrid | QPSFB2 |
NSW1 | Storage - Battery | $161.8k | $0 | — | 545.0 | 5,391.7 | 2.7% | $1.58 | View |
| Hunter Power Station | HUNTER1 |
NSW1 | Turbine - OCGT | $158.8k | $0 | — | 1,484.5 | 1,589.6 | 0.5% | $142.99 | View |
| Barcaldine Remote Community Solar Farm | BARCSF1 |
QLD1 | Solar PV - Single axis tracking | $157.3k | $0 | — | 2,462.1 | — | 17.1% | $0.00 | View |
| Warwick Solar Farm | WARWSF2 |
QLD1 | Solar PV - Single axis tracking | $156.9k | $0 | — | 2,393.5 | 3,040.8 | 10.4% | $0.25 | View |
| Lake Bonney Battery Energy Storage | LBB1 |
SA1 | Storage - Battery | $154.7k | $2.4k | 37,882.9 | -179.4 | 12,477.3 | -1.0% | $1.98 | View |
| Longreach Solar Farm | LRSF1 |
QLD1 | Solar PV - Fixed | $153.3k | $0 | — | 2,492.0 | — | 23.1% | $0.20 | View |
| Kerang Hybrid | KERNGSP1 |
VIC1 | Solar PV - Single axis tracking | $144.5k | $0 | — | 2,649.0 | 6,775.2 | 2.3% | $0.26 | View |
| Bairnsdale | BDL01 |
VIC1 | Turbine - OCGT | $144.1k | $0 | — | 949.2 | 28,886.8 | 2.8% | $142.10 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $140.4k | $0 | — | 3,337.2 | — | 16.1% | $0.50 | View |
| Emerald Solar Park | EMERASF1 |
QLD1 | Solar PV - Single axis tracking | $140.2k | $0 | — | 4,958.1 | 10,981.2 | 9.6% | $0.25 | View |
| Tailem Bend - Solar | TBSF1 |
SA1 | Solar PV - Fixed | $138.8k | $0 | — | 6,262.6 | 18,275.0 | 8.1% | $0.20 | View |
| Tailem Bend Battery Project | TB2B1 |
SA1 | Storage - Battery | $137.1k | $13.2k | 21,903.5 | -1,091.6 | 25,292.8 | -3.7% | $1.50 | View |
| Gullen Range Solar Farm | GULLRSF1 |
NSW1 | Solar PV - Fixed | $134.4k | $0 | — | 1,943.3 | 2,027.5 | 27.0% | $0.27 | View |
| Bolivar Power Station | BOLIVPS1 |
SA1 | Turbine - OCGT | $132.1k | $0 | — | 706.0 | 932.2 | 0.8% | $151.37 | View |
| Rubicon Mountain Streams | RUBICON |
VIC1 | Hydro - Dam | $120.0k | $0 | — | 2,042.9 | — | 21.0% | $1.00 | View |
| Gannawarra Solar Farm | GANNSF1 |
VIC1 | Solar PV - Single axis tracking | $110.7k | $0 | — | 10,567.5 | 10,790.8 | 26.7% | $0.34 | View |
| Cohuna Solar Farm | COHUNSF1 |
VIC1 | Solar PV - Single axis tracking | $106.7k | $0 | — | 2,432.8 | 3,950.1 | 10.8% | $0.33 | View |
| White Rock Solar Farm | WRSF1 |
NSW1 | Solar PV - Fixed | $106.2k | $0 | — | 1,968.0 | 1,967.7 | 13.7% | $0.20 | View |
| Riverina Energy Storage System 2 | RIVNB2 |
NSW1 | Storage - Battery | $103.4k | $0 | — | -581.8 | 19,866.8 | -1.2% | $1.50 | View |
| Tully Sugar Mill | TULLYSM1 |
QLD1 | Turbine - Steam Super Critical | $102.9k | $0 | — | 939.1 | — | 4.1% | $117.00 | View |
| Bouldercombe Battery project | BBATTERY1 |
QLD1 | Storage - Battery | $101.7k | $2.8k | 11,796.4 | -586.1 | 27,671.6 | -1.6% | $1.64 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $99.2k | $0 | — | 2,723.7 | — | 47.3% | $0.00 | View |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $97.5k | $0 | — | 4,412.3 | — | 31.4% | $0.50 | View |
| Broken Hill GT | GB01 |
NSW1 | Turbine - OCGT | $95.2k | $0 | — | 959.5 | — | 2.7% | $2.11 | View |
| Hughenden Sun Farm | HUGSF1 |
