MLF-adjusted revenue, dispatch, capacity factor, and estimated SRMC from AEMO 5‑minute dispatch data. Data through 20 Sep 2026, 01:55 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Mt Piper | MP1 |
NSW1 | Turbine - Steam Sub Critical | $82.5k | $0 | — | 972.1 | — | 69.5% | $49.24 | View |
| Bayswater | BW04 |
NSW1 | Turbine - Steam Sub Critical | $81.5k | $0 | — | 969.6 | — | 73.9% | $55.48 | View |
| Eraring | ER03 |
NSW1 | Turbine - Steam Sub Critical | $81.3k | $0 | — | 945.2 | — | 68.5% | $49.77 | View |
| Eraring | ER02 |
NSW1 | Turbine - Steam Sub Critical | $81.2k | $0 | — | 945.5 | — | 68.5% | $59.45 | View |
| Bayswater | BW01 |
NSW1 | Turbine - Steam Sub Critical | $78.4k | $0 | — | 932.9 | — | 73.7% | $53.57 | View |
| Eraring | ER04 |
NSW1 | Turbine - Steam Sub Critical | $66.7k | $0 | — | 775.1 | — | 56.2% | $55.48 | View |
| Vales Point B | VP5 |
NSW1 | Turbine - Steam Sub Critical | $55.2k | $0 | — | 640.4 | — | 50.6% | $52.60 | View |
| Vales Point B | VP6 |
NSW1 | Turbine - Steam Sub Critical | $55.1k | $0 | — | 639.5 | — | 50.6% | $52.60 | View |
| Millmerran Power Plant | MPP_2 |
QLD1 | Turbine - Steam Super Critical | $50.2k | $0 | — | 615.6 | — | 75.4% | $52.60 | View |
| Callide C | CPP_3 |
QLD1 | Turbine - Steam Super Critical | $45.1k | $0 | — | 592.6 | — | 72.9% | $44.41 | View |
| Callide C | CPP_4 |
QLD1 | Turbine - Steam Super Critical | $44.8k | $0 | — | 588.9 | — | 73.2% | $101.94 | View |
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $39.3k | $0 | — | 485.6 | — | 55.9% | $0.68 | View |
| Stanwell | STAN-3 |
QLD1 | Turbine - Steam Sub Critical | $37.5k | $0 | — | 491.7 | — | 70.3% | $52.60 | View |
| Stanwell | STAN-1 |
QLD1 | Turbine - Steam Sub Critical | $37.4k | $0 | — | 489.9 | — | 70.0% | $52.60 | View |
| Stanwell | STAN-2 |
QLD1 | Turbine - Steam Sub Critical | $37.4k | $0 | — | 489.5 | — | 70.0% | $52.60 | View |
| Callide B | CALL_B_1 |
QLD1 | Turbine - Steam Sub Critical | $34.4k | $0 | — | 453.0 | — | 67.5% | $32.60 | View |
| Callide B | CALL_B_2 |
QLD1 | Turbine - Steam Sub Critical | $34.4k | $0 | — | 452.6 | — | 67.5% | $55.48 | View |
| Gladstone | GSTONE5 |
QLD1 | Turbine - Steam Sub Critical | $29.4k | $0 | — | 379.6 | — | 70.7% | $58.48 | View |
| Gladstone | GSTONE3 |
QLD1 | Turbine - Steam Sub Critical | $28.9k | $0 | — | 374.5 | — | 69.8% | $128.75 | View |
| Gladstone | GSTONE1 |
QLD1 | Turbine - Steam Sub Critical | $28.3k | $0 | — | 365.4 | — | 68.1% | $52.99 | View |
| Tarong | TARONG#4 |
QLD1 | Turbine - Steam Sub Critical | $28.2k | $0 | — | 347.1 | — | 51.7% | $52.58 | View |
| Tarong | TARONG#2 |
QLD1 | Turbine - Steam Sub Critical | $27.7k | $0 | — | 341.1 | — | 50.9% | $55.48 | View |
| Tarong | TARONG#1 |
QLD1 | Turbine - Steam Sub Critical | $27.7k | $0 | — | 340.7 | — | 50.8% | $52.60 | View |
| Tarong North | TNPS1 |
QLD1 | Turbine - Steam Super Critical | $25.8k | $0 | — | 317.5 | — | 36.8% | $52.60 | View |
| Stanwell | STAN-4 |
QLD1 | Turbine - Steam Sub Critical | $22.1k | $0 | — | 289.7 | — | 41.4% | $52.60 | View |
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $21.5k | $0 | — | 266.1 | — | 55.1% | $0.50 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $13.6k | $0 | — | 165.4 | — | 49.9% | $0.53 | View |
| Upper Tumut | UPPTUMUT |
NSW1 | Hydro - Dam | $11.9k | $0 | — | 140.9 | — | 11.9% | $1.00 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $10.9k | $0 | — | 129.1 | — | 29.7% | $0.65 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $9.7k | $0 | — | 111.2 | — | 54.3% | $0.50 | View |
| Tumut 3 | TUMUT3 |
NSW1 | Hydro - Dam | $9.1k | $0 | — | 109.6 | — | 3.8% | $1.05 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $8.9k | $0 | — | 105.6 | — | 33.3% | $0.53 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $8.8k | $0 | — | 113.1 | — | 17.0% | $0.00 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $8.8k | $0 | — | 112.3 | — | 29.5% | $0.50 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $8.7k | $0 | — | 102.4 | — | 38.0% | $0.00 | View |
| Yarwun 1 | YARWUN_1 |
QLD1 | Turbine - CCGT | $8.0k | $0 | — | 103.3 | — | 29.9% | $84.30 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $6.3k | $0 | — | 77.6 | — | 4.4% | $0.58 | View |
| SHOAL1 | SHOAL1 |
NSW1 | $5.5k | $0 | — | 63.2 | — | 13.4% | $1.20 | View | |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $4.9k | $0 | — | 63.1 | — | 18.3% | $0.50 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $4.7k | $0 | — | 59.6 | — | 19.8% | $0.00 | View |
| Limondale BESS | LIMBESS1 |
NSW1 | Storage - Battery | $4.5k | $0 | — | 60.7 | — | 63.3% | $1.50 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $4.4k | $0 | — | 52.9 | — | 24.4% | $0.00 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $4.2k | $0 | — | 49.5 | — | 53.5% | $0.50 | View |
| Guthega | GUTHEGA |
NSW1 | Hydro - Dam | $3.6k | $0 | — | 44.1 | — | 38.4% | $1.05 | View |
| Blowering | BLOWERNG |
NSW1 | Hydro - Dam | $3.3k | $0 | — | 40.5 | — | 26.4% | $0.00 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $3.0k | $0 | — | 37.0 | — | 13.6% | $0.53 | View |
| Broadwater | BWTR1 |
NSW1 | Turbine - Steam Sub Critical | $2.9k | $0 | — | 34.4 | — | 47.3% | $124.22 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $2.6k | $0 | — | 35.6 | — | 10.6% | $0.50 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $2.6k | $0 | — | 30.8 | — | 53.6% | $0.68 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $2.6k | $0 | — | 30.7 | — | 34.4% | $0.50 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $2.5k | $0 | — | 29.4 | — | 13.9% | $0.50 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $2.4k | $0 | — | 28.8 | — | 15.7% | $0.69 | View |
| Moranbah North | MBAHNTH |
QLD1 | Reciprocating Engine - Spark ignition | $2.4k | $0 | — | 29.2 | — | 23.8% | $57.00 | View |
| Hume Dam NSW | HUMENSW |
NSW1 | Hydro - Dam | $2.4k | $0 | — | 28.7 | — | 51.6% | $1.05 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $2.3k | $0 | — | 29.3 | — | 35.4% | $0.68 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $2.2k | $0 | — | 28.5 | — | 14.4% | $0.58 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $2.1k | $0 | — | 25.2 | — | 22.8% | $0.76 | View |
