Browse proposed, committed, and other pre-operating generation projects across the NEM.
904 pre-operating projects across the NEM
| Site | Owner | Status | Tech Type | Fuel Type | DUID | Capacity | Commissioned | |
|---|---|---|---|---|---|---|---|---|
| Abermain BESS | FIrm Power P/L | Publicly Announced | Storage - Battery | Other - Other | 168/250 MW | — | View | |
| Alberton Wind Farm | Synergy Wind Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 122 MW | — | View | |
| Aldoga BESS Stage 1 | Acciona Energy Australia Global | Anticipated | Storage - Battery | Other - Other | 400/400 MW | Dec 2027 | View | |
| Aldoga Solar Farm | Acciona Energy Australia Global Pty Ltd | Anticipated | Solar PV - Single axis tracking | Solar - Solar | ALDGASF1 | 387 MW | Jun 2026 | View |
| Alligator Creek BESS | Alligator Creek BESS Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 120 MW | — | View | |
| Altona BESS | Ausnet Transmission Group Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 100/200 MW | Oct 2027 | View | |
| Apsley BESS Project | ACENergy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 120/260 MW | — | View | |
| Aquila Wind | ACEN Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 200 MW | — | View | |
| Aramara Solar Farm | Aramara Solar Pty Ltd | Anticipated | Solar PV - Single axis tracking | Solar - Solar | 101 MW | Dec 2026 | View | |
| Ardandra Solar Farm And BESS | Ardandra SF Pty Ltd as trustee for Ardandra SF Trust | Publicly Announced | Storage - Battery | Solar - Solar | 75/150 MW | — | View | |
| Ardandra Solar Farm And BESS | Ardandra SF Pty Ltd as trustee for Ardandra SF Trust | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 97 MW | — | View | |
| Argoon Wind Farm (RES Group) - KCI | RES Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 612 MW | — | View | |
| Argyle Solar Farm | Argyle Solar Farm Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 60 MW | — | View | |
| Armidale BESS | VALENT ENERGY DEVELOPMENTS PTY LTD | Publicly Announced | Storage - Battery | Other - Other | 150/300 MW | May 2026 | View | |
| Armidale BESS (Elgin) | Elgin EnergyP/L | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| Armidale East BESS | FRV | Publicly Announced | Storage - Battery | Other - Other | 449/1712 MW | — | View | |
| Arundel BESS | Eku Energy Projects (Australia) Trust | Publicly Announced | Storage - Battery | Other - Other | 300/1200 MW | — | View | |
| Augusta BESS | Augusta BESS Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 270/540 MW | — | View | |
| Aurora Solar Energy Project - Phase 1 | SiliconAurora | Publicly Announced | Storage - Battery | Other - Other | 140/140 MW | — | View | |
| Australia Plains Solar Farm | Gree | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 200 MW | — | View | |
| Awaba BESS | firmpower_NR | Publicly Announced | Storage - Battery | Other - Other | 67/100 MW | — | View | |
| Axedale Solar Farm | UPC Renewables Australia | Publicly Announced | Storage - Battery | Other - Other | 50/100 MW | — | View | |
| Axedale Solar Farm | UPC Renewables Australia | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 140 MW | — | View | |
| Bairnsdale BESS | Bison Energy | Publicly Announced | Storage - Battery | Other - Other | 65/260 MW | — | View | |
| Baking Board Battery Storage - KCI | Solar Projects Australia Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 400 MW | — | View | |
| Baking Board BESS (MMT) | MMT Projects T/A Renewable Projects Management | Publicly Announced | Storage - Battery | Other - Other | 300 MW | — | View | |
| Baking Board Solar Farm - KCI | Solar Projects Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 250 MW | — | View | |
| Baking Board Solar Farm (MMT) | MMT Projects T/A Renewable Projects Management | Publicly Announced | Solar PV - Fixed | Solar - Solar | 300 MW | — | View | |
| Baldon Wind Farm | Baldon Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 360 MW | — | View | |
| Baldon Wind Farm Stage 2 - BESS | Baldon Wind Farm Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 500/1000 MW | — | View | |
| Banana Range Wind Farm | Orange Creek Energy Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 228 MW | Dec 2026 | View | |
| Banksia Solar Farm | Venn Energy Pty / Banksia Solar Project Pty Ltd | Anticipated | Solar PV - Single axis tracking | Solar - Solar | 70 MW | Jan 2028 | View | |
| Bannaby BESS | Penso Power Australia Pty Ltd. | Publicly Announced | Storage - Battery | Other - Other | 700 MW | — | View | |
| Baranduda Electrical Energy Reserve | Birdwood Energy Reserve Pty Ltd (ACN 658 507 441) as Trustee for Birdwood Energy Reserve Trust | Publicly Announced | Storage - Battery | Other - Other | BEER01 | 544/1800 MW | Jun 2027 | View |
| Barker Inlet Power Station 2 | AGL Energy Limited | Publicly Announced | Turbine - OCGT | Fossil - Natural Gas Pipeline | 280 MW | — | View | |
| Barn Hill | Barn HIll Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 186 MW | — | View | |
| Barn Hill BESS | AGL Energy Limited | Publicly Announced | Storage - Battery | Other - Other | 270/1080 MW | — | View | |
| Barnawartha Solar & Energy Storage | Barnawartha Solar Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 64/6 MW | — | View | |
| Barnawartha Solar & Energy Storage | Barnawartha Solar Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 64 MW | — | View | |
| Baroota Pumped Hydro Project | ACEN Renewables | Publicly Announced | Hydro - Dam | Hydro - Water | 250 MW | Dec 2025 | View | |
| Barwon Solar Farm & BESS | Elgin Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 250/500 MW | — | View | |
| Barwon Solar Farm & BESS | Elgin Energy Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 250 MW | — | View | |
| Bashan 1 Wind Farm | Goldwind Australia | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 460 MW | — | View | |
| Bass Offshore Wind Energy Project | Nexsphere Pty Ltd | Publicly Announced | Wind Turbine - Offshore | Wind - Wind | 500 MW | — | View | |
| Battery of the Nation - Stage 2b | Hydro Tasmania | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 750/12000 MW | — | View | |
| Battery of the Nation - Stage 3b | Hydro Tasmania | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 750/12000 MW | — | View | |
| Beebo Battary - KCI | BEEBO SOLAR FARM PTY LTD as Trustee For BEEBO SOLAR FARM UNIT TRUST | Publicly Announced | Storage - Battery | Other - Other | 585/800 MW | — | View | |
| Beebo Solar Farm - KCI | BEEBO SOLAR FARM PTY LTD as Trustee For BEEBO SOLAR FARM UNIT TRUST | Publicly Announced | Solar PV - Fixed | Solar - Solar | 528 MW | — | View | |
| Beelbee Solar Farm | Darling Downs Solar Farm Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 200 MW | — | View | |
| Belhaven Renewable Project | Vena Energy Services (Australia) Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 408/816 MW | — | View | |
| Belhaven Renewable Project | Vena Energy Services (Australia) Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 166 MW | — | View | |
| Bell Bay BESS | Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy(Australia) Ngumi 6 Asset Trust | Publicly Announced | Storage - Battery | Other - Other | 100/200 MW | — | View | |
| Bellambi Heights Renewables Project | Vena Energy | Publicly Announced | Storage - Battery | Other - Other | 408/816 MW | — | View | |
| Bellbay Wind Farm (Low Heads Wind Farm Stage 2) | The Trustee for Equis Wind (Australia) LHWF2 Asset Trust | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 224 MW | Sep 2029 | View | |
| Ben Bullen BESS | Tetris Energy | Publicly Announced | Storage - Battery | Other - Other | 200/800 MW | — | View | |
| Bendemeer Renewable Energy Hub - Solar - KCI | Athena Energy Australia (Holdings) Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 218 MW | — | View | |
| Bendemeer Renewable Energy Hub - Storage - KCI | Athena Energy Australia (Holdings) Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 100 MW | — | View | |
| Bendemeer Renewable Energy Hub - Wind - KCI | Athena Energy Australia (Holdings) Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 380 MW | — | View | |
| Bennetts Creek BESS | Aries Energy Project Pty Ltd in its capacity as Trustee for the Aries Energy Project Trust | Publicly Announced | Storage - Battery | Other - Other | 100/200 MW | — | View | |
| Beresfield BESS | firmpower_NR | Publicly Announced | Storage - Battery | Other - Other | 226/340 MW | — | View | |
| Berrybank 1 BESS - Storage - KCI | Global Power Generation Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 60/120 MW | — | View | |
| Beryl BESS | Ratch-Australia Corporation | Publicly Announced | Storage - Battery | Other - Other | 100/200 MW | — | View | |
| BESS Finley | BESS Finley P/L | Publicly Announced | Storage - Battery | Other - Other | 100 MW | — | View | |
| Big G Pumped Hydro Project | BE Power | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 800/9600 MW | — | View | |
| Big-T Project | BE Power | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 400/4000 MW | — | View | |
| Birkins Solar Farm - Storage - KCI | FRV Services Australia Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | BIRKBESS | 200/400 MW | — | View |
| Birriwa BESS | ACEN RENEWABLES | Publicly Announced | Storage - Battery | Solar - Solar | 600/600 MW | — | View | |
| Birriwa Solar Farm | ACEN RENEWABLES | Publicly Announced | Solar PV - Fixed | Solar - Solar | 600 MW | — | View | |
| Blackstone BESS | FIrm Power P/L | Publicly Announced | Storage - Battery | Other - Other | 331/500 MW | — | View | |
| Blackstone BESS 2 - KCI | FIrm Power P/L | Publicly Announced | Storage - Battery | Other - Other | 331/500 MW | — | View | |
| Blacktop BESS - KCI | BESS Officer Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 100 MW | — | View | |
| Blackwater Hybrid System | Blackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust | Publicly Announced | Storage - Battery | Solar - Solar | 200/400 MW | Jun 2029 | View | |
| Blackwater Hybrid System | Blackwater Project Nominees Pty Ltd as trustee for the Blackwater Project Trust | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 170 MW | Jun 2029 | View | |
| Blair Athol Solar Power Station | TerraCom Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 60 MW | — | View | |
| Blanche BESS - KCI | Blanche BESS Pty Ltd as trustee for Blanche BESS Trust | Publicly Announced | Storage - Battery | Other - Other | 128 MW | — | View | |
| Blenheim BESS - KCI | Gatton Solar Farm Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 29 MW | — | View | |
| Blenheim Solar Farm - KCI | Gatton Solar Farm Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 106 MW | — | View | |
| Blind Creek Solar Farm and Battery Energy Storage System | Ms BCSF Holdings Pty Ltd as trustee for the Blind Creek Solar Farm Trust | Publicly Announced | Storage - Battery | Solar - Solar | 378/486 MW | — | View | |
| Blind Creek Solar Farm and Battery Energy Storage System | Ms BCSF Holdings Pty Ltd as trustee for the Blind Creek Solar Farm Trust | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 378 MW | — | View | |
| Boco Rock Wind Farm | South Pacific Power Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | BOCOROC2 | 80 MW | — | View |
| Bogandilla Wind Farm | RES Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 530 MW | — | View | |
| Boggabri solar and storage project | Photon Energy | Publicly Announced | Storage - Battery | Solar - Solar | 10/10 MW | — | View | |
| Boiling Down BESS | Hanwha Energy Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 260 MW | — | View | |
| Bonnie Brae Hybrid Plant | Barathrum Energy Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 70/260 MW | — | View | |
| Bonshaw Solar Farm | GAIA Australia Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 100 MW | May 2027 | View | |
| Bookaar Solar Farm | Bookaar Renewables Pty ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 230 MW | — | View | |
| Bookham WF & BESS | Bookham Wind Farm Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 400/400 MW | — | View | |
| Bookham WF & BESS | Bookham Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 760 MW | — | View | |
| Boomer Green Energy Hub | ARK Energy Corporation Pty Ltd | Publicly Announced | Other - Other | Other - Other | 800 MW | — | View | |
| Boort Wind Farm | feraaustralia_nr | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 8 MW | Sep 2031 | View | |
| Boree Solar Project | Venn Energy Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 180 MW | — | View | |
| Boulder Creek Wind Farm | Boulder Creek Wind Farm Pty Ltd as trustee for BCWF Unit Trust ABN and BCWF 2 Pty Limited | Anticipated | Wind Turbine - Onshore | Wind - Wind | 221 MW | — | View | |
| Bouldercombe Battery project - Stage 2 - KCI | Genex Power Limited | Publicly Announced | Storage - Battery | Other - Other | 50/200 MW | — | View | |
| Bouldercombe North BESS - Quintas | Bouldercombe North BESS Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 400/1600 MW | Mar 2027 | View | |
| Boulka Park BESS | The Trustee for X-ELIO BOULKA PARK TRUST | Publicly Announced | Storage - Battery | Other - Other | 250/500 MW | — | View | |
| Boulka Park Solar Farm | The Trustee for X-ELIO BOULKA PARK TRUST | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 100 MW | — | View | |
| Bowen Basin Sun Farm - KCI | Bowen Basin Sun Farm Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 130 MW | — | View | |
| Bowen PHES - KCI | Blue Hydro Project Pty Ltd | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 750/18000 MW | — | View | |
| Bowmans Creek Wind Farm | ARK Energy Corporation Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 347 MW | — | View | |
| Bracewell Energy Park | TE H2 Australia | Publicly Announced | Storage - Battery | Solar - Solar | 200/350 MW | Jul 2031 | View | |
| Bracewell Energy Park | TE H2 Australia | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 500 MW | Jul 2031 | View | |
| Braemar BESS | Braemar Power Project Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 500 MW | — | View | |
| Bremer Battery 1 | Libra Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 212 MW | — | View | |
| Bremer Battery 2 | Libra Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 212 MW | — | View | |
| Bremer Battery 3 | Libra Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 212 MW | — | View | |
| Bremer Battery 4 | Libra Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 212 MW | — | View | |
| Brendale BESS | Brendale Battery ProjectCo Pty Lt | Committed | Storage - Battery | Other - Other | 205/410 MW | Jun 2026 | View | |
| Brewongle Solar Farm | Edify Energy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 100 MW | — | View | |
| Bridle Track Solar Project | ACEN Renewables | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 300 MW | — | View | |