QLD1 | Solar PV - Single axis tracking | $82.6k | $0 | — | 1,455.4 | — | 9.6% | $0.00 | View |
| Osborne | OSB-AG |
SA1 | Turbine - CCGT | $70.1k | $0 | — | 695.0 | 797.0 | 0.5% | $84.30 | View |
| Kennedy Energy Park - Phase 1 - Solar | KEPSF1 |
QLD1 | Solar PV - Single axis tracking | $69.5k | $0 | — | 1,201.8 | 1,798.1 | 11.1% | $0.34 | View |
| Roma | ROMA_8 |
QLD1 | Turbine - OCGT | $60.6k | $0 | — | 308.4 | 23,097.5 | 1.1% | $128.50 | View |
| Roma | ROMA_7 |
QLD1 | Turbine - OCGT | $59.5k | $0 | — | 300.2 | 23,670.1 | 1.0% | $128.50 | View |
| Gannawarra Energy Storage System | GANNB1 |
VIC1 | Storage - Battery | $57.6k | $0 | — | -60.3 | 2,630.7 | -0.3% | $1.98 | View |
| Jeeralang B | JLB03 |
VIC1 | Turbine - OCGT | $55.0k | $0 | — | 292.4 | 55,406.0 | 0.5% | $137.85 | View |
| Snapper Point Power Station | SNAPPER1 |
SA1 | Turbine - OCGT | $54.2k | $0 | — | 79.7 | 104,887.6 | 0.1% | $128.50 | View |
| Hunter EconomicZone | HEZ1 |
NSW1 | Reciprocating Engine - Compression ignition | $53.1k | $0 | — | 32.3 | 13,623.7 | 0.2% | $308.00 | View |
| Mannum Solar Farm 2 | MANNSF2 |
SA1 | Solar PV - Single axis tracking | $52.7k | $0 | — | 2,627.8 | 3,878.2 | 12.2% | $0.25 | View |
| Torrens Island B | TORRB4 |
SA1 | Turbine - Steam Sub Critical | $52.4k | $0 | — | 1,248.3 | 6,105.0 | 0.9% | $2.00 | View |
| Barcaldine Power Station | BARCALDN |
QLD1 | Turbine - OCGT | $48.7k | $0 | — | 247.4 | 274.4 | 0.9% | $141.78 | View |
| Adelaide Desalination Plant | ADPBA1 |
SA1 | Storage - Battery | $41.4k | $730 | 7,867.1 | -107.4 | 3,841.0 | -1.9% | $0.00 | View |
| Ballarat Energy Storage System | BALB1 |
VIC1 | Storage - Battery | $40.9k | $0 | — | -99.9 | 5,758.5 | -0.5% | $0.00 | View |
| Darlington Point Energy Storage System | DPNTB1 |
NSW1 | Storage - Battery | $37.2k | $0 | — | -229.5 | 6,934.0 | -1.3% | $0.00 | View |
| Adelaide Desalination Plant | ADPPV1 |
SA1 | Solar PV - Fixed | $34.2k | $0 | — | 1,218.9 | 3,678.1 | 15.4% | $0.00 | View |
| Port Augusta Renewable Energy Park - Solar | PAREPS1 |
SA1 | Solar PV - Fixed | $32.6k | $0 | — | 1,266.2 | 6,010.9 | 1.8% | $0.20 | View |
| Summerfield BESS | SMFBESS1 |
SA1 | Storage - Battery | $30.8k | $0 | — | -108.4 | 2,653.3 | -0.1% | $1.50 | View |
| Bulgana Green Power Hub - BESS | BULBES1 |
VIC1 | Storage - Battery | $30.1k | $5.1k | 2,244.2 | -670.0 | 12,063.2 | -4.7% | $1.98 | View |
| Quarantine | QPS1 |
SA1 | Turbine - OCGT | $24.0k | $0 | — | 188.2 | 20,008.5 | 0.9% | $128.50 | View |
| Hallett GT | AGLHAL |
SA1 | Turbine - OCGT | $23.4k | $0 | — | 518.3 | 127,787.3 | 0.3% | $100.22 | View |
| Quarantine | QPS3 |
SA1 | Turbine - OCGT | $22.9k | $0 | — | 181.1 | 20,312.9 | 0.9% | $128.50 | View |
| Happy Valley Reservoir | HVWWBA1 |
SA1 | Storage - Battery | $22.6k | $463 | 3,444.3 | -36.7 | 1,773.2 | -0.9% | $1.58 | View |
| Dalrymple BESS | DALNTH1 |
SA1 | Storage - Battery | $19.8k | $0 | — | -178.3 | 7,669.0 | -0.8% | $2.03 | View |
| Broken Hill | BHB1 |