| German Creek | GERMCRK |
QLD1 | Reciprocating Engine - Spark ignition | $1.8k | $0 | — | 23.3 | — | 27.0% | $122.81 | View |
| Loy Yang A Power Station | LYA4 |
VIC1 | Turbine - Steam Sub Critical | $1.7k | $0 | — | 562.2 | — | 52.4% | $47.20 | View |
| Loy Yang B | LOYYB2 |
VIC1 | Turbine - Steam Sub Critical | $1.7k | $0 | — | 612.7 | — | 55.1% | $47.20 | View |
| Loy Yang B | LOYYB1 |
VIC1 | Turbine - Steam Sub Critical | $1.7k | $0 | — | 608.9 | — | 54.8% | $47.20 | View |
| Loy Yang A Power Station | LYA2 |
VIC1 | Turbine - Steam Sub Critical | $1.7k | $0 | — | 611.9 | — | 60.2% | $47.20 | View |
| Tully Sugar Mill | TULLYSM1 |
QLD1 | Turbine - Steam Super Critical | $1.2k | $0 | — | 14.1 | — | 23.0% | $117.00 | View |
| Yallourn W | YWPS1 |
VIC1 | Turbine - Steam Sub Critical | $1.0k | $0 | — | 467.1 | — | 69.6% | $47.20 | View |
| Yallourn W | YWPS2 |
VIC1 | Turbine - Steam Sub Critical | $894 | $0 | — | 410.4 | — | 61.2% | $47.20 | View |
| Waratah Super Battery | WTAHB1 |
NSW1 | Storage - Battery | $859 | $0 | — | 9.8 | — | 0.6% | $1.50 | View |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $800 | $0 | — | 9.5 | — | 1.2% | $0.50 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $729 | $0 | — | 349.5 | — | 58.4% | $0.50 | View |
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $712 | $0 | — | 205.2 | — | 53.3% | $0.50 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $692 | $0 | — | 348.6 | — | 34.5% | $0.50 | View |
| Catagunya / Liapootah / Wayatinah | LI_WY_CA |
TAS1 | Hydro - Dam | $690 | $0 | — | 175.7 | — | 51.9% | $1.05 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $675 | $0 | — | 183.8 | — | 45.9% | $0.55 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $600 | $0 | — | 197.1 | — | 50.5% | $0.00 | View |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $549 | $0 | — | 358.9 | — | 44.6% | $0.50 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $536 | $0 | — | 193.2 | — | 70.0% | $0.66 | View |
| GPWFWST2 | GPWFWST2 |
VIC1 | $527 | $0 | — | 129.9 | — | 12.2% | $0.53 | View | |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $482 | $0 | — | 157.5 | — | 62.8% | $0.50 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $481 | $0 | — | 160.5 | — | 63.3% | $0.80 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $469 | $0 | — | 148.8 | — | 61.6% | $0.50 | View |
| Reece | REECE1 |
TAS1 | Hydro - Dam | $468 | $0 | — | 41.9 | — | 18.9% | $1.00 | View |
| Reece | REECE2 |
TAS1 | Hydro - Dam | $428 | $0 | — | 40.8 | — | 18.4% | $1.00 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $410 | $0 | — | 208.4 | — | 49.8% | $0.50 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $402 | $0 | — | 53.3 | — | 23.2% | $0.50 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $398 | $0 | — | 142.4 | — | 51.6% | $0.50 | View |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $372 | $0 | — | 139.9 | — | 50.6% | $0.50 | View |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $357 | $0 | — | 131.8 | — | 69.7% | $0.50 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $352 | $0 | — | 114.2 | — | 69.0% | $0.50 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $349 | $0 | — | 150.7 | — | 62.4% | $0.74 | View |
| Mackintosh | MACKNTSH |
TAS1 | Hydro - Dam | $346 | $0 | — | 33.9 | — | 22.1% | $1.00 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $343 | $0 | — | 122.7 | — | 62.5% | $0.50 | View |
| Tarraleah | TARRALEA |
TAS1 | Hydro - Dam | $330 | $0 | — | 98.8 | — | 57.3% | $1.00 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $328 | $0 | — | 106.7 | — | 58.9% | $0.71 | View |
| Bastyan | BASTYAN |
TAS1 | Hydro - Dam | $326 | $0 | — | 32.3 | — | 21.1% | $0.00 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $323 | $0 | — | 129.1 | — | 65.8% | $0.69 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $317 | $0 | — | 129.1 | — | 60.2% | $0.68 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $306 | $0 | — | 3.7 | — | 2.3% | $0.00 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $302 | $0 | — | 231.3 | — | 48.7% | $0.50 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $283 | $0 | — | 133.5 | — | 41.5% | $0.50 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $280 | $0 | — | 87.4 | — | 17.5% | $0.50 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $266 | $0 | — | 88.0 | — | 63.5% | $0.50 | View |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $266 | $0 | — | 131.1 | — | 45.1% | $0.50 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $263 | $0 | — | 87.1 | — | 63.6% | $0.00 | View |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $260 | $0 | — | 152.5 | — | 60.6% | $0.50 | View |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $257 | $0 | — | 176.8 | — | 51.1% | $0.50 | View |
| GPWFWST1 | GPWFWST1 |
VIC1 | $248 | $0 | — | 234.3 | — | 21.9% | $0.53 | View | |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $237 | $0 | — | 74.2 | — | 62.4% | $0.53 | View |
| Cethana | CETHANA |
TAS1 | Hydro - Dam | $236 | $0 | — | 8.7 | — | 5.4% | $1.09 | View |
| Devils Gate | DEVILS_G |
TAS1 | Hydro - Dam | $235 | $0 | — | 10.0 | — | 8.7% | $1.00 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $226 | $0 | — | 102.5 | — | 58.9% | $0.50 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $225 | $0 | — | 88.1 | — | 47.6% | $0.00 | View |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $222 | $0 | — | 91.6 | — | 30.1% | $0.86 | View |
| Fisher | FISHER |
TAS1 | Hydro - Dam | $215 | $0 | — | 58.0 | — | 70.1% | $1.05 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $213 | $0 | — | 72.8 | — | 72.3% | $0.77 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $201 | $0 | — | 53.8 | — | 10.4% | $0.50 | View |
| Meadowbank | MEADOWBK |
TAS1 | Hydro - Dam | $200 | $0 | — | 51.5 | — | 67.1% | $1.00 | View |
| Orana BESS | ORABESS1 |