| Brigalow GT (Kogan Creek GT) | CSE H2 Pty Ltd | Publicly Announced | Turbine - OCGT | Fossil - Natural Gas | 400 MW | Dec 2028 | View | |
| Brinkworth BESS | Brinkworth Solar Farm Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 250/1000 MW | — | View | |
| Broadsound Solar Farm | Broadsound Solar Farm Pty Ltd | Committed | Solar PV - Single axis tracking | Solar - Solar | 368 MW | Jan 2027 | View | |
| Broadsound_BESS | Broadsound Solar Farm Pty Ltd | Anticipated | Storage - Battery | Other - Other | 240/360 MW | Jan 2027 | View | |
| Broken Creek Solar Farm - KCI | BSR EPC Pty Limited | Publicly Announced | Solar PV - Fixed | Solar - Solar | 173 MW | — | View | |
| Bullawah Wind Farm – Stage 1 | Bullawah Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 314 MW | — | View | |
| Bulli Creek Battery | Genex Power Limited | Publicly Announced | Storage - Battery | Other - Other | 400/1600 MW | — | View | |
| Bulli Creek BESS (Trina) | Bulli Creek Hybrid Nominee Pty Ltd on behalf of Bulli Creek Hybrid Trust | Publicly Announced | Storage - Battery | Other - Other | 450/900 MW | — | View | |
| Bulli Creek Solar Farm | Genex Power Limited | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 675 MW | — | View | |
| Bulli Creek Solar Farm (Trina) | Bulli Creek Hybrid Nominee Pty Ltd on behalf of Bulli Creek Hybrid Trust | Publicly Announced | Solar PV - Fixed | Solar - Solar | 450 MW | — | View | |
| Bullyard Solar Farm | EE Solar 9 Pty Ltd as trustee for the EE Solar 9 Trust | Anticipated | Solar PV - Single axis tracking | Solar - Solar | 97 MW | — | View | |
| Bundaberg Renewable Energy Park | Bundaberg Renewable Energy Park | Publicly Announced | Storage - Battery | Other - Other | 500 MW | — | View | |
| Bundaberg Solar Farm | Bundaberg Development Pty Ltd | Committed | Solar PV - Single axis tracking | Solar - Solar | 78 MW | Dec 2025 | View | |
| Bundey BESS and Solar Project | Genaspi Energy Group Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 300/1200 MW | — | View | |
| Bundey BESS and Solar Project | Genaspi Energy Group Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 475 MW | — | View | |
| Bundy Energy Hub A (BESS) | Syn-Co Global | Publicly Announced | Storage - Battery | Other - Other | 250 MW | — | View | |
| Bundy Energy Hub B (BESS) | SynCo Global | Publicly Announced | Storage - Battery | Other - Other | 250 MW | — | View | |
| Bungaban BESS | Windlab Developments Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 350/1400 MW | — | View | |
| Bungama BESS (ARENA ) | Bungama Bess Trust | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | — | View | |
| Bungama Solar | Bungama Project (Solar) Operations Pty Ltd | Committed | Storage - Battery | Other - Other | 150/300 MW | Apr 2026 | View | |
| Bungama Solar | Bungama Project (Solar) Operations Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 280 MW | Aug 2028 | View | |
| Bunkers Hill Pumped Hydro | Pacific Hydro | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 296/7104 MW | Dec 2033 | View | |
| Bunkers Hill Wind Farm | Pacific Hydro | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 7 MW | — | View | |
| Burdekin BESS | BURDEKIN SOLAR FARM PTY LTD ATF BURDEKIN GENESIS PROJECT TRUST | Publicly Announced | Storage - Battery | Other - Other | 500/2000 MW | Sep 2026 | View | |
| Burdekin Solar Farm - KCI | BURDEKIN SOLAR FARM PTY LTD ATF BURDEKIN GENESIS PROJECT TRUST | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 4 MW | Feb 2026 | View | |
| Burgmanns BESS | Burgmanns BESS Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | — | View | |
| Buronga BESS - Storage - KCI | BESS Clyde North Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 300 MW | — | View | |
| Burrenbring Wind Farm | Iberdrola Australia Development Pty Limited | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 360 MW | — | View | |
| Burrendong Wind Farm | ARK Energy Corporation Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 434 MW | — | View | |
| Burroway BESS | Edify Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 100/400 MW | — | View | |
| Bushranger Hybrid Facility - Solar | SynCo Global | Publicly Announced | Solar PV - Fixed | Solar - Solar | 300 MW | — | View | |
| Calala Battery Energy Storage System 1 (CABESS1) | EquisEquis Energy (Australia) Projects (Ngumi 4) Pty Ltd | Anticipated | Storage - Battery | Other - Other | 150/300 MW | Feb 2027 | View | |
| Calala Battery Energy Storage System 2 (CABESS2) | EquisEquis Energy (Australia) Projects (Ngumi 4) Pty Ltd | Anticipated | Storage - Battery | Other - Other | 150/300 MW | Apr 2027 | View | |
| Callide Energy Hub - KCI | CSE BESS P/L | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| Callide Gas Peaker - KCI | CSE H2 Pty Ltd | Publicly Announced | Turbine - Other | Other - Other | 750 MW | — | View | |
| Callide Power Station Solar Farm | Edify Energy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 200 MW | — | View | |
| Callide Solar Power Station BESS | Edify Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 210/200 MW | — | View | |
| Callide Wind Farm | DP Green Energy Pty Limited | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 422 MW | — | View | |
| Calliope BESS | ekuenergy_nr | Publicly Announced | Other - Other | Other - Other | 300 MW | — | View | |
| Calvale BESS | Lightsource BP | Publicly Announced | Storage - Battery | Other - Other | 500 MW | — | View | |
| Calvale LDES BESS | Released Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 450 MW | — | View | |
| Calvale Solar Farm | Lightsource BP | Publicly Announced | Solar PV - Fixed | Solar - Solar | 500 MW | — | View | |
| Campbells Forest Solar Farm | 4067 Pyramid Development Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 205 MW | — | View | |
| Camperdown BESS - Quintas | Camperdown BESS Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 75/150 MW | Dec 2026 | View | |
| Canyonleigh BESS | X-Elio Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 300/1200 MW | — | View | |
| Capital 2 Wind Farm | Capital Wind Farm 2 Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 134 MW | — | View | |
| Capricorn BESS - KCI | ENEL Green Power Australia | Publicly Announced | Storage - Battery | Other - Other | 704/2000 MW | Dec 2027 | View | |
| Capricornia Energy Hub (CEH) PHES | CI QLD PHES PTY LTD | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 750/12000 MW | Dec 2031 | View | |
| Captains Mountain Wind Farm | vestas_NR | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 217 MW | Dec 2029 | View | |
| Carag Solar Farm | Enerparc Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 16 MW | Mar 2025 | View | |
| Carmody's Hill BESS | Georgetown Hills Renewable Energy Pty Ltd as trustee for the Georgetown Hills Renewable Energy Trust | Publicly Announced | Storage - Battery | Other - Other | 118/240 MW | Jan 2029 | View | |
| Carmody's Hill Wind Farm | Georgetown Hills Renewable Energy Pty Ltd as trustee for the Georgetown Hills Renewable Energy Trust | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 247 MW | Jan 2029 | View | |
| Carwarp BESS | Canadian Solar | Publicly Announced | Storage - Battery | Other - Other | 30 MW | — | View | |
| Carwarp Solar Farm - Stage I | Canadian Solar (Australia) Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 150 MW | — | View | |
| Carwarp Solar Farm - Stage II | Canadian Solar (Australia) Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 150 MW | — | View | |
| Cattle Creek Wind Farm - KCI | RWE Renewables Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| Cattle Creek Wind Farm - KCI | RWE Renewables Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 798 MW | — | View | |
| Ceduna BESS | tetrisenergy_nr | Publicly Announced | Storage - Battery | Other - Other | 25/200 MW | — | View | |
| Ceduna Solar Farm | tetrisenergy_nr | Publicly Announced | Solar PV - Fixed | Solar - Solar | 200 MW | — | View | |
| Ceduna Wind Farm | tetrisenergy_nr | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 400 MW | — | View | |
| Central Para Wind Farm (KCI) | Macleay Ventures Pty Ltd. | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 399 MW | — | View | |
| Central West Pumped Hydro | ATCO Australia Pumped Hydro Pty Ltd | Publicly Announced | Hydro - Dam | Hydro - Water | 325 MW | — | View | |
| Cethana Pumped Hydro Option | Hydro-Electric Corporation | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 750/15000 MW | — | View | |
| Chances Plain Solar Farm | juwi Renewable Energy Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 98 MW | — | View | |
| Chinchilla Solar Farm | First Solar Australia Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 113 MW | — | View | |
| Chipping Norton Waste to Energy | Benedict Indistries P/L | Publicly Announced | Turbine - Steam Sub Critical | Other - Other | 8 MW | — | View | |
| Cimitiere Plains Solar Farm | Sun Spot 9 Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 288 MW | — | View | |
| Clarke Creek 2 BESS - KCI | Isaac Wind and Solar Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 0 MW | — | View | |
| Clarke Creek Wind Farm Stage 2 | Squadron Energy Services Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 696 MW | — | View | |
| Clements Gap - BESS | Pacific Hydro Clements Gap Pty Ltd | Committed | Storage - Battery | Other - Other | 60/120 MW | May 2026 | View | |
| Cobbora BESS | Pacific Partnerships | Publicly Announced | Storage - Battery | Other - Other | 521/800 MW | — | View | |
| Cobbora Solar Farm | pacificp_NR | Publicly Announced | Solar PV - Fixed | Solar - Solar | 818 MW | — | View | |
| Cobden BESS - Quintas | Cobden BESS Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 60/240 MW | Dec 2025 | View | |
| Coleambally BESS | Coleambally BESS Trust | Publicly Announced | Storage - Battery | Other - Other | 100/400 MW | — | View | |
| Collinsville Coal Fired Power Station Project - KCI | Shine Energy | Publicly Announced | Other - Other | Fossil - Black Coal | 990 MW | — | View | |
| Collinsville North Battery Project | TBSOL | Publicly Announced | Storage - Battery | Other - Other | 100/100 MW | Dec 2026 | View | |
| Colosseum Solar Farm | Global Power Generation Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 400 MW | — | View | |
| Columboola BESS | Columboola BESS Nominees Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 700 MW | — | View | |
| Columboola BESS - KCI | StorEnergy P/L | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Comet Energy Park | Comet Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 120/800 MW | — | View | |
| Comet Park BESS - KCI | Samsung C&T Renewable Energy Australia Pty Ltd. | Publicly Announced | Storage - Battery | Other - Other | 189/600 MW | — | View | |
| Connewarren BESS | Akaysha Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 550/2200 MW | — | View | |
| Conroys Gap WF - KCI | Waldren Construction Pty Ltd. | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 30 MW | — | View | |
| Cooba Solar Farm - KCI | Venn Energy Pty Ltd / Cooba Solar Project Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 319 MW | — | View | |
| Cooma Hybrid BESS and Solar Farm (ACEN) | ACEN RENEWABLES | Publicly Announced | Storage - Battery | Other - Other | 80/160 MW | Jul 2028 | View | |
| Cooma Hybrid BESS and Solar Farm (ACEN) | ACEN RENEWABLES | Publicly Announced | Solar PV - Fixed | Solar - Solar | 100 MW | Mar 2028 | View | |
| Cooma Solar And BESS (ACEN) | ACEN RENEWABLES | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 100 MW | — | View | |
| Cooma Solar And BESS (ACEN) | ACEN RENEWABLES | Publicly Announced | Storage - Battery | Other - Other | 80/160 MW | — | View | |
| Cooma Solar Farm (Lightsource) | Lightsource Development Services Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 100 MW | — | View | |
| Cooroy BESS | Enervest Operations Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 100/400 MW | — | View | |
| Coppabella Wind Farm | Coppabella Wind Farm Pty Ltd | Anticipated | Wind Turbine - Onshore | Wind - Wind | COPBEL | 290 MW | Sep 2027 | View |
| Corop BESS | Leeson Solar Pty Ltd. | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Corop Solar Farm | Leeson Solar Pty Ltd. | Publicly Announced | Solar PV - Fixed | Solar - Solar | 400 MW | — | View | |
| Cranbourne BESS (Macquarie) | Macquarie Corporate Holdings Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 150 MW | — | View | |
| Cross Roads Energy Solar Farm - KCI | Crossroads Energy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 650 MW | — | View | |
| Croydon Hybrid Facility - Solar And BESS | ACEnergy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 500 MW | — | View | |
| Croydon Hybrid Facility - Solar And BESS | ACEnergy Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 500 MW | — | View | |
| Cultana Solar Farm | Cultana Solar Project Company Pty Ltd as trustee for the Cultana Solar Farm Trust | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 357 MW | Dec 2029 | View | |
| Dalby Solar Farm | Dalby Asset Trust | Publicly Announced | Solar PV - Fixed | Solar - Solar | 5 MW | — | View | |
| Dalvui BESS | Tilt Renewables Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 250/500 MW | — | View | |
| Dapper Solar Farm | BORAL | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 4 MW | — | View | |
| Darling Downs Battery | BORAL | Publicly Announced | Storage - Battery | Other - Other | 250/500 MW | Dec 2026 | View | |
| Darling Downs BESS (APA) | APA Group | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| Darling Downs Power Station 2 | Origin Energy | Publicly Announced | Turbine - OCGT | Geothermal - Other | 500 MW | — | View | |
| Darlington Wind Farm - GPG | globalpower-generation_NR | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 360 MW | — | View | |
| Darnum BESS | samsung_NR | Publicly Announced | Storage - Battery | Other - Other | 240/800 MW | — | View | |
| Daroobalgie Solar Farm | Pacific Hydro Australia Developments Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 100 MW | Dec 2032 | View | |
| Davenport BESS | Green Gold Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 270/540 MW | — | View | |
| Dawson Wind Farm | Highland Energy Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 560 MW | — | View | |
| Deargee Solar And BESS | ACEN Renewables | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 320 MW | — | View | |
| Deargee Solar And BESS | ACEN Renewables | Publicly Announced | Storage - Battery | Other - Other | 700/700 MW | — | View | |
| Dederang BESS | Mint Renewables | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | — | View | |
| Deepwater BESS | Ib vogt Development Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 140/560 MW | — | View | |
| Deepwater Solar Farm | Ib vogt Development Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 140 MW | — | View | |
| Delburn Wind Farm | Delburn Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 218 MW | — | View | |