NSW1 | Storage - Battery | $19.6k | $0 | — | -344.1 | 13,066.5 | -1.0% | $1.50 | View |
| Bolivar Waste Water Treatment | BOWWBA1 |
SA1 | Storage - Battery | $16.7k | $155 | 18.8 | -27.6 | 1,282.1 | -1.2% | $1.58 | View |
| Quarantine | QPS2 |
SA1 | Turbine - OCGT | $16.7k | $0 | — | 107.9 | 15,785.7 | 0.6% | $128.50 | View |
| Jeeralang A | JLA04 |
VIC1 | Turbine - OCGT | $15.9k | $0 | — | 95.5 | 29,238.8 | 0.3% | $177.20 | View |
| Jeeralang B | JLB02 |
VIC1 | Turbine - OCGT | $15.8k | $0 | — | 87.3 | 53,218.7 | 0.2% | $137.71 | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | MBPS2PV1 |
SA1 | Solar PV - Single axis tracking | $14.9k | $0 | — | 451.0 | 1,304.8 | 4.6% | $0.25 | View |
| Philip Island BESS | PIBESS1 |
VIC1 | Storage - Battery | $14.5k | $3.8k | 5,521.5 | -347.6 | 2,736.6 | -9.7% | $1.50 | View |
| Christies Beach Wastewater Treatment Plant | CBWWBA1 |
SA1 | Storage - Battery | $13.6k | $155 | 20.6 | -36.6 | 1,215.2 | -2.4% | $1.50 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | MAPS2PV1 |
SA1 | Solar PV - Single axis tracking | $12.6k | $0 | — | 966.7 | 1,682.7 | 8.1% | $0.26 | View |
| Valley Power | VPGS2 |
VIC1 | Turbine - OCGT | $10.5k | $0 | — | 126.7 | 39,041.7 | 0.4% | $128.50 | View |
| Morgan To Whyalla Pipeline No 4 PS | MWPS4PV1 |
SA1 | Solar PV - Single axis tracking | $8.7k | $0 | — | 247.8 | 651.0 | 6.3% | $0.25 | View |
| Summerfield BESS | SMFBESS2 |
SA1 | Storage - Battery | $8.0k | $0 | — | -243.6 | 467.9 | -0.1% | $1.50 | View |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | MWPS1PV1 |
SA1 | Solar PV - Single axis tracking | $7.3k | $0 | — | 233.0 | 698.5 | 5.9% | $0.25 | View |
| Bell Bay Three | BBTHREE1 |
TAS1 | Turbine - OCGT | $7.2k | $0 | — | 76.2 | 17,568.7 | 0.3% | $182.63 | View |
| Happy Valley Reservoir | HVWWPV1 |
SA1 | Solar PV - Single axis tracking | $6.6k | $0 | — | 586.8 | 1,065.0 | 7.4% | $0.00 | View |
| Morgan To Whyalla Pipeline No 3 PS | MWPS3PV1 |
SA1 | Solar PV - Single axis tracking | $6.5k | $0 | — | 220.8 | 610.0 | 4.1% | $0.25 | View |
| Bolivar Waste Water Treatment | BOWWPV1 |
SA1 | Solar PV - Fixed | $6.1k | $0 | — | 688.3 | 1,188.7 | 11.6% | $0.23 | View |
| Port Stanvac 1 | PTSTAN1 |
SA1 | Reciprocating Engine - Compression ignition | $6.1k | $0 | — | 56.0 | 39,748.2 | 0.1% | $308.00 | View |
| LINCOLN GAP BESSBDU | LGAPBS1 |
SA1 | Storage - Battery | $6.0k | $0 | — | -32.1 | 1,273.2 | -0.4% | $1.50 | View |
| Jeeralang A | JLA02 |
VIC1 | Turbine - OCGT | $6.0k | $0 | — | 38.5 | 26,401.5 | 0.1% | $128.50 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | MAPS3PV1 |
SA1 | Solar PV - Single axis tracking | $5.7k | $0 | — | 501.1 | 770.3 | 4.2% | $0.25 | View |
| Valley Power | VPGS3 |
VIC1 | Turbine - OCGT | $5.0k | $0 | — | 64.8 | 29,811.7 | 0.2% | $128.50 | View |
| Angaston | ANGAST1 |
SA1 | Reciprocating Engine - Compression ignition | $4.9k | $0 | — | 69.0 | 31,506.1 | 0.2% | $0.00 | View |
| Valley Power | VPGS4 |
VIC1 | Turbine - OCGT | $4.5k | $0 | — | 47.2 | 36,906.3 | 0.1% | $128.50 | View |