NSW1 | Storage - Battery | $197 | $0 | — | 2.3 | — | 0.3% | $1.50 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $195 | $0 | — | 115.2 | — | 35.8% | $0.66 | View |
| Pelican Point | PPCCGT |
SA1 | Turbine - CCGT | $185 | $0 | — | 57.7 | — | 5.7% | $84.30 | View |
| Smithfield BESS | SMTHBES1 |
NSW1 | Storage - Battery | $176 | $0 | — | 2.0 | — | 1.2% | $1.50 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $173 | $0 | — | 96.7 | — | 21.0% | $0.00 | View |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $163 | $0 | — | 129.1 | — | 35.1% | $0.50 | View |
| Repulse | REPULSE |
TAS1 | Hydro - Dam | $163 | $0 | — | 46.3 | — | 86.3% | $1.00 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $161 | $0 | — | 55.4 | — | 11.7% | $0.00 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $160 | $0 | — | 58.2 | — | 27.2% | $0.66 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $158 | $0 | — | 99.2 | — | 25.3% | $0.00 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $152 | $0 | — | 70.4 | — | 45.7% | $0.79 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $150 | $0 | — | 53.4 | — | 49.1% | $0.80 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $143 | $0 | — | 58.1 | — | 36.2% | $0.53 | View |
| Lemonthyme / Wilmot | LEM_WIL |
TAS1 | Hydro - Dam | $139 | $0 | — | 10.9 | — | 7.0% | $1.00 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $138 | $0 | — | 80.8 | — | 34.6% | $0.53 | View |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $137 | $0 | — | 88.7 | — | 42.4% | $0.65 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $135 | $0 | — | 66.1 | — | 24.9% | $0.50 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $124 | $0 | — | 32.7 | — | 31.6% | $0.50 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $122 | $0 | — | 132.8 | — | 44.0% | $0.50 | View |
| Gordon | GORDON |
TAS1 | Hydro - Dam | $121 | $0 | — | 55.1 | — | 6.7% | $1.05 | View |
| Cluny | CLUNY |
TAS1 | Hydro - Dam | $95 | $0 | — | 26.0 | — | 71.4% | $1.00 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $91 | $0 | — | 41.8 | — | 47.4% | $0.50 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $83 | $0 | — | 27.4 | — | 43.3% | $0.50 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $80 | $0 | — | 55.8 | — | 36.4% | $0.68 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $75 | $0 | — | 35.4 | — | 27.5% | $0.50 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $73 | $0 | — | 33.7 | — | 33.5% | $0.53 | View |
| Tarong | TARONG#3 |
QLD1 | Turbine - Steam Sub Critical | $69 | $0 | — | 0.8 | — | 0.1% | $55.48 | View |
| Mt Stuart | MSTUART1 |
QLD1 | Turbine - OCGT | $60 | $0 | — | 0.8 | — | 0.3% | $2.00 | View |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $59 | $0 | — | 0.7 | — | 0.2% | $0.58 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $53 | $0 | — | 0.6 | — | 0.2% | $0.00 | View |
| Ulinda Park BESS | ULPBESS1 |
QLD1 | Storage - Battery | $52 | $0 | — | 0.7 | — | 0.2% | $1.50 | View |
| Mt Stuart | MSTUART2 |
QLD1 | Turbine - OCGT | $48 | $0 | — | 0.6 | — | 0.2% | $148.45 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $45 | $0 | — | 24.9 | — | 22.6% | $0.53 | View |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $43 | $0 | — | 29.2 | — | 33.0% | $0.66 | View |
| Greenbank BESS | GREENB1 |
QLD1 | Storage - Battery | $42 | $0 | — | 0.5 | — | 0.1% | $1.54 | View |
| Butlers Gorge | BUTLERSG |
TAS1 | Hydro - Dam | $42 | $0 | — | 12.7 | — | 54.4% | $1.00 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $40 | $0 | — | 15.1 | — | 26.3% | $0.50 | View |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $40 | $0 | — | 20.3 | — | 54.4% | $0.50 | View |
| Paloona | PALOONA |
TAS1 | Hydro - Dam | $38 | $0 | — | 11.1 | — | 20.7% | $1.00 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $37 | $0 | — | 10.7 | — | 4.0% | $0.53 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $35 | $0 | — | 12.0 | — | 16.0% | $0.53 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $34 | $0 | — | 16.3 | — | 29.6% | $0.50 | View |
| BRDDBES1 | BRDDBES1 |
QLD1 | $31 | $0 | — | 0.4 | — | 0.1% | $0.27 | View | |
| Liddell BESS | LDBESS1 |
NSW1 | Storage - Battery | $30 | $0 | — | 0.4 | — | 0.0% | $1.50 | View |
| Swanbank E GT | SWAN_E |
QLD1 | Turbine - CCGT | $26 | $0 | — | 0.3 | — | 0.0% | $2.00 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $25 | $0 | — | 44.4 | — | 21.7% | $0.00 | View |
| Edenvale Solar Park | EDENVSF1 |
QLD1 | Solar PV - Single axis tracking | $24 | $0 | — | 0.3 | — | 0.1% | $0.00 | View |
| Chinchilla BESS | CHBESS1 |
QLD1 | Storage - Battery | $20 | $0 | — | 0.3 | — | 0.1% | $1.75 | View |
| Braemar 2 Power Station | BRAEMAR5 |
QLD1 | Turbine - OCGT | $17 | $0 | — | 0.2 | — | 0.1% | $3.14 | View |
| Rubicon Mountain Streams | RUBICON |
VIC1 | Hydro - Dam | $17 | $0 | — | 7.4 | — | 28.5% | $1.00 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $12 | $0 | — | 0.1 | — | 0.1% | $0.68 | View |
| Barcaldine Remote Community Solar Farm | BARCSF1 |
QLD1 | Solar PV - Single axis tracking | $10 | $0 | — | 0.1 | — | 0.4% | $0.00 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $8 | $0 | — | 18.8 | — | 4.7% | $0.50 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $3 | $0 | — | 6.3 | — | 41.1% | $0.00 | View |
| West Kiewa | WKIEWA1 |
VIC1 | Hydro - Dam | $3 | $0 | — | 1.3 | — | 2.0% | $10.00 | View |
| Trevallyn | TREVALLN |
TAS1 | Hydro - Dam | $3 | $0 | — | 0.1 | — | 0.0% | $1.00 | View |
| Yallourn W | YWPS3 |
VIC1 | Turbine - Steam Sub Critical | $3 | $0 | — | 1.1 | — | 0.2% | $47.20 | View |
| Bulgana Green Power Hub - BESS | BULBES1 |
VIC1 | Storage - Battery | $2 | $0 | — | -0.5 | — | -1.4% | $1.98 | View |
| Munna Creek Solar Farm | MUCRKSF1 |
QLD1 | Solar PV - Single axis tracking | $1 | $0 | — | 0.0 | — | 0.0% | $0.25 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $1 | $0 | — | 8.1 | — | 1.9% | $0.50 | View |
| Darlington Point Energy Storage System | DPNTB1 |
NSW1 | Storage - Battery | $1 | $0 | — | 0.0 | — | 0.0% | $0.00 | View |
| Stubbo Solar Farm | STUBSF1 |