| Deniliquin BESS - Storage - KCI | Enervest Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 150 MW | — | View | |
| Deniliquin East BESS | BESS Arctic Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 100/200 MW | Mar 2026 | View | |
| Derby Solar Farm & BESS | DERBY SOLAR PROJECT PTY LTD | Publicly Announced | Storage - Battery | Solar - Solar | 95/110 MW | Sep 2027 | View | |
| Derby Solar Farm & BESS | DERBY SOLAR PROJECT PTY LTD | Anticipated | Solar PV - Single axis tracking | Solar - Solar | 95 MW | Sep 2027 | View | |
| Derwent Valley Wind Farm | West Coast Renewable Energy | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 150 MW | — | View | |
| Devlins Bridge Battery Storage | Devlins Bridge Wind Farm Holdco Pty Ltd | Publicly Announced | Storage - Battery | Wind - Wind | 600 MW | — | View | |
| Devlins Wind Farm | Devlins Bridge Wind Farm Holdco Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 663 MW | — | View | |
| Dinawan Energy Hub | Spark Renewables Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 300/1200 MW | Dec 2030 | View | |
| Dinawan Energy Hub | Spark Renewables Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 300 MW | Dec 2030 | View | |
| Dinawan Energy Hub | Spark Renewables Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 403 MW | Apr 2031 | View | |
| Dingo Solar Farm | ESCO Pacific | Publicly Announced | Solar PV - Fixed | Solar - Solar | 85 MW | — | View | |
| Direk BESS | BESS DIREK PTY LTD | Publicly Announced | Storage - Battery | Other - Other | 20/40 MW | — | View | |
| Doreen BESS | BZ Renewables Holdings Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 800 MW | — | View | |
| Dugald River Wind Faarm | MMG | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 144 MW | — | View | |
| Dumaresq Solar Farm | Dumaresq Solar Farm Pty Limited | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 188 MW | — | View | |
| Dunedoo Solar Farm | ib vogt GmbH / Sun Spot 4 | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 55 MW | — | View | |
| Dungowan 3 000 MWH PHES | Dungowan Pumped Hydro Pty Ltd | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 300/3000 MW | Mar 2030 | View | |
| Dunmore BESS | Samsung C&T | Publicly Announced | Storage - Battery | Other - Other | 227/300 MW | — | View | |
| Dunmore Solar Farm | Samsung C&T | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 361 MW | — | View | |
| East End BESS | TE H2 Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 500 MW | — | View | |
| Ebor BESS | Bridge Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 100 MW | — | View | |
| Edderton Hybrid Faciility - Solar | Voltere Pty Ltd. | Publicly Announced | Solar PV - Fixed | Solar - Solar | 350 MW | — | View | |
| Edderton Hybrid Facility - BESS | Voltere Pty Ltd. | Publicly Announced | Storage - Battery | Other - Other | 350 MW | — | View | |
| EIWA Gin Gin Renewable Energy Park | EIWA Gin Gin Renewable Energy Park Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 248 MW | — | View | |
| EIWA Gin Gin Renewable Energy Park | EIWA Gin Gin Renewable Energy Park Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 250/1000 MW | — | View | |
| EIWA Golden Fleece Renewable Energy Park | EIWA Golden Fleece Renewable Energy Park Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 299 MW | — | View | |
| EIWA Golden Fleece Renewable Energy Park | EIWA Golden Fleece Renewable Energy Park Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 300/1200 MW | — | View | |
| EIWA Richmond Valley BESS | EIWA RICHMOND VALLEY BESS PTY LTD | Publicly Announced | Storage - Battery | Other - Other | 300/1200 MW | — | View | |
| Elai Genesis Battery Storage System | Elai Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 120 MW | — | View | |
| Elaine BESS | Elaine ProjectCo Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 311/1244 MW | — | View | |
| Elaine Solar Farm & BESS Hybrid | Elgin Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 125/250 MW | — | View | |
| Elaine Solar Farm & BESS Hybrid | Elgin Energy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 125 MW | — | View | |
| Emeroo BESS | Potentia Energy Group Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 61/80 MW | — | View | |
| Emu Park BESS | M Renweables Australia | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| Emu Park Solar Farm | M Renweables Australia | Publicly Announced | Solar PV - Fixed | Solar - Solar | 300 MW | — | View | |
| Eurimbula Hybrid Facility - Battery Storage | unitedgreen_NR | Publicly Announced | Storage - Battery | Other - Other | 666/666 MW | Jun 2026 | View | |
| Eurimbula Solar Farm | Unitedgreen_NR | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 4 MW | — | View | |
| Euston Wind Farm - KCI | Balranald Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 330 MW | — | View | |
| Everleigh Solar Farm & BESS - KCI | Everleigh Solar Park Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 0 MW | — | View | |
| Everleigh Solar Farm & BESS - KCI | Everleigh Solar Park Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 200 MW | — | View | |
| Fletcher Creek Wind Farm & BESS | Private Energy Partners | Publicly Announced | Storage - Battery | Other - Other | 250/250 MW | — | View | |
| Fletcher Creek Wind Farm & BESS | Private Energy Partners | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 400 MW | — | View | |
| FNQ BESS 1 (KCI) | Solquartz Holdings Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 250 MW | — | View | |
| FNQ BESS 2 (KCI) | Solquartz Holdings Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 250 MW | — | View | |
| FNQ BESS 3 (KCI) | Solquartz Holdings Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 250 MW | — | View | |
| Forbes Solar Farm & BESS | Forbes Solar Farm Pty Ltd ATF Forbes Genesis Project Trust | Publicly Announced | Storage - Battery | Other - Other | 4/480 MW | — | View | |
| Forbes Solar Farm & BESS | Forbes Solar Farm Pty Ltd ATF Forbes Genesis Project Trust | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 5 MW | — | View | |
| Forest Glen Solar Farm | X-Elio Roma Hub Solar Farm Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 90 MW | — | View | |
| Forsayth Wind Farm | Forsayth Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 165 MW | — | View | |
| Fosterville SF and BESS | FRV Services Australia | Publicly Announced | Storage - Battery | Other - Other | FTVBESS | 119/240 MW | — | View |
| Fosterville SF and BESS | FRV Services Australia | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | FTVPV | 81 MW | — | View |
| Fraser Coast Hybrid Plant | FRASER COAST SOLAR DEVELOPMENT PTY LTD | Publicly Announced | Storage - Battery | Other - Other | 211/211 MW | — | View | |
| Fraser Coast Hybrid Plant | FRASER COAST SOLAR DEVELOPMENT PTY LTD | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 311 MW | — | View | |
| Frasers Solar Farm | Frasers Lane Development Pty Ltd | Anticipated | Solar PV - Single axis tracking | Solar - Solar | 77 MW | Oct 2025 | View | |
| Ganymirra Solar Power Station | Edify Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 150/600 MW | — | View | |
| Ganymirra Solar Power Station | Edify Energy Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 150 MW | — | View | |
| Gara BESS | ACEnergy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 521/1600 MW | Dec 2027 | View | |
| Garoo BESS | Greenpulse solar farm and BESS as trustee for Greenpulse Solar Farm & Bess Unit Trust | Publicly Announced | Storage - Battery | Other - Other | 540/720 MW | — | View | |
| Garoo Solar Farm | Greenpulse solar farm and BESS as trustee for Greenpulse Solar Farm & Bess Unit Trust | Publicly Announced | Solar PV - Fixed | Solar - Solar | 167 MW | — | View | |
| Geelong BESS | Elgin EnergyP/L | Publicly Announced | Storage - Battery | Other - Other | 250 MW | — | View | |
| George Town BESS - KCI | Recurrent Energy | Publicly Announced | Storage - Battery | Other - Other | 350 MW | — | View | |
| George Town Wind Farm | West Coast Renewables | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 232 MW | — | View | |
| Geranium Plains Solar and BESS | Risen Energy (Australia) Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 150/450 MW | — | View | |
| Geranium Plains Solar and BESS | Risen Energy (Australia) Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 250 MW | — | View | |
| Gerogery Battery - KCI | Elgin Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 125 MW | — | View | |
| Gerogery Solar Farm - KCI | Elgin Energy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 125 MW | — | View | |
| Gin Gin BESS | Iberdrola Australia Development Pty Limited | Publicly Announced | Storage - Battery | Other - Other | 346/530 MW | — | View | |
| Glanmire Solar Farm | Elgin Energy Pty Ltd | Anticipated | Storage - Battery | Other - Other | 52/104 MW | — | View | |
| Glanmire Solar Farm | Elgin Energy Pty Ltd | Anticipated | Solar PV - Single axis tracking | Solar - Solar | 60 MW | — | View | |
| Glen Inness BESS - KCI | FIrm Power P/L | Publicly Announced | Storage - Battery | Other - Other | 152/400 MW | — | View | |
| Glenbawn Pumped Hydro Project | Water NSW | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 770/7700 MW | — | View | |
| Glenbrae BESS | Acenergy | Publicly Announced | Storage - Battery | Other - Other | 250/250 MW | — | View | |
| Glenellen Solar Farm | Glenellen Solar Farm Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 200 MW | — | View | |
| Glennis Creek Pumped Hydro Project | Water NSW | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 642/6420 MW | — | View | |
| Glenrowan BESS | Akaysha Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 450/1800 MW | — | View | |
| Glenrowan BESS - Storage - KCI | Enervest Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Gnarwarre BESS Facility | FRV SA Pty Ltd | Anticipated | Storage - Battery | Other - Other | 290/550 MW | Jun 2027 | View | |
| Goat Hill Pumped Hydro | Altura Group | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 230/1840 MW | — | View | |
| Gol Gol Wind Farm | Squadron Energy Developments Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 500 MW | — | View | |
| Golden Plains BESS | Tag Energy Australia P/L | Publicly Announced | Storage - Battery | Other - Other | 150/600 MW | — | View | |
| Golden Plains Wind Farm West | Golden Plains WF2 Unit Trust | Committed | Wind Turbine - Onshore | Wind - Wind | 557 MW | Feb 2027 | View | |
| GoodNight Hybrid Facility - Solar And BESS | GoodNight One Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 200 MW | — | View | |
| GoodNight Hybrid Facility - Solar And BESS | GoodNight One Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 200 MW | — | View | |
| Goombi Renewable Energy Hub | Tag Energy Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 657 MW | — | View | |
| Goorambat BESS (Lighthouse) | Lightsource Development Services Australia | Publicly Announced | Storage - Battery | Other - Other | 800 MW | — | View | |
| Goorambat East Solar Farm (ENGIE) | Engie | Committed | Solar PV - Single axis tracking | Solar - Solar | 250 MW | Oct 2026 | View | |
| Goulburn River Solar Farm And BESS | Goulburn River Fund Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 50/400 MW | — | View | |
| Goulburn River Solar Farm And BESS | Goulburn River Fund Pty Ltd | Committed | Solar PV - Single axis tracking | Solar - Solar | 588 MW | Mar 2027 | View | |
| Gould Creek BESS | Valent Energy | Publicly Announced | Storage - Battery | Other - Other | 225 MW | — | View | |
| Goyder BESS | Neoen Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 300 MW | — | View | |
| Goyder North Renewable Energy Facility | Neoen Australia | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 300 MW | Dec 2028 | View | |
| Grahamvale BESS - KCI | AE BESS 3 Pty Ltd as Trustee for AE BESS 3 Unit Trust | Publicly Announced | Storage - Battery | Other - Other | 100 MW | — | View | |
| Granite Hills Wind Farm | Akuo Energy | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 121 MW | — | View | |
| Great Lakes Battery | Neoen Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 100/150 MW | Dec 2028 | View | |
| Great Western Battery Project | Neoen Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 500/2000 MW | Dec 2028 | View | |
| Green Poly BESS Project (KCI) | Solquartz Holdings Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 750 MW | — | View | |
| Gregadoo Solar Farm | Gregadoo Solar Farm Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 45 MW | — | View | |
| Griffith BESS | Eku Energy Projects (Australia) Trust | Publicly Announced | Storage - Battery | Other - Other | 100/800 MW | — | View | |
| Guildford Wind Farm | ARK Energy Corporation Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 526 MW | — | View | |
| Gullen Range Battery Energy System | goldwindaustralia_NR | Publicly Announced | Storage - Battery | Other - Other | 500/500 MW | — | View | |
| Gundary Solar Farm - KCI | Lightsource Development Services Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| Gundary Solar Farm - KCI | Lightsource Development Services Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 400 MW | — | View | |
| Gunnedah BESS | Gunnedah Battery Subco Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 70 MW | — | View | |
| Gunnedah East BESS (Green Leap) - KCI | Green Leap P/L | Publicly Announced | Storage - Battery | Other - Other | 100 MW | — | View | |
| Gunning Solar Farm (Canadian) | Canadian Solar | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| Gunning Solar Farm (Canadian) | Canadian Solar | Publicly Announced | Solar PV - Fixed | Solar - Solar | 294 MW | — | View | |
| Gunsynd Solar Farm | ARP | Publicly Announced | Solar PV - Fixed | Solar - Solar | 94 MW | Dec 2022 | View | |
| Guthrie's Gap Solar Farm | Edify Energy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 300 MW | — | View | |
| Hallett BESS | EnergyAustralia Hallett Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 50/200 MW | — | View | |
| Halys BESS - Iberdrola | IBERDROLA AUSTRALIA DEVELOPMENT PTY LIMITED | Publicly Announced | Storage - Battery | Other - Other | 500/2000 MW | — | View | |
| Halys BESS (X-Elio) | X-Elio Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 300/600 MW | — | View | |
| Halys Hybrid Facility - BESS | Elements Green Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 750 MW | — | View | |
| Halys Hybrid Facility - Solar | Elements Green Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 750 MW | — | View | |
| Halys to Chinchilla DCA Battery - KCI | UGL Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 150 MW | — | View | |
| Hargraves BESS | Tilt Renewables DevCo Pty Ltd as the trustee for Development Hold Trust | Publicly Announced | Storage - Battery | Wind - Wind | 300 MW | — | View | |