| Bell Bay Three | BBTHREE3 |
TAS1 | Turbine - OCGT | $4.1k | $0 | — | 39.7 | 15,252.8 | 0.1% | $141.97 | View |
| Morgan To Whyalla Pipeline No 2 PS | MWPS2PV1 |
SA1 | Solar PV - Single axis tracking | $3.9k | $0 | — | 143.9 | 412.1 | 3.6% | $0.25 | View |
| Dry Creek GT | DRYCGT3 |
SA1 | Turbine - OCGT | $3.8k | $0 | — | 44.2 | 33,418.2 | 0.1% | $210.15 | View |
| Bell Bay Three | BBTHREE2 |
TAS1 | Turbine - OCGT | $2.5k | $0 | — | 43.7 | 16,359.6 | 0.2% | $137.22 | View |
| Dry Creek GT | DRYCGT1 |
SA1 | Turbine - OCGT | $1.4k | $0 | — | 27.6 | 31,922.2 | 0.1% | $141.50 | View |
| Lonsdale | LONSDALE |
SA1 | Reciprocating Engine - Compression ignition | $1.3k | $0 | — | 20.8 | 11,708.8 | 0.1% | $308.00 | View |
| Jeeralang B | JLB01 |
VIC1 | Turbine - OCGT | $231 | $0 | — | 5.7 | — | 0.0% | $128.50 | View |
| Yallourn W | YWPS2 |
VIC1 | Turbine - Steam Sub Critical | $229 | $0 | — | 5.8 | — | 0.0% | $47.20 | View |
| Mt Stuart | MSTUART1 |
QLD1 | Turbine - OCGT | $74 | $0 | — | 4.4 | 98,164.0 | 0.0% | $2.00 | View |
| Braemar 2 Power Station | BRAEMAR5 |
QLD1 | Turbine - OCGT | $21 | $0 | — | 1.2 | 17,714.0 | 0.0% | $3.14 | View |
| Mintaro GT | MINTARO |
SA1 | Turbine - OCGT | $3 | $0 | — | 0.7 | 60,515.0 | 0.0% | $128.50 | View |
| VSNEL2S1 | VSNEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| Valley Power | VPGS6 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 36,905.5 | 0.0% | $128.50 | View |
| VENUS1 | VENUS1 |
$0 | $0 | 1,039.9 | — | — | — | — | View | ||
| DG_VIC1 | DG_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_SA1 | DG_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| Uungula Wind Farm | UWF1 |
NSW1 | Wind Turbine - Onshore | $0 | $0 | — | — | — | 0.0% | $0.50 | View |
| Valley Power | VPGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 39,046.6 | 0.0% | $128.50 | View |
| Valley Power | VPGS5 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 36,910.2 | 0.0% | $128.50 | View |
| DG_NSW1 | DG_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_QLD1 | DG_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_TAS1 | DG_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC12 | RT_VIC12 |
$0 | $0 | — | — | — | — | — | View | ||
| DRHTVP01 | DRHTVP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRHTVP03 | DRHTVP03 |
$0 | $0 | — | — | — | — | — | View | ||
| TB3B1 | TB3B1 |
$0 | $0 | — | -13.4 | 1,006.5 | — | — | View | ||
| DROZVP01 | DROZVP01 |
$0 | $0 | 11.1 | — | — | — | — | View | ||
| DROZVP02 | DROZVP02 |
$0 | $0 | 0.8 | — | — | — | — | View | ||
| DROZVP03 | DROZVP03 |
$0 | $0 | 33.5 | — | — | — | — | View | ||
| DRPSTQ01 | DRPSTQ01 |
$0 | $0 | 569.5 | — | — | — | — | View | ||
| Tarong | TARONG#3 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $55.48 | View |
| DRPSTV01 | DRPSTV01 |
$0 | $0 | 1,905.3 | — | — | — | — | View | ||
| DRSHVN01 | DRSHVN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVN02 | DRSHVN02 |
$0 | $0 | 34,195.8 | — | — | — | — | View | ||