NSW1 | Solar PV - Single axis tracking | $1 | $0 | — | 0.0 | — | 0.0% | $0.25 | View |
| Stubbo Solar Farm | STUBSF2 |
NSW1 | Solar PV - Single axis tracking | $1 | $0 | — | 0.0 | — | 0.0% | $0.25 | View |
| Mintaro GT | MINTARO |
SA1 | Turbine - OCGT | $0 | $0 | — | 0.1 | — | 0.1% | $128.50 | View |
| Parkes Solar Farm | PARSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | 0.0 | — | 0.0% | $0.25 | View |
| Griffith Solar Farm | GRIFSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | 0.0 | — | 0.0% | $0.35 | View |
| Royalla Solar Farm | ROYALLA1 |
NSW1 | Solar PV - Fixed | $0 | $0 | — | 0.0 | — | 0.0% | $0.20 | View |
| Bogong / Mackay | MCKAY1 |
VIC1 | Hydro - Dam | $0 | $0 | — | 0.0 | — | 0.0% | $1.00 | View |
| Ladbroke Grove | LADBROK1 |
SA1 | Turbine - OCGT | $0 | $0 | — | 0.0 | — | 0.0% | $153.02 | View |
| Ladbroke Grove | LADBROK2 |
SA1 | Turbine - OCGT | $0 | $0 | — | 0.0 | — | 0.0% | $145.06 | View |
| Christies Beach Wastewater Treatment Plant | CBWWBA1 |
SA1 | Storage - Battery | $0 | $0 | — | 0.0 | — | 0.3% | $1.50 | View |
| Dry Creek GT | DRYCGT3 |
SA1 | Turbine - OCGT | $0 | $0 | — | 0.0 | — | 0.0% | $210.15 | View |
| Bolivar Power Station | BOLIVPS1 |
SA1 | Turbine - OCGT | $0 | $0 | — | 0.0 | — | 0.0% | $151.37 | View |
| Adelaide Desalination Plant | ADPPV1 |
SA1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Hallett GT | AGLHAL |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $100.22 | View |
| Somerton | AGLSOM |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Aldoga Solar Farm | ALDGASF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Avonlie Solar Farm | AVLSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Ballarat Energy Storage System | BALB1 |
VIC1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Bannerton Solar Park | BANN1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.34 | View |
| Barcaldine Power Station | BARCALDN |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $141.78 | View |
| Barker Inlet Power Station | BARKIPS1 |
SA1 | Reciprocating Engine - Spark ignition | $0 | $0 | — | — | — | 0.0% | $9.00 | View |
| Barron Gorge | BARRON-1 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Barron Gorge | BARRON-2 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Bell Bay Three | BBTHREE1 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $182.63 | View |
| Bell Bay Three | BBTHREE2 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $137.22 | View |
| Bell Bay Three | BBTHREE3 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $141.97 | View |
| Bairnsdale | BDL01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $142.10 | View |
| Bairnsdale | BDL02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $158.38 | View |
| Beryl Solar Farm | BERYLSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Broken Hill | BHB1 |
NSW1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $1.50 | View |
| Bluegrass Solar Farm | BLUEGSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.29 | View |
| Bungala One Solar Farm | BNGSF1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.34 | View |
| Bungala Two Solar Farm | BNGSF2 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.33 | View |
| Bomen Solar Farm | BOMENSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Bolivar Waste Water Treatment | BOWWPV1 |
SA1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.23 | View |
| Braemar | BRAEMAR1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $133.75 | View |
| Braemar | BRAEMAR2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $130.94 | View |
| Braemar | BRAEMAR3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Braemar 2 Power Station | BRAEMAR6 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $133.36 | View |
| Braemar 2 Power Station | BRAEMAR7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $132.25 | View |
| BRDDSF01 | BRDDSF01 |
QLD1 | $0 | $0 | — | — | — | 0.0% | $0.27 | View | |
| Broken Hill Solar Plant | BROKENH1 |
NSW1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.28 | View |
| BUNGAMB1 | BUNGAMB1 |
$0 | $0 | — | -2.9 | — | — | — | View | ||
| Bundaberg Solar Farm | BUSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $14.55 | View |
| Bayswater | BW02 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $26.23 | View |
| Bayswater | BW03 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $28.68 | View |
| Colongra | CG1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $197.00 | View |
| Colongra | CG2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $135.55 | View |
| Colongra | CG3 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $144.24 | View |
| Colongra | CG4 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $194.33 | View |
| Childers Solar Farm | CHILDSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.34 | View |
| Clare Solar Farm | CLARESF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Clermont Solar Farm | CLERMSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.34 | View |
| Clover | CLOVER |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.17 | View |
| Cohuna Solar Farm | COHUNSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.33 | View |
| Coleambally Solar Farm | COLEASF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Columboola Solar Farm | COLUMSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.32 | View |
| Condamine A | CPSA |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $95.40 | View |
| CRWARP1 | CRWARP1 |
$0 | $0 | — | — | — | — | — | View | ||
| Corowa Solar Farm | CRWASF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.33 | View |
| Collinsville PV | CSPVPS1 |
QLD1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.28 | View |
| Culcairn Solar Farm | CUSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Darlington Point Solar Farm | DARLSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.33 | View |