| Hargraves Wind Farm | Tilt Renewables DevCo Pty Ltd as the trustee for Development Hold Trust | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 300 MW | — | View | |
| Harlin Solar Farm | Harlin Solar Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 400 MW | — | View | |
| Harlin Solar Farm | Harlin Solar Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 240 MW | — | View | |
| Harrami Wind Farm | Mainstream | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 799 MW | — | View | |
| Harrogate BESS | Enel Green Power Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 270/1080 MW | Dec 2028 | View | |
| Hastings Generation Site | Esso Australia Resources | Publicly Announced | Turbine - OCGT | Fossil - N/A | 29 MW | — | View | |
| Haughton BESS | Pacific Hydro Haughton Solar Farm Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200/800 MW | Jan 2028 | View | |
| Haughton Solar Farm Stage 2 | Pacific Hydro Australia Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 300 MW | Nov 2028 | View | |
| Haunted Gully BESS - KCI | Vena Energy Services (Australia) Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Hay Sun Farm | Plains SF No1 Pty Ltd | Anticipated | Solar PV - Single axis tracking | Solar - Solar | 110 MW | — | View | |
| Hazelwood BESS - KCI | International Power (Australia) Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 150/400 MW | — | View | |
| Hazelwood North Solar Farm - KCI | Manthos Investments Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 480 MW | — | View | |
| Hellyer Wind Farm | ARK Energy Corporation Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 155 MW | — | View | |
| Herries Range Wind Farm | Acciona Energy Global Australia | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 752 MW | Dec 2030 | View | |
| Hexham | Wind Prospect WA Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 763 MW | — | View | |
| Hills of Gold Wind Farm | Hills of Gold Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 400 MW | — | View | |
| Hobart Show Grounds BESS | Gravitas | Publicly Announced | Storage - Battery | Other - Other | 11 MW | — | View | |
| Hollow Tree Wind Farm | Goldwind Australia | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 421 MW | — | View | |
| Holloway - Battery | SynCo Global | Publicly Announced | Storage - Battery | Other - Other | 300 MW | — | View | |
| Holloway BESS - KCI | Bushranger Project Pty Ltd. | Publicly Announced | Storage - Battery | Other - Other | 562 MW | — | View | |
| Hookey Creek Hybrid - Solar And BESs - KCI | Zen Energy Future Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 200/800 MW | Mar 2029 | View | |
| Hookey Creek Hybrid - Solar And BESs - KCI | Zen Energy Future Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 100 MW | Mar 2029 | View | |
| Hopeland BESS | Pacific Partnerships | Publicly Announced | Storage - Battery | Other - Other | 230/350 MW | Dec 2026 | View | |
| Hopeland Solar Farm | Hopeland Solar Farm Pty Ltd as trustee for the Hopeland Solar Farm Trust | Publicly Announced | Solar PV - Fixed | Solar - Solar | 328 MW | — | View | |
| Horsham BESS | ESCO Solar Farm 7 Trust | Publicly Announced | Storage - Battery | Other - Other | 100/200 MW | — | View | |
| Horsham Solar Farm | ESCO SOLAR FARM 7 PTY LTD | Committed | Solar PV - Single axis tracking | Solar - Solar | 119 MW | Dec 2026 | View | |
| Hughes Road BESS | BayWA r.e Projects Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200/800 MW | Feb 2028 | View | |
| Hume BESS | GSP Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 10/40 MW | — | View | |
| Hume Bess (ARIF) | The Trustee for the ARIF Hume BESS Holdings Trust | Publicly Announced | Storage - Battery | Other - Other | 75/148 MW | — | View | |
| Hume North Battery Energy Storage System | Infrastructure Capital Services Pty Ltd as trustee for the ARIF Hume BESS Holdings Trust | Publicly Announced | Storage - Battery | Other - Other | 75 MW | — | View | |
| Hunter Power Station | Snowy Hydro Limited | Committed | Turbine - OCGT | Fossil - Natural Gas Pipeline | HUNTER1 | 375 MW | May 2025 | View |
| Hunter Power Station | Snowy Hydro Limited | Committed | Turbine - OCGT | Fossil - Natural Gas Pipeline | HUNTER2 | 375 MW | Jul 2025 | View |
| Ilford Green Energy Hub | brightnightpower_NR | Publicly Announced | Storage - Battery | Solar - Solar | 360/300 MW | Apr 2029 | View | |
| Ilford Green Energy Hub | brightnightpower_NR | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 174 MW | Oct 2029 | View | |
| Ilford Green Energy Hub | brightnightpower_NR | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 176 MW | Apr 2029 | View | |
| Innes Park Solar Farm | Enerparc Australia Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 24 MW | Jul 2026 | View | |
| Inverell Battery Energy Storage System | Inverell BESS Development Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 150 MW | — | View | |
| Inverleigh Solar Farm | TBA | Publicly Announced | Solar PV - Fixed | Solar - Solar | 22 MW | — | View | |
| Inverleigh Wind Farm | Inverleigh Wind Farm Pty Ltd | Anticipated | Wind Turbine - Onshore | Wind - Wind | 92 MW | — | View | |
| Ironbark Power Station 20MW Expansion | Carbon Logica Pty Ltd | Publicly Announced | Turbine - Other | Other - Other | 20 MW | — | View | |
| Ivanhoe BESS | Ivanhoe Coal Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 702 MW | — | View | |
| Jackson North BESS | Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy(Australia) Ngumi 6 Asset Trust | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | — | View | |
| Jeremiah Wind Farm | Squadron Energy Services Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 288 MW | — | View | |
| Jindera BESS - Storage - KCI | BESS Atlantic | Publicly Announced | Storage - Battery | Other - Other | 250 MW | — | View | |
| Jindera Solar Farm | Jindera Solar Farm Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 120 MW | — | View | |
| Joel BESS | ACEnergy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 297/1000 MW | — | View | |
| Juno BESS | Tilt Renewables Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| Juno Wind Farm | Tilt Renewables Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 300 MW | — | View | |
| Kaloya Moa Standalone BESS | Samsung C&T Renewable Energy Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 139/400 MW | — | View | |
| Kangaroo Hills Wind Farm | Origin Energy Pty Ltd | Publicly Announced | Storage - Battery | Wind - Wind | 30/60 MW | Oct 2028 | View | |
| Kangaroo Hills Wind Farm | Origin Energy Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 155 MW | Oct 2028 | View | |
| Kangaroo Valley BESS | FIrm Power P/L | Publicly Announced | Storage - Battery | Other - Other | 365/1000 MW | — | View | |
| Karara BESS - KCI | ACCIONA Energy | Publicly Announced | Storage - Battery | Other - Other | 400/400 MW | — | View | |
| Karma Wind Farm - KCI | NEMMCOCI Karma Pty Ltd as trustee for the CI Karma Trust | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 966 MW | — | View | |
| Kelsey Creek Solar Farm | tetrisenergy_nr | Publicly Announced | Solar PV - Fixed | Solar - Solar | 50 MW | — | View | |
| Kelsey Creek Solar Farm_SS | tetrisenergy_nr | Publicly Announced | Solar PV - Fixed | Solar - Solar | 50 MW | — | View | |
| Kentbruck Green Power Hub | Neoen Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 600 MW | Jun 2030 | View | |
| Kerang BESS | Kerang Bess Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 103/206 MW | Aug 2026 | View | |
| Kerang BESS (BSR) | British Solar Renewables | Publicly Announced | Storage - Battery | Other - Other | 300 MW | — | View | |
| Kerang Hybrid | Kerang Power Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 3/110 MW | Sep 2027 | View | |
| Kerang Hybrid | Kerang Power Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 3 MW | Dec 2027 | View | |
| Kerrawary Power Station | Origin Energy | Publicly Announced | Turbine - OCGT | Fossil - Natural Gas Pipeline | 770 MW | Dec 2029 | View | |
| Kerrs Creek Wind Farm | RES Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 330 MW | Mar 2030 | View | |
| Kiamal BESS | TotalEnergies Renewables Australia | Publicly Announced | Storage - Battery | Other - Other | KIAMBE | 239/880 MW | May 2028 | View |
| Kidston Pumped Storage Hydro Project 250MW | Genex Power Ltd | Committed | Storage - Pumped hydro | Hydro - Water | 250/2000 MW | Jan 2026 | View | |
| Kidston Solar Project Phase Two 270MW | Genex Power Limited | Publicly Announced | Solar PV - Fixed | Solar - Solar | 270 MW | — | View | |
| Kidston Stage 3 Wind Project | Genex Power Limited | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 258 MW | — | View | |
| KIEWA VALLEY BESS | KIEWA VALLEY BESS NOMINEES PTY LTD on behalf of KIEWA VALLEY BESS Trust | Publicly Announced | Storage - Battery | Other - Other | 500/1000 MW | — | View | |
| Kincraig BESS | acepower_NR | Publicly Announced | Storage - Battery | Other - Other | 4/600 MW | Dec 2028 | View | |
| Kingfisher Solar Storage - Solar | Lyon Solar | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 0 MW | — | View | |
| Kingfisher Solar Storage - Storage | Lyon Solar | Publicly Announced | Storage - Battery | Other - Other | 100 MW | — | View | |
| Kings Plain Wind Farm | Enerfin Energy Services Pty Ltd. | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 400 MW | — | View | |
| Kingswood BESS | Iberdrola Australia Development Pty Ltd. | Publicly Announced | Storage - Battery | Other - Other | 250/500 MW | — | View | |
| Koberinga Solar Farm | ESCO Pacific | Publicly Announced | Solar PV - Fixed | Solar - Solar | 55 MW | — | View | |
| Koolunga Battery Energy Storage System 1 | Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy (Australia) Ngumi 6 Asset Trust | Publicly Announced | Storage - Battery | Other - Other | 100/200 MW | Jun 2026 | View | |
| Koolunga Battery Energy Storage System 2 | Equis Energy (Australia) Projects (Ngumi 6) Pty Ltd as trustee for the Equis Energy (Australia) Ngumi 6 Asset Trust | Publicly Announced | Storage - Battery | Other - Other | 100/200 MW | Jun 2026 | View | |
| Koorakee Wind Farm | Squadron Energy Services Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 300 MW | — | View | |
| Koorangie BESS Stage 2 | Edify Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 150 MW | — | View | |
| Koorangie Energy Storage System | Edify Energy | Committed | Storage - Battery | Other - Other | KESSB1 | 185/370 MW | Apr 2025 | View |
| Koyuga Nanneella Wind Farm | FERA Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 400 MW | — | View | |
| Lake Lyell Pumped Hydro | EnergyAustralia NSW Pty Ltd | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 385/3080 MW | Dec 2030 | View | |
| Lake Victoria Energy Park - KCI | Lake Victoria Wind Farm Pty Ltd atf Lake Victoria Wind Farm unit trust | Publicly Announced | Storage - Battery | Other - Other | 300 MW | — | View | |
| Lakeland Wind Farm | Lakeland Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 73 MW | Jun 2028 | View | |
| Lambing Gully BESS | tetrisenergy_nr | Publicly Announced | Storage - Battery | Other - Other | 100/800 MW | — | View | |
| Lambing Gully Wind Farm | tetrisenergy_nr | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 310 MW | — | View | |
| Lambruk Solar Project | Venn Energy Pty Ltd / Acacia Solar Project Pty Ltd. | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 361 MW | — | View | |
| Lancaster Solar Farm | Lancaster Solar Farm Pty Ltd as trustee for the Lancaster Solar Farm Trust | Anticipated | Solar PV - Single axis tracking | Solar - Solar | 80 MW | — | View | |
| Latrobe Solar Farm | Canadian Solar (Australia) Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 400 MW | — | View | |
| LaTrobe Valley BESS | Tilt Renewables Australia Pty Ltd | Committed | Storage - Battery | Other - Other | LVES1 | 100/200 MW | Jul 2025 | View |
| Learmonth BESS | The Trustee for Learmonth BESS Holdings Unit Trust | Publicly Announced | Storage - Battery | Other - Other | 268/1072 MW | — | View | |
| Leigh Creek Energy Project | Leigh Creek Energy | Publicly Announced | Turbine - Steam Sub Critical | Other - Other | 45 MW | — | View | |
| Lerida BESS | Elgin EnergyP/L | Publicly Announced | Storage - Battery | Other - Other | 250 MW | — | View | |
| Lerida Solar Farm | Elgin EnergyP/L | Publicly Announced | Solar PV - Fixed | Solar - Solar | 250 MW | — | View | |
| Liddell BESS | MACQGEN | Committed* | Storage - Battery | Other - Other | 500/1000 MW | Feb 2026 | View | |
| Lilyvale BESS - KCI | Acen Australia | Publicly Announced | Storage - Battery | Other - Other | 440/1760 MW | — | View | |
| Limondale BESS | LIMONDALE BATTERY PTY. LTD | Committed | Storage - Battery | Other - Other | 50/400 MW | Dec 2025 | View | |
| LINCOLN GAP BESSBDU | Lincoln Gap Wind Farm (Operations) Pty Ltd | Anticipated | Storage - Battery | Other - Other | LGAPBS1 | 10/10 MW | Jun 2025 | View |
| Lincoln Gap Wind Farm stage 3 | Lincoln Gap 3 Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 277 MW | — | View | |
| Lindley BESS | NEMMCO | Publicly Announced | Storage - Battery | Other - Other | 100/200 MW | — | View | |
| Lindsay Gap BESS | Acciona Energy Australia Global | Publicly Announced | Storage - Battery | Other - Other | 450/450 MW | — | View | |
| Lionsgate Battery | CEP Energy | Publicly Announced | Storage - Battery | Other - Other | 150 MW | — | View | |
| Little River BESS | ACEnergy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 350/770 MW | — | View | |
| Little River Solar Farm - KCI | Clean Technology Partners | Publicly Announced | Solar PV - Fixed | Solar - Solar | 279 MW | — | View | |
| Lockhart Hybrid Facility - Battery | Better Energy Technology Pty Ltd | Committed | Storage - Battery | Solar - Solar | 10/20 MW | May 2026 | View | |
| Lockhart Hybrid Facility - Solar | Better Energy Technology Pty Ltd | Committed | Solar PV - Single axis tracking | Solar - Solar | 10 MW | May 2026 | View | |
| Lockyer BESS - KCI | Lockyer Energy Management Pty | Publicly Announced | Storage - Battery | Other - Other | 750 MW | — | View | |
| Lockyer Valley Energy Project | Lockyer Energy Management Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 400/800 MW | — | View | |
| Lockyer Valley Energy Project | Lockyer Energy Management Pty Ltd | Anticipated | Turbine - OCGT | Fossil - Natural Gas | 117 MW | Feb 2028 | View | |
| Lotus Creek Wind Farm | CS ENERGY | Committed | Wind Turbine - Onshore | Wind - Wind | 285 MW | Dec 2027 | View | |
| Lovely Banks Renewable Energy Hub - KCI | Syncline Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Lower Wonga BESS | Equis Energy (Australia) Projects (Ngumi 7) Pty Ltd as trustee for the Equis Energy(Australia) Ngumi 7 Asset Trust | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | May 2026 | View | |
| Lower Wonga Solar Farm (LightsourceBP) | Lower Wonga Solar Farm Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 353 MW | — | View | |