| DRGBND04 | DRGBND04 |
$0 | $0 | 12,747.8 | — | — | — | — | View | ||
| DRGBND03 | DRGBND03 |
$0 | $0 | 17,596.1 | — | — | — | — | View | ||
| Torrens Island B | TORRB2 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $5.47 | View |
| DRACAN1 | DRACAN1 |
$0 | $0 | 586.2 | — | — | — | — | View | ||
| DRACAV1 | DRACAV1 |
$0 | $0 | — | — | — | — | — | View | ||
| Tamar Valley Combined Cycle | TVCC201 |
TAS1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Tungatinah | TUNGATIN |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| DRAESN3 | DRAESN3 |
$0 | $0 | 2,097.1 | — | — | — | — | View | ||
| DRAESS1 | DRAESS1 |
$0 | $0 | 1,908.6 | — | — | — | — | View | ||
| DRBRLV01 | DRBRLV01 |
$0 | $0 | 7,599.4 | — | — | — | — | View | ||
| DRFIIN01 | DRFIIN01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRFIIN02 | DRFIIN02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRGBND01 | DRGBND01 |
$0 | $0 | 3,824.7 | — | — | — | — | View | ||
| DRGBND02 | DRGBND02 |
$0 | $0 | 1,196.6 | — | — | — | — | View | ||
| DRSHVQ01 | DRSHVQ01 |
$0 | $0 | 2,513.2 | — | — | — | — | View | ||
| ASDESA1 | ASDESA1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASNAES1 | ASNAES1 |
$0 | $0 | 93.1 | — | — | — | — | View | ||
| ASNBRL1 | ASNBRL1 |
$0 | $0 | 12,648.7 | — | — | — | — | View | ||
| ASNENC1 | ASNENC1 |
$0 | $0 | 5,293.0 | — | — | — | — | View | ||
| ASPAPM01 | ASPAPM01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPBSC01 | ASPBSC01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASPSTV01 | ASPSTV01 |
$0 | $0 | 17.7 | — | — | — | — | View | ||
| ASQEEV1 | ASQEEV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASQENC1 | ASQENC1 |
$0 | $0 | 1,212.4 | — | — | — | — | View | ||
| WOOLES1 | WOOLES1 |
$0 | $0 | — | -1,025.8 | 18,835.7 | — | — | View | ||
| ASGENE01 | ASGENE01 |
$0 | $0 | — | — | — | — | — | View | ||
| Townsville Power Station | YABULU |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| DRVISB01 | DRVISB01 |
$0 | $0 | — | — | — | — | — | View | ||
| APD01 | APD01 |
$0 | $0 | 74,306.1 | — | — | — | — | View | ||
| ASACLE01 | ASACLE01 |
$0 | $0 | 4,176.8 | — | — | — | — | View | ||
| WINNSF1 | WINNSF1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASDEVI01 | ASDEVI01 |
$0 | $0 | 6,695.8 | — | — | — | — | View | ||
| ASDLBY01 | ASDLBY01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGV01 | ASENGV01 |
$0 | $0 | — | — | — | — | — | View | ||
| ASENGY01 | ASENGY01 |
$0 | $0 | — | — | — | — | — | View | ||
| Townsville Power Station | YABULU2 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| ASRMGE01 | ASRMGE01 |
$0 | $0 | 8.5 | — | — | — | — | View | ||
| ASRMGE02 | ASRMGE02 |
$0 | $0 | 8.6 | — | — | — | — | View | ||
| WNSF1 | WNSF1 |
$0 | $0 | — | 3,061.8 | — | — | — | View | ||
| WAMBOWF2 | WAMBOWF2 |
$0 | $0 | — | 26,025.1 | 25,917.4 | — | — | View | ||
| Cethana | CETHANA |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.09 | View |
| CRWARP1 | CRWARP1 |
$0 | $0 | — | 31,669.6 | 34,680.4 | — | — | View | ||