| Dartmouth | DARTM1 |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Daydream Solar Farm | DAYDSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Darling Downs | DDPS1 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $3.31 | View |
| Darling Downs Solar Farm | DDSF1 |
QLD1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.28 | View |
| DG_NSW1 | DG_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_QLD1 | DG_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_SA1 | DG_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_TAS1 | DG_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| DG_VIC1 | DG_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| Dry Creek GT | DRYCGT1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $141.50 | View |
| Dry Creek GT | DRYCGT2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $135.55 | View |
| Eildon | EILDON1 |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.05 | View |
| Eildon | EILDON2 |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Emerald Solar Park | EMERASF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Eraring | ER01 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $48.29 | View |
| ERB02 | ERB02 |
$0 | $0 | — | -0.8 | — | — | — | View | ||
| Eraring GT | ERGT01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $96.96 | View |
| Finley Solar Farm | FINLYSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Gangarri Solar Farm | GANGARR1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.26 | View |
| Gannawarra Solar Farm | GANNSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.34 | View |
| Broken Hill GT | GB01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.11 | View |
| Glenellen Solar Farm | GESF1 |
NSW1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Girgarre Solar Farm | GIRGSF |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Glenrowan Solar Farm | GLENSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Glenrowan West Solar Farm | GLRWNSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.32 | View |
| Gunnedah Solar Farm | GNNDHSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.33 | View |
| Goorambat East Solar Farm (ENGIE) | GOESF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Goonumbla Solar Farm | GOONSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Gladstone | GSTONE2 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $49.17 | View |
| Gladstone | GSTONE4 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Gladstone | GSTONE6 |
QLD1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $54.96 | View |
| Gullen Range Solar Farm | GULLRSF1 |
NSW1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.27 | View |
| Gunsynd Solar Farm | GUSF1 |
QLD1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Hamilton Solar Farm | HAMISF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $18.64 | View |
| Haughton Solar Farm Stage 1 | HAUGHT11 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Hayman Solar Farm | HAYMSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.34 | View |
| Hunter EconomicZone | HEZ1 |
NSW1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | — | 0.0% | $308.00 | View |
| Hillston Sun Farm | HILLSTN1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Hume Dam VIC | HUMEV |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.54 | View |
| Hunter Power Station | HUNTER1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $142.99 | View |
| Hunter Power Station | HUNTER2 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $152.46 | View |
| Happy Valley Reservoir | HVWWPV1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| John Butters | JBUTTERS |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Jemalong Solar | JEMALNG1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.32 | View |
| Jeeralang A | JLA01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $135.55 | View |
| Jeeralang A | JLA02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Jeeralang A | JLA03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $141.46 | View |
| Jeeralang A | JLA04 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $177.20 | View |
| Jeeralang B | JLB01 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Jeeralang B | JLB02 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $137.71 | View |
| Jeeralang B | JLB03 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $137.85 | View |
| Junee Solar Farm | JUNEESF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Kareeya | KAREEYA1 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Kareeya | KAREEYA2 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Kareeya | KAREEYA3 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.05 | View |
| Kareeya | KAREEYA4 |
QLD1 | Hydro - Run of River | $0 | $0 | — | — | — | 0.0% | $1.66 | View |
| Karadoc Solar Farm | KARSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Kennedy Energy Park - Phase 1 - Storage | KEPBG1 |
QLD1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $2.03 | View |
| Kennedy Energy Park - Phase 1 - Solar | KEPSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.34 | View |
| Kerang Hybrid | KERNGSP1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.26 | View |
| Kiamal Solar Farm - Stage 1 | KIAMSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| KIDSPHG1 | KIDSPHG1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHG2 | KIDSPHG2 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL1 | KIDSPHL1 |
$0 | $0 | — | — | — | — | — | View | ||
| KIDSPHL2 | KIDSPHL2 |
$0 | $0 | — | — | — | — | — | View | ||
| Kingaroy Solar Farm | KINGASF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Kogan Creek | KPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Kidston Solar Project Phase One 50MW | KSP1 |
QLD1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.20 | View |
| Lancaster Solar Farm | LANCSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| LINCOLN GAP BESSBDU | LGAPBS1 |
SA1 | Storage - Battery | $0 | $0 | — | — | — | 0.0% | $1.50 | View |