| Loy Yang B Power Station - BESS Stage 1 - KCI | Alinta Energy Clean Energy Development Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 250/500 MW | — | View | |
| LST02 Data Hall BESS | Firmus Grid P/L | Publicly Announced | Storage - Battery | Other - Other | 24 MW | — | View | |
| LYA BESS | LOYYANGA | Publicly Announced | Storage - Battery | Other - Other | 200/800 MW | — | View | |
| MacIntyre Wind Farm | Macintyre Windfarm Pty Ltd and Arc Energy Macintyre Pty Ltd | Committed* | Wind Turbine - Onshore | Wind - Wind | MCINTYR1 | 923 MW | Nov 2025 | View |
| Mackenzie River BESS | BSR EPC P/L | Publicly Announced | Storage - Battery | Solar - Solar | 800 MW | — | View | |
| Mackenzie River Solar Farm | BSR EPC P/L | Publicly Announced | Solar PV - Fixed | Solar - Solar | 800 MW | — | View | |
| Madeline Downs BESS | AGL Energy Limited | Publicly Announced | Storage - Battery | Other - Other | 500/2000 MW | — | View | |
| Maison Dieu BESS | Graviatas Now Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 500 MW | — | View | |
| Maison Dieu Solar Farm | Terrain Solar | Publicly Announced | Storage - Battery | Other - Other | 49/80 MW | — | View | |
| Maison Dieu Solar Farm | Terrain Solar | Publicly Announced | Solar PV - Fixed | Solar - Solar | 77 MW | — | View | |
| Majors Creek Solar And BESS | Edify Energy Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 150 MW | — | View | |
| Majors Creek Solar And BESS | Edify Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 150/600 MW | Oct 2028 | View | |
| Mallee Wind Farm | Mallee Wind PTY LTD | Publicly Announced | Storage - Battery | Wind - Wind | 100/200 MW | Mar 2028 | View | |
| Mallee Wind Farm | Mallee Wind PTY LTD | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 502 MW | Mar 2028 | View | |
| Malunga Nine Mile BESS - KCI | Green Switch Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 500 MW | — | View | |
| Mandurama BESS | tetrisenergy_nr | Publicly Announced | Storage - Battery | Other - Other | 20/160 MW | — | View | |
| Mandurama Wind Farm | tetrisenergy_nr | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 250 MW | — | View | |
| Mangoplah BESS - KCI | Samsung C&T Renewable Energy Australia Pty Ltd. | Publicly Announced | Storage - Battery | Other - Other | 104/400 MW | — | View | |
| Mannum BESS | Mannum Stage 2 Battery SubCo Pty Ltd as Trustee for The Mannum Stage 2 Battery Unit Trust | Anticipated | Storage - Battery | Other - Other | 100/200 MW | Sep 2025 | View | |
| Mansfield Solar Farm - Solar - KCI | Biscon Energy Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 350 MW | — | View | |
| Mansfield Solar Farm - Storage - KCI | Biscon Energy Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 0 MW | — | View | |
| Maranbah Solar Farm | EEW ECO ENERGY WORLD PTY LTD | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 160 MW | — | View | |
| Marcollat Energy Hub (Stage 1) | BE PRO MC1 PTY LTD | Publicly Announced | Storage - Battery | Other - Other | 400/1600 MW | — | View | |
| Marcollat Energy Hub (stage 2) | Bison Energy | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Markaranka Solar and Storage | Monash Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 375/375 MW | — | View | |
| Markaranka Solar and Storage | Monash Energy Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 125 MW | — | View | |
| Marmadua Wind Farm (KCI) | Cubico Sustainable Investments Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 950 MW | — | View | |
| Marulan - OCGT/CCGT | EnergyAustralia Marulan Pty Ltd | Publicly Announced | Turbine - Other | Fossil - Natural Gas Pipeline | 800 MW | — | View | |
| Marulan BESS | Ratch Australia | Publicly Announced | Storage - Battery | Other - Other | 84/162 MW | — | View | |
| Marulan Solar Farm | Marulan Solar Farm Pty Ltd | Publicly Announced | Solar PV - Dual axis tracking | Solar - Solar | 207 MW | Dec 2025 | View | |
| Maryvale Energy From Waste | Maryvale Energy from Waste Project Company | Publicly Announced | Turbine - Steam Super Critical | Renewable Biomass or Waste - Municipal Solid Waste | 70 MW | — | View | |
| Maryvale Solar and Energy Storage System | Maryvale Solar Farm Pty Ltd | Anticipated | Storage - Battery | Other - Other | 172/408 MW | Feb 2027 | View | |
| Maryvale Solar and Energy Storage System | Maryvale Solar Farm Pty Ltd | Anticipated | Solar PV - Single axis tracking | Solar - Solar | 172 MW | Feb 2027 | View | |
| Maules Creek BESS | FRV Services Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 81/80 MW | — | View | |
| Maules Creek Solar Farm | FRV Services Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 63 MW | — | View | |
| Maxwell Downs Solar Farm - KCI | X-Elio Holbrook Trust | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 300 MW | — | View | |
| McCullys Gap BESS | BW ESS | Publicly Announced | Storage - Battery | Other - Other | 400/800 MW | — | View | |
| McMahons Reef Solar Farm | Enerparc Australia Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 123 MW | — | View | |
| Meadow Creek Solar Farm - KCI | Clean Technologies Partners | Publicly Announced | Solar PV - Fixed | Solar - Solar | 180 MW | — | View | |
| Meering BESS | Virya Energy Pty Ltd | Publicly Announced | Storage - Battery | Wind - Wind | 250/1000 MW | — | View | |
| Melbourne Grid Battery - KCI | Lumea | Publicly Announced | Storage - Battery | Other - Other | 0 MW | — | View | |
| Melbourne Renewable Energy Complex | Elgin Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 250 MW | — | View | |
| Melbourne Renewable Energy Hub - Side A | MREH Pty Ltd as trustee for MREH Asset Trust | Committed | Storage - Battery | Other - Other | 600/1600 MW | Nov 2025 | View | |
| Melbourne Renewable Energy Hub - Side B | MREH Pty Ltd as trustee for MREH Asset Trust | Publicly Announced | Storage - Battery | Other - Other | 600/2400 MW | Dec 2028 | View | |
| Melbourne Solar Farm - KCI | Emergent Technologies | Publicly Announced | Solar PV - Fixed | Solar - Solar | 350 MW | — | View | |
| Meredith Wind Farm - KCI | Acciona Energy Global Australia | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 342 MW | — | View | |
| Merino Solar Farm | Merino Solar Farm Pty Ltd as trustee for Merino Solar Farm Trust | Publicly Announced | Storage - Battery | Other - Other | 309 MW | — | View | |
| Merino Solar Farm | Merino Solar Farm Pty Ltd as trustee for Merino Solar Farm Trust | Publicly Announced | Solar PV - Fixed | Solar - Solar | 338 MW | — | View | |
| Merriwa Solar Farm and BESS | Valent Energy Developments Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 500 MW | Nov 2027 | View | |
| Merriwa Solar Farm and BESS | Valent Energy Developments Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 500/2000 MW | — | View | |
| Mica Creek Solar Farm | APA Group | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 88 MW | — | View | |
| Middle Creek Renewable Energy Hub - Wind | Cubico Sustainable Investments Australia Pty Ltd | Publicly Announced | Storage - Battery | Wind - Wind | 750 MW | — | View | |
| Middle Creek Renewable Energy Hub - Wind | Cubico Sustainable Investments Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 750 MW | — | View | |
| Middlebrook Solar And BESS | Middlebrook Solar Farm Pty Ltd as trustee for MSF Project Trust | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 354 MW | May 2029 | View | |
| Middlebrook Solar And BESS | Middlebrook Solar Farm Pty Ltd as trustee for MSF Project Trust | Publicly Announced | Storage - Battery | Solar - Solar | 387/640 MW | May 2029 | View | |
| Midwest BESS | Midwest Solar Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 53 MW | — | View | |
| Midwest Solar Farm | Midwest Solar Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 76 MW | — | View | |
| Mildura Power Station | Ceramet | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 10 MW | — | View | |
| Miles BESS Project | TBSOL | Publicly Announced | Storage - Battery | Other - Other | 500/1000 MW | — | View | |
| Miles Solar Project | Vena Energy | Publicly Announced | Solar PV - Fixed | Solar - Solar | 500 MW | — | View | |
| Millmerran BESS - Storage | Millmerran Power Partners | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | — | View | |
| Millmerran Wind Farm | Millmerran Power Partners | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 250 MW | — | View | |
| Milpulling Wind Farm | Milpulling Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 7 MW | — | View | |
| Miriam Vale Solar Farm And BESS - A | Private Energy Partners Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 200 MW | — | View | |
| Miriam Vale Solar Farm And BESS - A | Private Energy Partners Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 100/100 MW | — | View | |
| Miriam Vale Solar Farm And BESS - B | Private Energy Partners Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 200 MW | — | View | |
| Miriam Vale Solar Farm And BESS - B | Private Energy Partners Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 100/100 MW | — | View | |
| MNC000116 - Dubbo Firming Power Station | Squadron Energy Services Pty Ltd | Publicly Announced | Other - Other | Fossil - Natural Gas | 57 MW | — | View | |
| Moah Creek Solar Farm (RES) | Moah Creek Solar Development Co Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 350 MW | — | View | |
| Moah Creek Wind Farm | Moah Creek Wind Farm Project Co Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 360 MW | May 2028 | View | |
| Moama Solar Farm | Moama Propertyco Pty Ltd as trustee for the Moama Property Trust | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 36 MW | — | View | |
| Mobilong BESS | Mobilong ProjectCo Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 180/720 MW | — | View | |
| Mologa BESS | Potentia Energy Group P/L | Publicly Announced | Storage - Battery | Other - Other | 250/250 MW | — | View | |
| Molong BESS (KCI) | StorEnergy 3 Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 150 MW | — | View | |
| Molonglo BESS | ITP Developments P/L | Publicly Announced | Storage - Battery | Other - Other | 12 MW | — | View | |
| Monash Solar Farm - KCI | 1265 Warnecke Rd Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 100 MW | — | View | |
| Monduran BESS | Eku Energy Projects (Australia) Pty Ltd as trustee for the Eku Energy Projects (Australia) Trust | Publicly Announced | Storage - Battery | Other - Other | 300/1200 MW | — | View | |
| Moonah Solar Farm - KCI | Venn Energy Pty Ltd / Moonah Solar Project Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 176 MW | — | View | |
| Moonlight Range Wind Farm | Brookfield | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Moonlight Range Wind Farm | Brookfield | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 400 MW | — | View | |
| Moorabool BESS | Neoen Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | MOORBESS | 300/1200 MW | — | View |
| Moorebank Logistics Park Project | Energy Bay Fund Management | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| Moorebank Logistics Park Project | Energy Bay Fund Management | Publicly Announced | Solar PV - Fixed | Solar - Solar | 120 MW | — | View | |
| Moree BESS | AE BESS 2 PTY LTD AS TRUSTEE FOR AE BESS 2 UNIT TRUST | Publicly Announced | Storage - Battery | Other - Other | 120/480 MW | — | View | |
| Moreton Hill Wind Farm | Moreton Hill Wind Farm Nominees Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 388 MW | — | View | |
| Morgan Battery | NEMMCO | Publicly Announced | Storage - Battery | Other - Other | 30 MW | — | View | |
| Morgan Long Duration Energy Storage - KCI | Origin Energy | Publicly Announced | Storage - Battery | Other - Other | 40 MW | — | View | |
| Morgan Solar | Green Gold Energy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 108 MW | — | View | |
| Mornington BESS | Mornington BESS Project Pty Ltd as Trustee of Mornington BESS Project Trust | Publicly Announced | Storage - Battery | Other - Other | 240/480 MW | Jul 2026 | View | |
| Mortlake | Origin Energy Power Limited | Publicly Announced | Turbine - OCGT | Fossil - Natural Gas | 200 MW | — | View | |
| Mortlake Battery | BORAL | Anticipated | Storage - Battery | Other - Other | 300/600 MW | Mar 2027 | View | |
| Mortlake Energy Hub | brightnightpower_NR | Anticipated | Storage - Battery | Solar - Solar | 316/1200 MW | Jul 2027 | View | |
| Mortlake Energy Hub | brightnightpower_NR | Anticipated | Solar PV - Single axis tracking | Solar - Solar | 334 MW | Jul 2027 | View | |
| Morundah Battery Storage | Photon Energy Engineering Australia Pty Ltd. | Publicly Announced | Storage - Battery | Solar - Solar | 300/300 MW | — | View | |
| Morundah Solar Power Plant (Thermal) | Photon Energy Engineering Australia Pty Ltd. | Publicly Announced | Solar Thermal - Central collector | Solar - Solar | 600 MW | — | View | |
| Morwell BESS | ACE Power Development 2 Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 785/4000 MW | — | View | |
| Mount Britton BESS1 | firmpower_NR | Publicly Announced | Storage - Battery | Other - Other | 378/1000 MW | — | View | |
| Mount Britton BESS2 | firmpower_NR | Publicly Announced | Storage - Battery | Other - Other | 378/1000 MW | — | View | |
| Mount Fyans | Woolnorth Wind Farm Holding | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 459 MW | — | View | |
| Mount Fyans Wind Farm 2.0 | Woolnorth Wing Farm Holding Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 750 MW | — | View | |
| Mount Hopeful BESS | Neoen Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 300 MW | — | View | |
| Mount Hopeful Wind Farm | Mount Hopeful Wind Farm as trustee for Mount Hopeful Wind Farm Trust | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 370 MW | Jun 2028 | View | |
| Mount Lambie BESS | tetrisenergy_nr | Publicly Announced | Storage - Battery | Other - Other | 100/600 MW | — | View | |
| Mount Lambie Wind Farm | tetrisenergy_nr | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 200 MW | — | View | |
| Mt Challenger BESS | Tetris Energy | Publicly Announced | Storage - Battery | Other - Other | 20/80 MW | — | View | |
| Mt Challenger Wind Farm | Tetris Energy | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 115 MW | — | View | |
| Mt Cotton Biomass Cogeneration Power Station | Darwalla Milling Co Pty Ltd | Publicly Announced | Turbine - Steam Sub Critical | Other - Other | 8 MW | — | View | |
| Mt Doran BESS | Iberdrola Australia Development Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | — | View | |
| Mt Fox BESS - ARENA | Mount Fox BESS Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 300/600 MW | Apr 2029 | View | |
| Mt Fox Wind Farm | Mount Fox Energy Park Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 291 MW | — | View | |
| Mt Mercer BESS | Foresight Australia | Publicly Announced | Storage - Battery | Other - Other | 80/160 MW | — | View | |