| W/HOE#2 | W/HOE#2 |
$0 | $0 | 1,506.9 | 24,313.3 | 134,110.6 | — | — | View | ||
| W/HOE#1 | W/HOE#1 |
$0 | $0 | 444.3 | 18,759.3 | 105,328.9 | — | — | View | ||
| VSVEL2S1 | VSVEL2S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSH1S1 | VSSSH1S1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSSE1V1 | VSSSE1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| VSSAE1V1 | VSSAE1V1 |
$0 | $0 | 928.6 | — | — | — | — | View | ||
| Bayswater | BW03 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $28.68 | View |
| BUNGAMB1 | BUNGAMB1 |
$0 | $0 | 250,522.2 | -2,743.7 | 101,177.3 | — | — | View | ||
| ASRMGE03 | ASRMGE03 |
$0 | $0 | 8.6 | — | — | — | — | View | ||
| ASRMGE04 | ASRMGE04 |
$0 | $0 | — | — | — | — | — | View | ||
| ASRMGE05 | ASRMGE05 |
$0 | $0 | 2,395.5 | — | — | — | — | View | ||
| ASSDE1 | ASSDE1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASSENC1 | ASSENC1 |
$0 | $0 | 372.9 | — | — | — | — | View | ||
| ASSERDV1 | ASSERDV1 |
$0 | $0 | — | — | — | — | — | View | ||
| ASTHYD1 | ASTHYD1 |
$0 | $0 | 5,930.2 | — | — | — | — | View | ||
| Bairnsdale | BDL02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $158.38 | View |
| Braemar 2 Power Station | BRAEMAR7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 63,631.6 | 0.0% | $132.25 | View |
| VSQHT1V1 | VSQHT1V1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC10 | RT_VIC10 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW3 | RT_NSW3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW2 | RT_NSW2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW1 | RT_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| Dry Creek GT | DRYCGT2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | 24,905.4 | 0.0% | $135.55 | View |
| ERB02 | ERB02 |
$0 | $0 | — | -483.1 | 1,197.7 | — | — | View | ||
| Eraring GT | ERGT01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $96.96 | View |
| Hume Dam VIC | HUMEV |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.54 | View |
| Hunter Power Station | HUNTER2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $152.46 | View |
| Quarantine | QPS4 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| PUMP2 | PUMP2 |
$0 | $0 | — | 32,814.9 | 33,345.7 | — | — | View | ||
| RT_NSW4 | RT_NSW4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW5 | RT_NSW5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC1 | RT_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_TAS1 | RT_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA6 | RT_SA6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA5 | RT_SA5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA4 | RT_SA4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA3 | RT_SA3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA2 | RT_SA2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA1 | RT_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_QLD1 | RT_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW6 | RT_NSW6 |
$0 | $0 | — | — | — | — | — | View | ||