| Lilyvale Solar Farm | LILYSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Limondale Solar Farm 1 | LIMOSF11 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Limondale Solar Farm 2 | LIMOSF21 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Lake Echo | LK_ECHO |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.17 | View |
| Laverton North | LNGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Laverton North | LNGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Lonsdale | LONSDALE |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | — | 0.0% | $308.00 | View |
| Longreach Solar Farm | LRSF1 |
QLD1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.20 | View |
| Loy Yang A Power Station | LYA1 |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $47.20 | View |
| Loy Yang A Power Station | LYA3 |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $47.20 | View |
| Mannum Solar Farm 2 | MANNSF2 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Manildra Solar Farm | MANSLR1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Mannum Adelaide Pumping Station No 2 - MAPL2 (Palmer) | MAPS2PV1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.26 | View |
| Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) | MAPS3PV1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Maryrorough Solar Farm | MARYRSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Murray Bridge - Onkaparinga Pipeline Pump 2 | MBPS2PV1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Metz Solar Farm | METZSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Middlemount Solar Farm | MIDDLSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| MLB01 | MLB01 |
$0 | $0 | — | -1.0 | — | — | — | View | ||
| MLSP1 | MLSP1 |
$0 | $0 | — | 0.0 | — | — | — | View | ||
| Mokoan Solar Farm (LightsourceBP) | MOKOSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Molong Solar Farm | MOLNGSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Moree Solar Farm | MOREESF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Mortlake | MORTLK11 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Mortlake | MORTLK12 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Moura Solar Farm | MOUSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Mt Piper | MP2 |
NSW1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| Millmerran Power Plant | MPP_1 |
QLD1 | Turbine - Steam Super Critical | $0 | $0 | — | — | — | 0.0% | $52.60 | View |
| MREHA1 | MREHA1 |
$0 | $0 | — | 0.5 | — | — | — | View | ||
| MREHA2 | MREHA2 |
$0 | $0 | — | -6.9 | — | — | — | View | ||
| MREHA3 | MREHA3 |
$0 | $0 | — | -14.2 | — | — | — | View | ||
| Mt Stuart | MSTUART3 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Mulwala Solar Farm | MULWASF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Murray 2 | MURRAY |
VIC1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant | MWPS1PV1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Morgan To Whyalla Pipeline No 2 PS | MWPS2PV1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Morgan To Whyalla Pipeline No 3 PS | MWPS3PV1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Morgan To Whyalla Pipeline No 4 PS | MWPS4PV1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Nevertire Solar Farm | NEVERSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| New England Solar Farm | NEWENSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| New England Solar Farm | NEWENSF2 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Newport | NPS |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Numurkah Solar Farm | NUMURSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Nyngan Solar Plant | NYNGAN1 |
NSW1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.20 | View |
| Oakey Power Station | OAKEY1 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Oakey Solar Farm | OAKEY1SF |
QLD1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.20 | View |
| Oakey Power Station | OAKEY2 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Oakey 2 Solar Farm | OAKEY2SF |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Osborne | OSB-AG |
SA1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Port Augusta Renewable Energy Park - Solar | PAREPS1 |
SA1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.20 | View |
| PIONEER | PIONEER |
$0 | $0 | — | 57.9 | — | — | — | View | ||
| PLBESS1 | PLBESS1 |
$0 | $0 | — | -0.3 | — | — | — | View | ||
| Poatina | POAT110 |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Poatina | POAT220 |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Port Lincoln GT | POR01 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Port Lincoln GT | POR03 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Port Stanvac 1 | PTSTAN1 |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | — | — | 0.0% | $308.00 | View |
| PUMP1 | PUMP1 |
$0 | $0 | — | — | — | — | — | View | ||
| PUMP2 | PUMP2 |
$0 | $0 | — | — | — | — | — | View | ||
| Quarantine | QPS1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Quarantine | QPS2 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Quarantine | QPS3 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Quarantine | QPS4 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Quarantine | QPS5 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $209.05 | View |
| Roma | ROMA_7 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Roma | ROMA_8 |