| Mt Piper BESS | Energy Australia Development Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 250/1000 MW | — | View | |
| Mt View Wind Farm (KCI) | Woodside Energy Technologies Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 750 MW | — | View | |
| Mugga Lane BESS | LGI | Publicly Announced | Storage - Battery | Other - Other | 12/24 MW | — | View | |
| Mullion Creek Wind Farm | Mullion Creek Wind Farm P/L | Publicly Announced | Solar PV - Fixed | Solar - Solar | 250 MW | — | View | |
| Mulwala Solar Farm | ESCO Solar Farm 1 Pty Ltd as trustee for the ESCO Solar Farm 1 Trust | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 25 MW | — | View | |
| Munna Creek Solar Farm | Munna Creek Solar Farm Investments Pty Ltd as trustee for the Munna Creek Solar Farm Trust | Committed | Solar PV - Single axis tracking | Solar - Solar | 154 MW | Jan 2026 | View | |
| Murrumburrah BESS - KCI | FIrm Power P/L | Publicly Announced | Storage - Battery | Other - Other | 152/400 MW | — | View | |
| Muskerry Solar Power Station - KCI | Edify Energy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 200 MW | — | View | |
| Muswellbrook BESS | firmpower_NR | Publicly Announced | Storage - Battery | Other - Other | 197/300 MW | — | View | |
| Muswellbrook PRO BESS | Penso Power Australia P/L | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Muswellbrook Pumped Hydro | AGL Energy Limited | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 400/3200 MW | — | View | |
| Muswellbrook Solar Farm | Ox2 | Publicly Announced | Solar PV - Fixed | Solar - Solar | 135 MW | — | View | |
| Myrtle Creek BESS | ARK Energy Corporation Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 275/2200 MW | — | View | |
| Narrabri Hybrid Project | Narrabri Genesis Hold Pty Ltd ATF Narrabri Genesis Hold Trust | Publicly Announced | Storage - Battery | Other - Other | 4/400 MW | Aug 2027 | View | |
| Narrabri Hybrid Project | Narrabri Genesis Hold Pty Ltd ATF Narrabri Genesis Hold Trust | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 5 MW | — | View | |
| Narrabri South Solar Farm | Canadian Solar | Publicly Announced | Solar PV - Fixed | Solar - Solar | 50 MW | — | View | |
| Narrandera BESS | Potentia Energy Group P/L | Publicly Announced | Storage - Battery | Other - Other | 400/1600 MW | — | View | |
| Narrandera Solar Farm | Potentia Energy Group P/L | Publicly Announced | Solar PV - Fixed | Solar - Solar | 125 MW | — | View | |
| Nebo BESS | Nebo BESS Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 450/1800 MW | — | View | |
| Nebo BESS (Iberdrola) - KCI | Iberdrola Australia Development Pty Ltd. | Publicly Announced | Storage - Battery | Other - Other | 280 MW | — | View | |
| New England Solar Farm | ACEN AUSTRALIA | Anticipated | Solar PV - Single axis tracking | Solar - Solar | 320 MW | Oct 2028 | View | |
| New England Solar Farm BESS | ACEN RENEWABLES | Anticipated | Storage - Battery | Other - Other | 100/200 MW | Dec 2026 | View | |
| Noblevale BESS (KCI) | Zen Energy Future Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 180/360 MW | Jun 2028 | View | |
| Normanville Energy Park - Wind (KCI) | Westwind Development Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 120 MW | — | View | |
| North Burnett Renewable Hub - BESS | X-Elio Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 700/2800 MW | — | View | |
| North Burnett Renewable Hub - Solar | X-Elio Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 700 MW | — | View | |
| North East Wind - KCI | ACEN North East Tasmania Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 7 MW | — | View | |
| North Yarragon BESS - KCI | Zen Energy | Publicly Announced | Storage - Battery | Other - Other | 210/840 MW | — | View | |
| Northern Tablelands Wind Farm | BORAL | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 8 MW | — | View | |
| Nottingham Park Solar Farm - KCI | NPSF Renewables Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 210 MW | — | View | |
| Nowingi Solar Farm - Edify (KCI) | Edify Energy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 750 MW | — | View | |
| Nowingi Solar Storage - Solar | Lyon Solar | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 250 MW | — | View | |
| Nowingi Solar Storage - Storage | Lyon Solar | Publicly Announced | Storage - Battery | Other - Other | 80 MW | — | View | |
| NSW Gas Peaker | AGL Energy Limited | Publicly Announced | Reciprocating Engine - Compression ignition | Fossil - Natural Gas | 500 MW | — | View | |
| Nyaninyuk Wind Farm | Acciona Energy | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 302 MW | — | View | |
| Orana BESS | Wellington Battery ProjectCo Pty Ltd | Anticipated | Storage - Battery | Other - Other | ORANA | 415/1660 MW | Jun 2026 | View |
| Orange Grove Sun Farm | Overland Sun Farm Holdings Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 80 MW | — | View | |
| Osborne BESS | Osboourne Cogeneration P/L | Publicly Announced | Storage - Battery | Other - Other | 300 MW | — | View | |
| Oven Mountain Pumped Storage | Oven Mountain Pumped Storage | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 900/7200 MW | — | View | |
| Oxley Solar Farm | Oxley Solar Development Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 300 MW | — | View | |
| Pacific Green Energy Park - Limestone Coast North | Pacific Green | Publicly Announced | Storage - Battery | Other - Other | 250/500 MW | — | View | |
| Pacific Green Energy Park - Limestone Coast West | Pacific Green | Publicly Announced | Storage - Battery | Other - Other | 250/500 MW | — | View | |
| Pacific Green Energy Park – Portland | Pacific Green Energy Park Cascade Trust | Publicly Announced | Storage - Battery | Other - Other | 960/500 MW | — | View | |
| Paling Yards Wind Farm | Paling Yards Development Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 287 MW | — | View | |
| Palmer Wind Farm | Tilt Renewables Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 274 MW | — | View | |
| Palmerston BESS (Akaysha) | Palmerston ProjectCo Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 100/200 MW | — | View | |
| Panorama BESS | PANORAMA BESS SUBCO PTY LTD as trustee for the PANORAMA BESS UNIT TRUST | Publicly Announced | Storage - Battery | Other - Other | 100 MW | — | View | |
| Para Hill BESS | X-Elio Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 300/300 MW | — | View | |
| Peel Valley BESS | Potentia Energy Group P/L | Publicly Announced | Storage - Battery | Other - Other | 450/900 MW | — | View | |
| Peel Valley Solar Farm | Potentia Energy Group P/L | Publicly Announced | Solar PV - Fixed | Solar - Solar | 150 MW | — | View | |
| Pelican Point BESS | Engie | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| Penfield BESS | BESS PENFIELD PTY LTD | Publicly Announced | Storage - Battery | Other - Other | 20/40 MW | — | View | |
| Peninsula Solar Farm & BESS | Edify Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 80/160 MW | — | View | |
| Peninsula Solar Farm & BESS | Edify Energy Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 80 MW | — | View | |
| Phoenix Pumped Hydro Project | ACEN Phoenix Pty Ltd | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 810/9720 MW | Mar 2029 | View | |
| Piambong Wind Farm - KCI | Piambong Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 632 MW | Dec 2028 | View | |
| Pine Lodge 2 BESS - KCI | ACEnergy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 454/700 MW | — | View | |
| Pine Lodge BESS | ACEnergy | Publicly Announced | Storage - Battery | Other - Other | 250/550 MW | — | View | |
| Pinnacles BESS - Storage - KCI | Enervest Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Pint Pot BESS | FRV Services Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 424/1260 MW | — | View | |
| Pioneer BESS - KCI | Edify Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200/200 MW | — | View | |
| Playford Battery | CFG | Publicly Announced | Storage - Battery | Other - Other | 100/100 MW | — | View | |
| Pleasant Hills Solar Farm - KCI | TotalEnergies Renewables Australia Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 80 MW | Sep 2028 | View | |
| Pleystowe BESS | PLEYSTOWE BESS PTY LTD | Publicly Announced | Storage - Battery | Other - Other | 200/800 MW | — | View | |
| Pleystowe BESS (KCI) | Pleystowe BESS P/L | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| Port Augusta Solar Farm (KCI) | Edify Energy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 300 MW | — | View | |
| Port Kembla Power Station | Australian Industrial Power | Publicly Announced | Other - Other | Other - Other | 660 MW | — | View | |
| Port Latta Wind Farm | Oz Green Energy I Pty Ltd | Anticipated | Wind Turbine - Onshore | Wind - Wind | 21 MW | Feb 2027 | View | |
| Port Paterson BESS | Green Gold Energy | Publicly Announced | Storage - Battery | Other - Other | 70/70 MW | — | View | |
| Port Pirie Solar Farm - KCI | Trafigura Hydrogen Australia | Publicly Announced | Solar PV - Fixed | Solar - Solar | 300 MW | — | View | |
| Portland Renewables Project - KCI | HAMR Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 0 MW | — | View | |
| Portland Wind Farm - KCI | Vic Offshore Windfarm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 495 MW | — | View | |
| Pottinger Energy Park - Battery - KCI | Pottinger Renewables P/L | Publicly Announced | Storage - Battery | Other - Other | 500 MW | — | View | |
| Pottinger Energy Park - Solar - KCI | Pottinger Renewables P/L | Publicly Announced | Solar PV - Fixed | Solar - Solar | 300 MW | — | View | |
| Prairie Solar Farm | Pacific Hydro Australia Developments Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 250 MW | Oct 2027 | View | |
| Prairie WF & Wongalee WF | Prairie Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 800 MW | Dec 2027 | View | |
| Project Brandy BESS | Evolution Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 90 MW | — | View | |
| Project Monash - Solar - KCI | Monash Renewables Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 375 MW | — | View | |
| Project Monash - Storage - KCI | Monash Renewables Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 125 MW | — | View | |
| Punch's Creek Renewable Energy | Skylab | Anticipated | Solar PV - Single axis tracking | Solar - Solar | 799 MW | Jan 2026 | View | |
| Punch's Creek Renewable Energy Stage 2 | skylabgroup_NR | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 400 MW | Oct 2028 | View | |
| Punchs Creek (Milmerran) BESS - New | Skylab | Publicly Announced | Storage - Battery | Solar - Solar | 400/1600 MW | — | View | |
| Puzzle Range BESS | tetrisenergy_nr | Publicly Announced | Storage - Battery | Other - Other | 50/200 MW | — | View | |
| Puzzle Range Wind Farm | tetrisenergy_nr | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 350 MW | — | View | |
| QCLNG Curtis Island Electrification - KCI | QCLNG Operating Company Pty Ltd | Publicly Announced | Turbine - OCGT | Fossil - Natural Gas | 90 MW | — | View | |
| Quandong Solar Farm | Emergent Technologies | Publicly Announced | Solar PV - Fixed | Solar - Solar | 350 MW | — | View | |
| Quarantine | Origin Energy Power Limited | Publicly Announced | Turbine - OCGT | Fossil - Natural Gas Pipeline | 165 MW | — | View | |
| Queensland Renewable Park | EEW Eco Energy World Pty Ltd | Publicly Announced | Other - Other | Other - Other | 750 MW | — | View | |
| Raglan BESS | acepower_NR | Publicly Announced | Storage - Battery | Other - Other | 500/2000 MW | Aug 2028 | View | |
| Raglan Solar Farm | EEW Eco Energy World Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 300 MW | — | View | |
| Rangemore BESS | Tetris Energy | Publicly Announced | Storage - Battery | Other - Other | 20/80 MW | — | View | |
| Rangemore Wind Farm | Tetris Energy | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 185 MW | — | View | |
| Rangoon Wind Farm | Rangoon Energy Park Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 114 MW | — | View | |
| Ravenswood BESS | FRV Services Australia | Anticipated | Storage - Battery | Other - Other | 20/40 MW | Sep 2027 | View | |
| Ravenswood Solar Farm - FRV | FRV Services Australia | Anticipated | Solar PV - Fixed | Solar - Solar | 63 MW | Sep 2027 | View | |
| Redbank | Verdant Earth Technologies Limited | Publicly Announced | Turbine - Steam Sub Critical | Renewable Biomass or Waste - Wood Waste | REDBANK1 | 151 MW | — | View |
| Reeves Plains OCGT - stage 1 | Alinta Energy Reeves Plains Pty Ltd | Publicly Announced | Turbine - OCGT | Fossil - Natural Gas Pipeline | 150 MW | — | View | |
| Reeves Plains OCGT - stage 2 | Alinta Energy Reeves Plains Pty Ltd | Publicly Announced | Turbine - OCGT | Fossil - Natural Gas Pipeline | 150 MW | — | View | |
| Reeves Plains Power Station BESS | Alinta Energy | Publicly Announced | Storage - Battery | Other - Other | 250/1000 MW | — | View | |
| Richmond Valley BESS | ARK ENERGY CORPORATION PTY LTD | Anticipated | Storage - Battery | Other - Other | 275/2200 MW | Oct 2026 | View | |
| Richmond Valley Solar Farm | ARK ENERGY CORPORATION PTY LTD | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 252 MW | — | View | |
| Ridgey Creek BESS | Ridgey Creek BESS Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 130 MW | — | View | |
| Rifle Butts Wind Farm | NewEn | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 40 MW | — | View | |
| Riverina Solar Farm | Riverina Solar Pty Ltd | Committed | Solar PV - Single axis tracking | Solar - Solar | 32 MW | Mar 2028 | View | |
| Riverland Solar Storage - Solar | Lyon Solar | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 330 MW | — | View | |
| Riverland Solar Storage - Storage | Lyon Solar | Publicly Announced | Storage - Battery | Other - Other | 100 MW | — | View | |
| Riverside BESS - Storage - KCI | Enervest Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 250 MW | — | View | |
| Riverstone Rise BESS (KCI) | Pacific Partnerships Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 521/800 MW | — | View | |
| Robbins Island Wind Farm | ACEN Robbins Island PTY LTD | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 929 MW | — | View | |
| Robertstown BESS | StorEnergy 4 Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Robertstown Solar | Robertstown Project (Solar) Operations Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 250/500 MW | — | View | |
| Robertstown Solar | Robertstown Project (Solar) Operations Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 500 MW | — | View | |
| Rollsville Hybrid Facility - Battery | X-Elio Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 110/220 MW | — | View | |
| Rollsville Hybrid Facility - Solar | X-Elio Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 220 MW | — | View | |
| Romani BESS | Samsung C&T Renewable Energy Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 216/600 MW | — | View | |