| PUMP1 | PUMP1 |
$0 | $0 | — | 31,668.3 | 32,259.2 | — | — | View | ||
| Kareeya | KAREEYA1 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Laverton North | LNGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Loy Yang A Power Station | LYA1 |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $47.20 | View |
| MLB01 | MLB01 |
$0 | $0 | — | -3,027.3 | 159,493.2 | — | — | View | ||
| MLSP1 | MLSP1 |
$0 | $0 | — | 2,022.2 | — | — | — | View | ||
| Mt Piper | MP2 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Millmerran Power Plant | MPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| MREHA1 | MREHA1 |
$0 | $0 | 46,605.6 | -3,819.7 | 116,946.7 | — | — | View | ||
| MREHA2 | MREHA2 |
$0 | $0 | 49,476.7 | -3,887.4 | 114,636.8 | — | — | View | ||
| MREHA3 | MREHA3 |
$0 | $0 | 118,499.0 | -6,934.8 | 135,036.1 | — | — | View | ||
| Mt Stuart | MSTUART2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 61,490.5 | 0.0% | $148.45 | View |
| Laverton North | LNGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | 118,520.7 | 0.0% | $128.50 | View |
| Lake Echo | LK_ECHO |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.17 | View |
| Port Lincoln GT | POR03 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Port Lincoln GT | POR01 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Kennedy Energy Park - Phase 1 - Storage | KEPBG1 |
QLD1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $2.03 | View |
| KEPBL1 | KEPBL1 |
$0 | $0 | — | — | — | — | — | View | ||
| PLBESS1 | PLBESS1 |
$0 | $0 | — | -148.3 | 7,725.7 | — | — | View | ||
| PIONEER | PIONEER |
$0 | $0 | — | 17,752.5 | — | — | — | View | ||
| KIDSPHG1 | KIDSPHG1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG2 | KIDSPHG2 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL1 | KIDSPHL1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL2 | KIDSPHL2 |
$0 | $0 | — | — | — | — | — | View | ||
| Mt Stuart | MSTUART3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | 80,118.7 | 0.0% | $2.00 | View |
| RT_VIC11 | RT_VIC11 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVS01 | DRSHVS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA04 | DRXNDA04 |
$0 | $0 | — | — | — | — | — | View | ||
| STABESS1 | STABESS1 |
$0 | $0 | — | -720.7 | 820.3 | — | — | View | ||
| DRXNDB04 | DRXNDB04 |
$0 | $0 | — | — | — | — | — | View | ||
| Snuggery | SNUG1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| SNOWYP | SNOWYP |
$0 | $0 | — | 28,063.5 | 26,548.6 | — | — | View | ||
| SNOWYGJP | SNOWYGJP |
$0 | $0 | 8,855.1 | — | — | — | — | View | ||
| DRXNDE01 | DRXNDE01 |
$0 | $0 | — | 4.5 | 5.8 | — | — | View | ||
| DRXNDJ01 | DRXNDJ01 |
$0 | $0 | — | — | 0.9 | — | — | View | ||
| DRXNDW01 | DRXNDW01 |
$0 | $0 | — | — | 2.0 | — | — | View | ||
| DRXNFF01 | DRXNFF01 |
$0 | $0 | — | 2.2 | 2.2 | — | — | View | ||
| DRXNFS01 | DRXNFS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA03 | DRXNDA03 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA02 | DRXNDA02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRSHVS02 | DRSHVS02 |