QLD1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Ross River Solar Farm | RRSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| RT_NSW1 | RT_NSW1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW2 | RT_NSW2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW3 | RT_NSW3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW4 | RT_NSW4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW5 | RT_NSW5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_NSW6 | RT_NSW6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_QLD1 | RT_QLD1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA1 | RT_SA1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA2 | RT_SA2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA3 | RT_SA3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA4 | RT_SA4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA5 | RT_SA5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_SA6 | RT_SA6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_TAS1 | RT_TAS1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC1 | RT_VIC1 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC10 | RT_VIC10 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC11 | RT_VIC11 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC12 | RT_VIC12 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC2 | RT_VIC2 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC3 | RT_VIC3 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC4 | RT_VIC4 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC5 | RT_VIC5 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC6 | RT_VIC6 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC7 | RT_VIC7 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC8 | RT_VIC8 |
$0 | $0 | — | — | — | — | — | View | ||
| RT_VIC9 | RT_VIC9 |
$0 | $0 | — | — | — | — | — | View | ||
| Rugby Run Solar Farm | RUGBYR1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Sebastopol Solar Farm | SEBSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| SHGEN | SHGEN |
NSW1 | $0 | $0 | — | — | — | 0.0% | $1.20 | View | |
| SHPUMP | SHPUMP |
$0 | $0 | — | — | — | — | — | View | ||
| Smithfield Energy Facility | SITHE01 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Sun Metals Corporation Solar Farm | SMCSF1 |
QLD1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.00 | View |
| Snapper Point Power Station | SNAPPER1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| SNOWYP | SNOWYP |
$0 | $0 | — | — | — | — | — | View | ||
| Snuggery | SNUG1 |
SA1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Susan River Solar Farm | SRSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| STABESS1 | STABESS1 |
$0 | $0 | — | -0.7 | — | — | — | View | ||
| Sunraysia Solar Farm | SUNRSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Suntop Solar Farm | SUNTPSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Tallawarra | TALWA1 |
NSW1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Tallawarra B | TALWB1 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Tailem Bend Stage 2 Solar Project | TB2SF1 |
SA1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| TB3B1 | TB3B1 |
$0 | $0 | — | — | — | — | — | View | ||
| Tailem Bend - Solar | TBSF1 |
SA1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.20 | View |
| Torrens Island B | TORRB2 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $5.47 | View |
| Torrens Island B | TORRB3 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Torrens Island B | TORRB4 |
SA1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $2.00 | View |
| Tribute | TRIBUTE |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Tungatinah | TUNGATIN |
TAS1 | Hydro - Dam | $0 | $0 | — | — | — | 0.0% | $1.00 | View |
| Tamar Valley Combined Cycle | TVCC201 |
TAS1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Tamar Valley Peaking | TVPP104 |
TAS1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Uranquinty | URANQ11 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Uranquinty | URANQ12 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Uranquinty | URANQ13 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Uranquinty | URANQ14 |
NSW1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Valley Power | VPGS1 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Valley Power | VPGS2 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Valley Power | VPGS3 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Valley Power | VPGS4 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Valley Power | VPGS5 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Valley Power | VPGS6 |
VIC1 | Turbine - OCGT | $0 | $0 | — | — | — | 0.0% | $128.50 | View |
| Wivenhoe | W/HOE#1 |
Storage - Pumped hydro | $0 | $0 | — | — | — | — | — | View | |
| Wivenhoe | W/HOE#2 |
Storage - Pumped hydro | $0 | $0 | — | — | — | — | — | View | |
| Wagga North Solar Farm | WAGGNSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| WAMBOWF2 | WAMBOWF2 |
$0 | $0 | — | 73.8 | — | — | — | View | ||
| Wandoan South Solar Stage 1 | WANDSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Wandoan South Solar Stage 2 | WANDSF2 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Warwick Solar Farm | WARWSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Warwick Solar Farm | WARWSF2 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Western Downs Green Power Hub P/L | WDGPH1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.32 | View |
| Wellington Solar Farm | WELLSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Wellington North Solar Farm (Lightsource) | WELNSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Wemen Solar Farm | WEMENSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Whitsunday Solar Farm | WHITSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Winton Solar Farm | WINTSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Walla Walla Solar Farm | WLWLSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Walla Walla Solar Farm | WLWLSF2 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| WNSF1 | WNSF1 |
$0 | $0 | — | — | — | — | — | View | ||
| Wollar Solar Farm | WOLARSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| WOOLES1 | WOOLES1 |
$0 | $0 | — | -0.5 | — | — | — | View | ||
| Woolooga Solar Farm | WOOLGSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| WOORB1 | WOORB1 |
$0 | $0 | — | — | — | — | — | View | ||
| White Rock Solar Farm | WRSF1 |
NSW1 | Solar PV - Fixed | $0 | $0 | — | — | — | 0.0% | $0.20 | View |
| West Wyalong Solar Farm | WSTWYSF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Wunghnu Solar Farm | WUNUSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Wyalong Solar Farm | WYASF1 |