| Romani Solar Farm | Samsung C&T Renewable Energy Australia Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 302 MW | — | View | |
| Romani Standalone BESS | Samsung C&T Renewable Energy Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 240/800 MW | — | View | |
| Rothby BESS | Avenis Energy Pty Ltd on behalf of AE BESS 11 Pty Ltd ATF AE BESS 11 Unit Trust | Publicly Announced | Storage - Battery | Other - Other | 120 MW | — | View | |
| Rowallan Pumped Hydro Option | Hydro-Electric Corporation | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 750/12000 MW | — | View | |
| Rubicon BESS | samsung_NR | Publicly Announced | Storage - Battery | Other - Other | 311/800 MW | — | View | |
| Rubicon Solar Farm | samsung_NR | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 126 MW | — | View | |
| Ruby Hills North BESS | Walcha Energy Pty Ltd | Publicly Announced | Storage - Battery | Wind - Wind | 48/96 MW | Oct 2029 | View | |
| Ruby Hills North Wind Farm | Origin energy | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 248 MW | Sep 2028 | View | |
| Ruby Hills South BESS | Origin Energy Pty Ltd | Publicly Announced | Storage - Battery | Wind - Wind | 48/48 MW | Dec 2029 | View | |
| Ruby Hills South Wind Farm | Origin Energy Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 496 MW | Nov 2031 | View | |
| Rutherglen Battery - KCI | Red Hill Renewable Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Rutherglen Solar Farm - KCI | Red Hill Renewable Energy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 400 MW | — | View | |
| Salisbury BESS | Origin Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200/800 MW | Oct 2027 | View | |
| Salisbury Solar 450MW | Origin Energy Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 280 MW | Feb 2032 | View | |
| Sandigo Solar Farm | ESCO Pacific | Publicly Announced | Solar PV - Fixed | Solar - Solar | 300 MW | — | View | |
| Sandy Creek Solar Farm | Sandy Creek Solar Fund Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 700 MW | — | View | |
| Sandy Point Hybrid - Solar | Samsung C&T Renewable Energy Australia Pty Ltd. | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 181 MW | — | View | |
| Sandy Point Hybrid - Storage | Samsung C&T Renewable Energy Australia Pty Ltd. | Publicly Announced | Storage - Battery | Other - Other | 202/600 MW | — | View | |
| SEC Renewable Energy Hub | SEC | Publicly Announced | Storage - Battery | Other - Other | 100/200 MW | — | View | |
| Seymour Wind Farm | Seymour Wind Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 920 MW | — | View | |
| Shoalhaven Expansion | Origin Energy | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 235/5640 MW | — | View | |
| Silver City Energy Storage | A-CAES NSW PTY LTD | Anticipated | Storage - Other | Other - Other | 200/1600 MW | Dec 2028 | View | |
| Silverleaf Solar Farm - KCI | International Power (Australia) Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 120 MW | — | View | |
| Smithfield BESS | Smithfield BESS Pty Limited | Committed | Storage - Battery | Other - Other | 86/130 MW | Dec 2025 | View | |
| Smoky Creek Hybrid Facility - Solar And BESS | Edify Energy Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 600/2400 MW | — | View | |
| Smoky Creek Hybrid Facility - Solar And BESS | Edify Energy Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 720 MW | — | View | |
| Snowtown North Solar Farm | Tilt Renewables | Publicly Announced | Solar PV - Fixed | Solar - Solar | 44 MW | — | View | |
| Snowtown North Solar Farm - BESS | Tilt Renewables | Publicly Announced | Storage - Battery | Other - Other | 100/200 MW | — | View | |
| Snowy 2.0. | Snowy Hydro Ltd | Committed¹ | Storage - Pumped hydro | Hydro - Water | 732/116660 MW | Dec 2028 | View | |
| Solar River Solar And BESS Project | Zen Energy Retail Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 123/225 MW | — | View | |
| Solar River Solar And BESS Project | Zen Energy Retail Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 256 MW | — | View | |
| South Burnett BESS | X-Elio Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 300 MW | Sep 2027 | View | |
| South Coree BESS | Samsung C&T Renewable Energy Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 84/320 MW | — | View | |
| South East BESS - Storage - KCI | Equis Energy (Australia) Projects (Ngumi 8) Pty Ltd as trustee for the Equis Energy(Australia) Ngumi 8 Asset Trust | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | Jul 2030 | View | |
| South Johnstone Mill (expansion) | MSF Sugar | Publicly Announced | Turbine - Steam Sub Critical | Renewable Biomass or Waste - Bagasse | 32 MW | — | View | |
| South Kempsey BESS | Macleay Ventures Pty Ltd. | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| South Nanango BESS | RTB Renewables Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 630/630 MW | — | View | |
| Specimen Hill BESS - Storage - KCI | ARK Energy Corporation Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 100 MW | — | View | |
| Specimen Hill Wind Farm | ARK Energy Corporation Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 336 MW | — | View | |
| Spicers Creek Wind Farm | Squadron Energy Services Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 702 MW | — | View | |
| Springdale Solar Farm | Utilacor Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 100 MW | — | View | |
| Springdale Solar Farm - KCI | RES Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 100 MW | — | View | |
| Springlands Wind Farm | Ratch Australia | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 799 MW | — | View | |
| Springvale Energy Hub | progresspower_nr | Publicly Announced | Storage - Battery | Other - Other | 115/230 MW | — | View | |
| SRI/Mirabou (Braemar) BESS - KCI | Miraabou Energy Ltd | Publicly Announced | Storage - Battery | Other - Other | 500 MW | — | View | |
| St Patricks Plains Wind Farm | ARK Energy Corporation Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 291 MW | — | View | |
| Stanhope BESS Project 01 | Globird Energy Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | SHBESS01 | 20/20 MW | Dec 2026 | View |
| Stanmore WCMG power station | Stanmore Resources and Enernet Australia (JV) | Publicly Announced | Reciprocating Engine - Spark ignition | Fossil - Coal Seam Methane | 20 MW | Dec 2026 | View | |
| Stanwell BESS | Stanwell Corporation Limited | Anticipated | Storage - Battery | Other - Other | 300/1200 MW | Mar 2027 | View | |
| Stonehaven Gas Turbines - KCI | APA Power Holdings Pty Ltd | Publicly Announced | Turbine - OCGT | Other - Other | 220 MW | — | View | |
| Stoney Creek BESS | Stoney Creek BESS Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 125/1000 MW | — | View | |
| Stony Creek Wind Farm | Greenleaf Renewable | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 400 MW | — | View | |
| Strafford Renewable Energy Hub - Pumped Hydro | Yancoal | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 200/1600 MW | — | View | |
| Stratford Renewable Energy Hub | Yancoal Australia Limited | Publicly Announced | Solar PV - Fixed | Solar - Solar | 382 MW | — | View | |
| Stratford Renewable Energy Hub | Yancoal Australia Limited | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 400 MW | — | View | |
| Strontian Solar BESS | Strontian Solar Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 333 MW | — | View | |
| Strontian Solar Farm | Strontian Solar Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 328 MW | — | View | |
| Stubbo BESS | Stubbo 1 Pty Ltd. ACN 658 322 457 as The Trustee for Stubbo 1 Solar Project Trust | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | Mar 2029 | View | |
| Sturt Solar | Sturt Solar PTY LTD | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 300 MW | — | View | |
| Sturt Solar | Sturt Solar PTY LTD | Publicly Announced | Storage - Battery | Other - Other | 300/300 MW | — | View | |
| Summerfield BESS | CI Summerfield BESS Pty Ltd (ACN 656 223 773) as trustee for the CI Summerfield BESS Trust | Publicly Announced | Storage - Battery | Other - Other | 120/240 MW | Dec 2025 | View | |
| Summerville Solar Farm | ESCO Solar Farm 5 Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 90 MW | — | View | |
| Sundown Hybrid Facility | Canadian Solar | Publicly Announced | Solar PV - Fixed | Solar - Solar | 360 MW | — | View | |
| Sundown Hybrid Facility | Canadian Solar | Publicly Announced | Storage - Battery | Solar - Solar | 210 MW | — | View | |
| Sunshine State Solar Farm and BESS | ESCO Pacific | Publicly Announced | Solar PV - Fixed | Solar - Solar | 110 MW | — | View | |
| Sunshine State Solar Farm and BESS (Rollingstone) | Rollingstone Solar Farm Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 500 MW | — | View | |
| Supernode BESS | Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust | Committed | Storage - Battery | Other - Other | SNB01 | 260/620 MW | Dec 2025 | View |
| Supernode BESS | Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust | Committed | Storage - Battery | Other - Other | SNB02 | 260/1240 MW | Jun 2026 | View |
| Supernode BESS | Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust | Publicly Announced | Storage - Battery | Other - Other | SNB03 | 260/1240 MW | — | View |
| Supernode BESS | Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust | Publicly Announced | Storage - Battery | Other - Other | SNB04 | 260/2480 MW | — | View |
| Supernode BESS | Supernode Operations Pty Ltd as the trustee for Supernode BESS 1 Project Trust | Publicly Announced | Storage - Battery | Other - Other | SNB05 | 260/2480 MW | — | View |
| Swallow Tail BESS | AMPYR | Publicly Announced | Storage - Battery | Other - Other | 375/1500 MW | — | View | |
| Swanbank BESS | CleanCo QLD Limited | Anticipated | Storage - Battery | Other - Other | 250/500 MW | Nov 2025 | View | |
| Tabulam BESS | Elgin Energy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 120 MW | — | View | |
| Tabulam Solar Farm | Elgin Energy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 126 MW | — | View | |
| Tailem Bend Stage 3 | TBSOL | Publicly Announced | Storage - Battery | Other - Other | 204/408 MW | — | View | |
| Talbingo BESS | Talbingo Battery Pty Ltd ATF Talbingo Battery Trust | Publicly Announced | Storage - Battery | Other - Other | 400/1600 MW | — | View | |
| Tallawang Solar And BESS | Enel Green Power Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 500 MW | — | View | |
| Tallawang Solar And BESS | Enel Green Power Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 672/1000 MW | — | View | |
| Tamworth Energy Reserve - KCI | The Trustee for Equis Energy (Ausralia) Ngumi 4 Asset Trust | Publicly Announced | Storage - Battery | Other - Other | 300 MW | — | View | |
| Tangkam BESS - KCI | Atria Energy Ltd | Publicly Announced | Storage - Battery | Other - Other | 100 MW | — | View | |
| Tarong BESS - Stanwell | Stanwell Corporation Limited | Committed* | Storage - Battery | Other - Other | TARBESS1 | 300/600 MW | Sep 2025 | View |
| Tarong West Wind Farm (Ironleaf) | RES Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 437 MW | Oct 2028 | View | |
| Tarraleah Redevelopment | HYDROTAS | Publicly Announced | Hydro - Dam | Hydro - Water | 200 MW | — | View | |
| Tarrone BESS - Storage - KCI | Global Power Generation Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | — | View | |
| Tarrone GT | AGL Energy Limited | Publicly Announced | Turbine - OCGT | Fossil - Natural Gas Pipeline | 600 MW | — | View | |
| Tchelery BESS | Neoen Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 300/1200 MW | — | View | |
| Tchelery Wind Farm | Neoen Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 600 MW | Jun 2030 | View | |
| Teebar Creek Battery Storage - KCI | ATMOS DEVELOPMENTS PTY LTD | Publicly Announced | Storage - Battery | Other - Other | 400/1600 MW | — | View | |
| Templers B BESS | BORAL | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | — | View | |
| Templers BESS | ZEN Energy Future Pty Ltd | Committed | Storage - Battery | Other - Other | 111/291 MW | Aug 2025 | View | |
| Tenterfield Solar Farm | Enerparc Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 29 MW | Feb 2026 | View | |
| Terang BESS | frv_NR | Anticipated | Storage - Battery | Other - Other | TRGBESS | 144/200 MW | Jun 2026 | View |
| Territory Battery | Neoen Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | — | View | |
| Texas BESS | FRV | Publicly Announced | Storage - Battery | Solar - Solar | 400 MW | — | View | |
| Texas Solar Farm | FRV | Publicly Announced | Solar PV - Fixed | Solar - Solar | 150 MW | — | View | |
| The Block BESS | Samsung C&T Renewable Energy Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 324/1200 MW | Dec 2028 | View | |
| The Central BESS - KCI | ACEnergy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 648/1000 MW | — | View | |
| The Plains | Engie | Publicly Announced | Storage - Battery | Other - Other | 400/400 MW | — | View | |
| The Plains | Engie | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 484 MW | — | View | |
| The Solar River Project - Stage 1 | The Solar River Project Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 200 MW | — | View | |
| The Solar River Project - Stage 2 | The Solar River Project Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 200 MW | — | View | |
| Theodore BESS | RWE | Publicly Announced | Storage - Battery | Other - Other | 240/960 MW | — | View | |
| Theodore Solar Farm | Theodore SF Pty Ltd as trustee for Theodore SF Trust | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 70 MW | — | View | |
| Theodore Wind Farm | RWE Renewables Australia | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 992 MW | — | View | |
| Thomastown BESS | Ausnet Transmission Group Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 300/600 MW | Dec 2027 | View | |
| Three Rivers BESS | Iberdrola Australia Development Pty Ltd. | Publicly Announced | Storage - Battery | Other - Other | 500/1000 MW | — | View | |
| Three Rivers Solar Farm | Iberdrola Australia Development Pty Ltd. | Publicly Announced | Solar PV - Fixed | Solar - Solar | 700 MW | — | View | |
| Thunderbolt Wind Farm | Neoen Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 210 MW | — | View | |
| Ticoba BESS | European Energy Australia P/L | Publicly Announced | Storage - Battery | Other - Other | 550 MW | — | View | |
| Ticoba Solar Farm | European Energy Australia P/L | Publicly Announced | Solar PV - Fixed | Solar - Solar | 550 MW | — | View | |
| Tieri BESS | FRV Service Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | TieriBESS1 | 103/200 MW | — | View |
| Tilbuster Solar Farm | Enerparc Australia Pty Ltd | Committed | Solar PV - Fixed | Solar - Solar | 249 MW | Mar 2026 | View | |
| Tirranna BESS - KCI | StorEnergy 2 Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 400/400 MW | — | View | |
| Tomago BESS | AGL | Publicly Announced | Storage - Battery | Other - Other | 500/2000 MW | — | View | |