$0 | $0 | 22,191.1 | — | — | — | — | View | ||
| DRVIOT01 | DRVIOT01 |
$0 | $0 | 8,027.7 | — | — | — | — | View | ||
| DRVIOT02 | DRVIOT02 |
$0 | $0 | 1,568.1 | — | — | — | — | View | ||
| DRVIOT03 | DRVIOT03 |
$0 | $0 | 2,690.5 | — | — | — | — | View | ||
| DRVIOT04 | DRVIOT04 |
$0 | $0 | 74,694.6 | — | — | — | — | View | ||
| DRVIOT05 | DRVIOT05 |
$0 | $0 | 19,624.1 | — | — | — | — | View | ||
| DRVIOT06 | DRVIOT06 |
$0 | $0 | — | — | — | — | — | View | ||
| DRVIOT07 | DRVIOT07 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNAD01 | DRXNAD01 |
$0 | $0 | — | 17.5 | 25.6 | — | — | View | ||
| DRXNAE01 | DRXNAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNDA01 | DRXNDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNQX01 | DRXNQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX02 | DRXVQX02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDP01 | DRXVDP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDX01 | DRXVDX01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQP01 | DRXVQP01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVQX01 | DRXVQX01 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC9 | RT_VIC9 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC8 | RT_VIC8 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC7 | RT_VIC7 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC6 | RT_VIC6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC5 | RT_VIC5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC4 | RT_VIC4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC3 | RT_VIC3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC2 | RT_VIC2 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXVDJ01 | DRXVDJ01 |
$0 | $0 | — | — | 175.0 | — | — | View | ||
| DRXVAE01 | DRXVAE01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNSS01 | DRXNSS01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNTM02 | DRXNTM02 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXNVS01 | DRXNVS01 |
$0 | $0 | — | 20.2 | 21.3 | — | — | View | ||
| SHPUMP | SHPUMP |
$0 | $0 | — | 5,011.5 | 4,985.3 | — | — | View | ||
| DRXQDA01 | DRXQDA01 |
$0 | $0 | — | — | — | — | — | View | ||
| DRXQQE01 | DRXQQE01 |
$0 | $0 | — | — | 346.6 | — | — | View | ||
| DRXSQS01 | DRXSQS01 |
$0 | $0 | — | — | — | — | — | View | ||
| Paloona | PALOONA |
TAS1 | Hydro - Dam | $-1 | $0 | — | 0.1 | — | 0.0% | $1.00 | View |
| Rowallan | ROWALLAN |
TAS1 | Hydro - Dam | $-189 | $0 | — | -3.0 | — | 0.0% | $1.00 | View |
| Jeeralang A | JLA03 |
VIC1 | Turbine - OCGT | $-438 | $0 | — | 18.4 | 29,519.3 | 0.0% | $141.46 | View |
| Jeeralang A | JLA01 |
VIC1 | Turbine - OCGT | $-439 | $0 | — | 18.4 | 29,519.3 | 0.0% | $135.55 | View |
| Wooreen Energy Storage System | WOORB1 |
VIC1 | Storage - Battery | $-1.4k | $0 | — | -19.6 | 130.7 | 0.0% | $1.50 | View |
| Queanbeyan BESS | QBYNB1 |
NSW1 | Storage - Battery | $-2.7k | $0 | — | -17.4 | 89.7 | -0.2% | $1.50 | View |