NSW1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Townsville Power Station | YABULU |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Townsville Power Station | YABULU2 |
QLD1 | Turbine - CCGT | $0 | $0 | — | — | — | 0.0% | $84.30 | View |
| Yarranlea Solar Farm | YARANSF1 |
QLD1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Yatpool Solar Farm | YATSF1 |
VIC1 | Solar PV - Single axis tracking | $0 | $0 | — | — | — | 0.0% | $0.25 | View |
| Yallourn W | YWPS4 |
VIC1 | Turbine - Steam Sub Critical | $0 | $0 | — | — | — | 0.0% | $47.20 | View |
| Koorangie Energy Storage System | KESSB1 |
VIC1 | Storage - Battery | $0 | $0 | — | 0.0 | — | 0.0% | $1.50 | View |
| Rowallan | ROWALLAN |
TAS1 | Hydro - Dam | $0 | $0 | — | 0.0 | — | 0.0% | $1.00 | View |
| Happy Valley Reservoir | HVWWBA1 |
SA1 | Storage - Battery | $0 | $0 | — | 0.0 | — | 0.1% | $1.58 | View |
| Bolivar Waste Water Treatment | BOWWBA1 |
SA1 | Storage - Battery | $0 | $0 | — | 0.0 | — | 0.3% | $1.58 | View |
| Adelaide Desalination Plant | ADPBA1 |
SA1 | Storage - Battery | $0 | $0 | — | 0.0 | — | 0.2% | $0.00 | View |
| Philip Island BESS | PIBESS1 |
VIC1 | Storage - Battery | $0 | $0 | — | -0.1 | — | -0.5% | $1.50 | View |
| Angaston | ANGAST1 |
SA1 | Reciprocating Engine - Compression ignition | $0 | $0 | — | -0.1 | — | -0.1% | $0.00 | View |
| LaTrobe Valley BESS | LVES1 |
VIC1 | Storage - Battery | $0 | $0 | — | -0.6 | — | -0.3% | $1.54 | View |
| Lake Bonney Battery Energy Storage | LBB1 |
SA1 | Storage - Battery | $-1 | $0 | — | 0.0 | — | -0.1% | $1.98 | View |
| Rangebank BESS | RANGEB1 |
VIC1 | Storage - Battery | $-1 | $0 | — | 0.4 | — | 0.1% | $1.50 | View |
| Gannawarra Energy Storage System | GANNB1 |
VIC1 | Storage - Battery | $-1 | $0 | — | -0.1 | — | -0.1% | $1.98 | View |
| Mornington BESS | MRNBESS1 |
VIC1 | Storage - Battery | $-2 | $0 | — | 0.5 | — | 0.1% | $1.50 | View |
| KIATAWF1 | KIATAWF1 |
VIC1 | $-2 | $0 | — | 8.3 | — | 14.0% | $0.68 | View | |
| Tailem Bend Battery Project | TB2B1 |
SA1 | Storage - Battery | $-2 | $0 | — | -0.7 | — | -0.9% | $1.50 | View |
| Hornsdale Power Reserve Unit 1 | HPR1 |
SA1 | Storage - Battery | $-2 | $0 | — | -2.4 | — | -0.8% | $1.50 | View |
| Templers B BESS | TEMPB1 |
SA1 | Storage - Battery | $-2 | $0 | — | -0.6 | — | -0.3% | $1.50 | View |
| Riverina Energy Storage System 1 | RESS1 |
NSW1 | Storage - Battery | $-2 | $0 | — | 0.0 | — | 0.0% | $1.50 | View |
| Mannum BESS | MANNUMB1 |
SA1 | Storage - Battery | $-3 | $0 | — | -0.4 | — | -0.2% | $1.50 | View |
| Hazelwood Battery Energy Storage System (HBESS) | HBESS1 |
VIC1 | Storage - Battery | $-3 | $0 | — | -2.2 | — | -0.6% | $1.87 | View |
| SMFBESS2 | SMFBESS2 |
SA1 | $-3 | $0 | — | -1.1 | — | -0.2% | $1.50 | View | |
| Torrens Island BESS | TIB1 |
SA1 | Storage - Battery | $-4 | $0 | — | -5.4 | — | -1.1% | $1.50 | View |
| SMFBESS1 | SMFBESS1 |
SA1 | $-4 | $0 | — | -1.1 | — | -0.2% | $1.50 | View | |
| Riverina Energy Storage System 2 | RIVNB2 |
NSW1 | Storage - Battery | $-4 | $0 | — | -0.1 | — | 0.0% | $1.50 | View |
| Quorn Park Solar Hybrid | QPSFB2 |
NSW1 | Storage - Battery | $-4 | $0 | — | -0.1 | — | -0.1% | $1.58 | View |
| Dalrymple BESS | DALNTH1 |
SA1 | Storage - Battery | $-5 | $0 | — | -5.6 | — | -9.7% | $2.03 | View |
| Blyth BESS | BLYTHB1 |
SA1 | Storage - Battery | $-6 | $0 | — | -8.3 | — | -2.2% | $4.86 | View |
| Queanbeyan BESS | QBYNB1 |
NSW1 | Storage - Battery | $-7 | $0 | — | -0.1 | — | -0.4% | $1.50 | View |
| Clements Gap - BESS | CGBESS01 |
SA1 | Storage - Battery | $-9 | $0 | — | -5.5 | — | -4.8% | $1.58 | View |
| Hughenden Sun Farm | HUGSF1 |
QLD1 | Solar PV - Single axis tracking | $-10 | $0 | — | -0.1 | — | -0.4% | $0.00 | View |
| Tarong BESS - Stanwell | TARBESS1 |
QLD1 | Storage - Battery | $-11 | $0 | — | -0.1 | — | 0.0% | $1.50 | View |
| Terang BESS | TRGBESS1 |
VIC1 | Storage - Battery | $-15 | $0 | — | -1.3 | — | -0.7% | $1.50 | View |
| Quorn Park Solar Hybrid | QPSFB1 |
NSW1 | Solar PV - Single axis tracking | $-22 | $0 | — | -0.3 | — | -0.2% | $0.26 | View |
| Victorian Big Battery | VBB1 |
VIC1 | Storage - Battery | $-29 | $0 | — | -4.3 | — | -0.7% | $1.50 | View |
| NESBESS2 | NESBESS2 |
NSW1 | $-32 | $0 | — | -0.4 | — | -0.1% | $1.50 | View | |
| Wallgrove Grid Battery project | WALGRV1 |
NSW1 | Storage - Battery | $-50 | $0 | — | -0.6 | — | -0.6% | $1.50 | View |
| NESBESS1 | NESBESS1 |
NSW1 | $-63 | $0 | — | -0.8 | — | -0.2% | $1.50 | View | |
| Condong | CONDONG1 |
NSW1 | Turbine - Steam Sub Critical | $-66 | $0 | — | -0.9 | — | -1.5% | $112.12 | View |
| Williamsdale BESS | WILLBES1 |
NSW1 | Storage - Battery | $-111 | $0 | — | -1.3 | — | -0.3% | $1.50 | View |
| Rocky Point Sugar Mill Cogeneration Plant | RPCG |
QLD1 | Other - Other | $-120 | $0 | — | -1.4 | — | -2.5% | $117.00 | View |
| Brendale BESS | BRNDBES1 |
QLD1 | Storage - Battery | $-137 | $0 | — | -1.6 | — | -0.4% | $1.58 | View |
| Wandoan South BESS | WANDB1 |
QLD1 | Storage - Battery | $-164 | $0 | — | -2.0 | — | -1.0% | $1.50 | View |
| Swanbank BESS | SWANBBF1 |
QLD1 | Storage - Battery | $-272 | $0 | — | -3.3 | — | -0.7% | $1.50 | View |
| Eraring Big Battery | ERB01 |
NSW1 | Storage - Battery | $-279 | $0 | — | -3.2 | — | -0.7% | $1.58 | View |
| Bouldercombe Battery project | BBATTERY1 |
QLD1 | Storage - Battery | $-302 | $0 | — | -4.0 | — | -4.2% | $1.64 | View |
| Supernode BESS | SNB01 |
QLD1 | Storage - Battery | $-316 | $0 | — | -3.8 | — | -0.8% | $1.50 | View |
| Capital Battery | CAPBES1 |
NSW1 | Storage - Battery | $-442 | $0 | — | -4.8 | — | -2.5% | $1.50 | View |
| Supernode BESS | SNB02 |
QLD1 | Storage - Battery | $-544 | $0 | — | -6.5 | — | -1.3% | $1.50 | View |
| Western Downs Battery - Stage 1 And 2 | WDBESS1 |
QLD1 | Storage - Battery | $-669 | $0 | — | -8.3 | — | -1.7% | $1.58 | View |
| Western Downs Gas Peaking Plant - KCI | WDBESS2 |
QLD1 | Turbine - CCGT | $-1.5k | $0 | — | -19.1 | — | -2.5% | $2.00 | View |