| Toolern Vale BESS | tetrisenergy_nr | Publicly Announced | Storage - Battery | Other - Other | 25/200 MW | — | View | |
| Toolern Vale Solar Farm | tetrisenergy_nr | Publicly Announced | Solar PV - Fixed | Solar - Solar | 15 MW | — | View | |
| Toolern Vale Solar Farm_SS | tetrisenergy_nr | Publicly Announced | Solar PV - Fixed | Solar - Solar | 15 MW | — | View | |
| Townsville BESS | ACEnergy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| Tramway Road BESS | Eku Energy Projects (Australia) Pty Ltd as trustee for the Eku Energy Projects Australia Trust | Publicly Announced | Storage - Battery | Other - Other | 300/1200 MW | — | View | |
| Triabunna Wind Farm | Triabunna Wind Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 32 MW | — | View | |
| Tribute Pumped Hydro Option | Hydro-Electric Corporation | Publicly Announced | Storage - Pumped hydro | Hydro - Water | 750/18750 MW | — | View | |
| Tuckeroo BESS - KCI | Tuckeroo BESS Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 500/500 MW | — | View | |
| Tully BESS | RWE Renewables Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200/200 MW | — | View | |
| Tummaville Hybrid Facility - BESS (KCI) | Elements Green Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 500/1000 MW | — | View | |
| Tummaville Hybrid Facility - Solar (KCI) | Elements Green Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 500 MW | — | View | |
| Tumuruu BESS | Austraiian Solar | Publicly Announced | Storage - Battery | Other - Other | 295 MW | — | View | |
| Tumuruu Solar Farm | Austraiian Solar | Publicly Announced | Solar PV - Fixed | Solar - Solar | 464 MW | — | View | |
| Tyrone BESS | European Energy Australia P/L | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Tyrone Solar | European Energy Australia P/L | Publicly Announced | Solar PV - Fixed | Solar - Solar | 400 MW | — | View | |
| Upper Calliope Solar Farm (side A) | European Energy S/A | Publicly Announced | Solar PV - Fixed | Solar - Solar | 291 MW | — | View | |
| Upper Hunter BESS | Maizewood Pty Ltd. | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Upper Hunter Energy Park - Solar | Upper Hunter Energy Park Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 10 MW | — | View | |
| Upper Hunter Energy Park - Wind | Upper Hunter Energy Park Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 76 MW | — | View | |
| Uungula BESS | Squadron Energy Services Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 400/400 MW | — | View | |
| Uungula Wind Farm | Uungula Wind Farm Pty Ltd | Committed | Wind Turbine - Onshore | Wind - Wind | 414 MW | Feb 2028 | View | |
| Vales Point BESS | Delta Power and Energy (Vales Point) Pty Ltd trading as Delta Electricity | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Vales Point Solar | Delta Electricity | Publicly Announced | Solar PV - Fixed | Solar - Solar | 55 MW | — | View | |
| Valley of the Winds | ACEN Renewables | Anticipated | Wind Turbine - Onshore | Wind - Wind | 148 MW | Dec 2030 | View | |
| Vast Solar 1 | Vast Solar 1 Pty Ltd | Publicly Announced | Solar Thermal - Other | Solar - Solar | 34 MW | — | View | |
| Vineyard BESS | Global Power Generation Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | — | View | |
| Wagga North Battery Energy Storage System | AE BESS 2 Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 120 MW | — | View | |
| Wagga North BESS - KCI | ZEN Energy Future Pty Ltd | Publicly Announced | Storage - Battery | Solar - Solar | 105/420 MW | Jun 2028 | View | |
| Wagga North BESS (IB Vogt) - KCI | Ib vogt Development Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 120/480 MW | — | View | |
| Wagga North Solar Farm BESS | Wagga Wagga Operationsco Pty Ltd as trustee for the Wagga Wagga Operations Trust | Publicly Announced | Storage - Battery | Solar - Solar | 15/30 MW | — | View | |
| Wagga Wagga BESS | tetrisenergy_nr | Publicly Announced | Storage - Battery | Other - Other | 415/1660 MW | — | View | |
| Wallabadah BESS | North Harbour Clean Energy P/L | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Wallaroo Solar Farm | New Energy development and Univergy Solar Joint venture (SPV) Wallaroo Solar Farm Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 122 MW | — | View | |
| Wallerawang 9 BESS | Greenspot Wallerawang Pty Ltd as trustee for the Greenspot Wallerawang Unit Trust | Publicly Announced | Storage - Battery | Other - Other | 300/600 MW | — | View | |
| Wambo Wind Farm | Cubico Sustainable Investments Australia Pty Ltd | Committed | Wind Turbine - Onshore | Wind - Wind | WAMBOWF1 | 252 MW | Feb 2025 | View |
| Wambo Wind Farm | Cubico Sustainable Investments Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 248 MW | — | View | |
| Wamuran BESS - KCI | RTB Renewables Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 630/630 MW | — | View | |
| Wandoan South Solar Stage 2 | TBSOL | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 240 MW | — | View | |
| Waratah Super Battery | Munmorah Battery ProjectCo Pty Ltd | Committed | Storage - Battery | Other - Other | WTAHB1 | 850/1680 MW | Mar 2025 | View |
| Warrenheip BESS | AE Solar 6 Pty Ltd as Trustee for AE Solar 6 Unit Trust | Publicly Announced | Storage - Battery | Other - Other | 240/240 MW | — | View | |
| Watta Wella Wind Farm - KCI | RES Australia Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 376 MW | — | View | |
| Wattle Creek Energy Hub - Battery Storage | Wattle Creek Energy Hub P/L | Publicly Announced | Storage - Battery | Other - Other | 350/1400 MW | Oct 2028 | View | |
| Wattle Creek Energy Hub - Solar / BESS | Wattle Creek Energy Hub P/L | Publicly Announced | Solar PV - Fixed | Solar - Solar | 265 MW | Dec 2028 | View | |
| Wattle Creek Energy Hub - Solar / BESS | Wattle Creek Energy Hub P/L | Publicly Announced | Storage - Battery | Solar - Solar | 100/200 MW | Dec 2028 | View | |
| Waubra BESS - KCI | Acciona Energy Australia Global | Publicly Announced | Storage - Battery | Other - Other | 200/200 MW | — | View | |
| Weasel Solar Farm And BESS - KCI | Weasel Solar Farm P/L | Publicly Announced | Storage - Battery | Solar - Solar | 144 MW | — | View | |
| Weasel Solar Farm And BESS - KCI | Weasel Solar Farm P/L | Publicly Announced | Solar PV - Fixed | Solar - Solar | 144 MW | — | View | |
| Wee Jasper Wind Farm | tetrisenergy_nr | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 350 MW | — | View | |
| Wellington A-CAES | Hydrostor Australia Holdings P/L | Publicly Announced | Storage - Other | Other - Other | 500/4000 MW | — | View | |
| Wellington BESS - Stage 1 | AMPYR | Publicly Announced | Storage - Battery | Other - Other | 300/600 MW | — | View | |
| Wellington BESS - Stage 2 | AMPYR Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | — | View | |
| Wellington North BESS - KCI | Lightsource Development Services Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 500 MW | — | View | |
| Wellington North Solar Farm | AGL Hydro Partnership | Publicly Announced | Solar PV - Fixed | Solar - Solar | 300 MW | — | View | |
| West Mokoan Solar Farm | West Mokoan Solar Farm | Publicly Announced | Storage - Battery | Other - Other | 160/560 MW | — | View | |
| West Mokoan Solar Farm | West Mokoan Solar Farm | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 400 MW | — | View | |
| West Wellington Wind Farm | Mint Renewables | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 468 MW | — | View | |
| West Wyalong BESS | Lightsource BP | Publicly Announced | Storage - Battery | Other - Other | 50/90 MW | — | View | |
| Western Downs Gas Peaking Plant - KCI | PowerGen P51 Pty Ltd | Publicly Announced | Turbine - CCGT | Other - Other | 207 MW | — | View | |
| Western Plains Wind Farm | ARK Energy Corporation Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 50 MW | — | View | |
| Western Sydney Energy & Resource Recovery Centre | Western Sydney Energy & Resource Recovery Centre | Publicly Announced | Other - Other | Other - Other | 58 MW | — | View | |
| Whaleback Ridge Wind Farm - KCI | West Coast Renewables Energy Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 288 MW | — | View | |
| White Rock Wind Farm - Stage 2 | White Rock Wind Farm Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 353 MW | Mar 2027 | View | |
| Whyalla | Adani | Publicly Announced | Solar PV - Fixed | Solar - Solar | 140 MW | — | View | |
| Whyalla BESS - KCI | BESS Kalkallo Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 100 MW | — | View | |
| Willatook | Wind Prospect WA Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 354 MW | — | View | |
| Willavale BESS | X-Elio Willavale Park Trust | Publicly Announced | Storage - Battery | Other - Other | 300/600 MW | — | View | |
| Willavale Solar Farm | X-Elio Australia Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 50 MW | — | View | |
| Williamsdale BESS | EKU Energy | Publicly Announced | Storage - Battery | Other - Other | 250/500 MW | — | View | |
| Willowvale Solar Farm - KCI | Elgin Energy Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 200 MW | — | View | |
| Wimmera Plains BESs | BayWA r.e Projects Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 100/400 MW | — | View | |
| Wimmera Plains Wind Farm - KCI | Wimmera Plains Energy Facility Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 312 MW | — | View | |
| Winchelsea Gas Turbines - KCI | APA Power Holdings Pty Ltd | Publicly Announced | Turbine - OCGT | Other - Other | 220 MW | — | View | |
| Winterbourne Wind Farm | WinterbourneWind Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 732 MW | — | View | |
| Winton BESS | AE BESS 10 as Trustee for AE BESS 10 Unit Trust | Publicly Announced | Storage - Battery | Other - Other | 120/480 MW | — | View | |
| Winton Energy Reserve 1 | Lochard Energy | Publicly Announced | Storage - Battery | Other - Other | 200/400 MW | — | View | |
| Winton Energy Reserve 1 | Lochard Energy | Publicly Announced | Reciprocating Engine - Spark ignition | Fossil - Natural Gas | 200 MW | — | View | |
| Winton North Solar Farm | EE Solar 12 Pty Ltd as trustee for the EE Solar 12 Trust | Publicly Announced | Solar PV - Fixed | Solar - Solar | 100 MW | — | View | |
| Wodonga BESS | IBERDROLA AUSTRALIA DEVELOPMENT PTY LIMITED | Publicly Announced | Storage - Battery | Other - Other | 250/500 MW | — | View | |
| Wodonga Solar Farm | Wodonga Solar Power | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 76 MW | — | View | |
| Wollar BESS | Wollar Solar Finance Pty Ltd. | Publicly Announced | Storage - Battery | Other - Other | 300 MW | — | View | |
| Wollar Solar Farm | Wollar Solar Development Pty Ltd | Committed | Solar PV - Single axis tracking | Solar - Solar | WOLARSF1 | 280 MW | May 2025 | View |
| Wollert Gas Turbine - KCI | APA Power Holdings Pty Ltd | Publicly Announced | Turbine - OCGT | Other - Other | 600 MW | — | View | |
| Wombelano Wind Farm | Wind Projects Australia Project 1 Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 24 MW | — | View | |
| Wongalea BESS | Eku Energy Projects (Australia) as trustee for the Eku Energy Projects (Australia) Trust | Publicly Announced | Storage - Battery | Other - Other | 300/1200 MW | — | View | |
| Wooderson Solar Farm | Wooderson Solar Development Company Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 450 MW | May 2030 | View | |
| Woodland BESS | Risen Energy (Australia) Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 250/1000 MW | — | View | |
| Woodstock BESS | AGL Energy Limited | Publicly Announced | Storage - Battery | Other - Other | 500 MW | — | View | |
| Woodstock Renewable Energy Hub - BESS | Private Energy Partners | Publicly Announced | Storage - Battery | Other - Other | 250/250 MW | — | View | |
| Woodstock Renewable Energy Hub - Solar | Private Energy Partners | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 400 MW | — | View | |
| Woolooga BESS | Woolooga BESS Fund Pty Limited as trustee for the Woolooga BESS Trust | Committed | Storage - Battery | Other - Other | 277/400 MW | Jun 2026 | View | |
| Woolooga BESS - KCI | Elements Green Australia Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 400 MW | — | View | |
| Woolsthorpe Wind Farm | Woolsthorpe Wind Farm Pty Ltd | Anticipated | Wind Turbine - Onshore | Wind - Wind | 72 MW | Jan 2027 | View | |
| Woonga Creek BESS | Lightsource BP | Publicly Announced | Storage - Battery | Other - Other | 750 MW | — | View | |
| Wooreen Energy Storage System | EnergyAustralia Holdings Limited | Committed* | Storage - Battery | Other - Other | 350/1400 MW | Dec 2027 | View | |
| Wooroora Station Wind Farm | ARK Energy Corporation Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 322 MW | — | View | |
| Wurdong BESS | Wurdong ProjectCo Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 405/1620 MW | — | View | |
| X-Elio - Sixteen Mile SF BESS | The Trustee for X-ELIO SIXTEEN MILE TRUST | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 350 MW | — | View | |
| Yabulu BESS | Yabulu BESS Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 2/400 MW | — | View | |
| Yabulu Solar Farm | Yabulu Solar Farm Pty Ltd | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 4 MW | Mar 2028 | View | |
| Yabulu South BESS | Yabulu South BESS Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 200/800 MW | — | View | |
| Yadnarie Solar Farm | Photon Energy Group | Publicly Announced | Solar PV - Fixed | Solar - Solar | 192 MW | — | View | |
| Yambla Range BESS | tetrisenergy_nr | Publicly Announced | Storage - Battery | Other - Other | 100/800 MW | — | View | |
| Yambla Range Wind Farm | tetrisenergy_nr | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 200 MW | — | View | |
| Yanco BESS | Acenergy Pty Ltd | Publicly Announced | Storage - Battery | Other - Other | 250/250 MW | — | View | |
| Yanco Solar Farm | Origin Energy | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 60 MW | May 2027 | View | |
| Yarrabee Solar Power Project | Origin Energy | Publicly Announced | Solar PV - Single axis tracking | Solar - Solar | 584 MW | Jul 2029 | View | |
| Yelarbon SF and BESS - KCI | Elgin Energy | Publicly Announced | Storage - Battery | Other - Other | 200 MW | — | View | |
| Yelarbon SF and BESS - KCI | Elgin Energy | Publicly Announced | Solar PV - Fixed | Solar - Solar | 200 MW | — | View | |
| Yoorndoo Ilga Solar - KCI | Yoorndoo Ilga Solar Pty Ltd | Publicly Announced | Solar PV - Fixed | Solar - Solar | 250 MW | — | View | |
| Yorke Peninsula Wind Farm | Yorke Peninsula Wind Farm Project Pty Ltd | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 749 MW | Sep 2030 | View | |
| Yumali BESS | tetrisenergy_nr | Publicly Announced | Storage - Battery | Other - Other | 95/760 MW | — | View | |
| Yumali Wind Farm | tetrisenergy_nr | Publicly Announced | Wind Turbine - Onshore | Wind - Wind | 302 MW | — | View |
No generators match the selected filters.