Onshore and offshore wind farms across the NEM — existing and proposed projects. Stats for the selected period. Data through 20 Sep 2026, 07:55 AEST.
Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.
| Site | DUID | Region | Tech | Energy rev. (× MLF) | FCAS rev. (× MLF) | FCAS MWh | MWh dispatch | MWh available | Capacity factor | Est. SRMC | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Coopers Gap Wind Farm | COOPGWF1 |
QLD1 | Wind Turbine - Onshore | $108.2k | $0 | — | 1,400.2 | 1,250.0 | 39.1% | $0.68 | View |
| Wambo Wind Farm | WAMBOWF1 |
QLD1 | Wind Turbine - Onshore | $60.0k | $0 | — | 782.8 | 673.0 | 39.2% | $0.50 | View |
| Dulacca Wind Farm | DULAWF1 |
QLD1 | Wind Turbine - Onshore | $56.9k | $0 | — | 789.3 | 498.7 | 57.6% | $0.53 | View |
| Silverton Wind Farm | STWF1 |
NSW1 | Wind Turbine - Onshore | $52.4k | $0 | — | 740.5 | 400.4 | 47.0% | $0.50 | View |
| Collector | COLWF01 |
NSW1 | Wind Turbine - Onshore | $38.7k | $0 | — | 582.1 | 323.3 | 32.4% | $0.65 | View |
| Taralga Wind Farm | TARALGA1 |
NSW1 | Wind Turbine - Onshore | $38.3k | $0 | — | 522.6 | 300.6 | 61.8% | $0.50 | View |
| Gullen Range Wind Farm | GULLRWF1 |
NSW1 | Wind Turbine - Onshore | $36.7k | $0 | — | 527.5 | 299.4 | 40.3% | $0.53 | View |
| Rye Park Wind Farm | RYEPARK1 |
NSW1 | Wind Turbine - Onshore | $28.7k | $0 | — | 467.7 | 155.5 | 14.9% | $0.50 | View |
| Capital Wind Farm | CAPTL_WF |
NSW1 | Wind Turbine - Onshore | $23.0k | $0 | — | 334.1 | — | 30.0% | $0.00 | View |
| Boco Rock Wind Farm | BOCORWF1 |
NSW1 | Wind Turbine - Onshore | $22.1k | $0 | — | 332.4 | 182.1 | 37.2% | $0.00 | View |
| Clarke Creek Wind Farm | CLRKCWF1 |
QLD1 | Wind Turbine - Onshore | $21.9k | $0 | — | 317.1 | 231.5 | 11.6% | $0.00 | View |
| Mount Emerald | MEWF1 |
QLD1 | Wind Turbine - Onshore | $20.3k | $0 | — | 281.5 | 421.6 | 19.7% | $0.50 | View |
| Kaban Wind Farm | KABANWF1 |
QLD1 | Wind Turbine - Onshore | $17.3k | $0 | — | 265.9 | 297.0 | 21.4% | $0.00 | View |
| Gullen Range Wind Farm 2 | GULLRWF2 |
NSW1 | Wind Turbine - Onshore | $15.2k | $0 | — | 211.1 | 105.8 | 24.1% | $0.50 | View |
| Woodlawn Wind Farm | WOODLWN1 |
NSW1 | Wind Turbine - Onshore | $13.8k | $0 | — | 215.2 | 108.6 | 56.3% | $0.50 | View |
| Crookwell 2 Wind Farm | CROOKWF2 |
NSW1 | Wind Turbine - Onshore | $12.7k | $0 | — | 187.8 | 90.3 | 24.7% | $0.69 | View |
| Gunning Wind Farm | GUNNING1 |
NSW1 | Wind Turbine - Onshore | $12.4k | $0 | — | 180.3 | 95.5 | 49.0% | $0.50 | View |
| Crudine Ridge Wind Farm | CRURWF1 |
NSW1 | Wind Turbine - Onshore | $10.9k | $0 | — | 147.6 | 101.8 | 13.2% | $0.53 | View |
| MacIntyre Wind Farm | MCINTYR1 |
QLD1 | Wind Turbine - Onshore | $10.0k | $0 | — | 136.9 | 123.0 | 1.9% | $0.58 | View |
| Kennedy Energy Park - Phase 1 - Wind | KEPWF1 |
QLD1 | Wind Turbine - Onshore | $9.2k | $0 | — | 140.6 | 157.0 | 41.1% | $0.68 | View |
| Crookwell 3 Wind Farm | CROOKWF3 |
NSW1 | Wind Turbine - Onshore | $7.9k | $0 | — | 120.2 | 55.0 | 26.4% | $0.76 | View |
| Cullerin Range Wind Farm | CULLRGWF |
NSW1 | Wind Turbine - Onshore | $7.6k | $0 | — | 113.6 | — | 47.8% | $0.68 | View |
| White Rock Wind Farm - Stage 1 | WRWF1 |
NSW1 | Wind Turbine - Onshore | $7.4k | $0 | — | 140.4 | 66.7 | 10.1% | $0.50 | View |
| Clarke Creek Wind Farm | CLRKCWF2 |
QLD1 | Wind Turbine - Onshore | $6.4k | $0 | — | 92.3 | 58.7 | 11.3% | $0.58 | View |
| Bango 973 Wind Farm | BANGOWF1 |
NSW1 | Wind Turbine - Onshore | $5.8k | $0 | — | 109.2 | 33.4 | 8.7% | $0.00 | View |
| Bango 999 Wind Farm | BANGOWF2 |
NSW1 | Wind Turbine - Onshore | $4.6k | $0 | — | 68.0 | 27.6 | 10.1% | $0.00 | View |
| GPWFWST2 | GPWFWST2 |
VIC1 | $686 | $0 | — | 194.9 | 804.1 | 4.4% | $0.53 | View | |
| Yendon Wind Farm | YENDWF1 |
VIC1 | Wind Turbine - Onshore | $469 | $0 | — | 194.6 | 525.4 | 17.0% | $0.50 | View |
| Port Augusta Renewable Energy Park - Wind | PAREPW1 |
SA1 | Wind Turbine - Onshore | $390 | $0 | — | 418.4 | 509.3 | 26.3% | $0.50 | View |
| Golden Plains Wind Farm East | GPWFEST2 |
VIC1 | Wind Turbine - Onshore | $377 | $0 | — | 127.7 | 834.1 | 6.2% | $0.50 | View |
| GPWFWST1 | GPWFWST1 |
VIC1 | $313 | $0 | — | 349.4 | 844.2 | 7.9% | $0.53 | View | |
| Flyers Creek Wind Farm | FLYCRKWF |
NSW1 | Wind Turbine - Onshore | $313 | $0 | — | 4.1 | 1.5 | 0.4% | $0.58 | View |
| Bodangora Wind Farm | BODWF1 |
NSW1 | Wind Turbine - Onshore | $296 | $0 | — | 5.8 | 1.3 | 0.6% | $0.68 | View |
| Golden Plains Wind Farm East | GPWFEST1 |
VIC1 | Wind Turbine - Onshore | $215 | $0 | — | 80.3 | 654.5 | 4.1% | $0.00 | View |
| Elaine Wind Farm | ELAINWF1 |
VIC1 | Wind Turbine - Onshore | $186 | $0 | — | 80.4 | 264.2 | 12.2% | $0.53 | View |
| Hawkesdale Wind Farm | HD1WF1 |
VIC1 | Wind Turbine - Onshore | $172 | $0 | — | 160.7 | 356.6 | 21.0% | $0.00 | View |
| Lake Bonney 1 Wind Farm | LKBONNY1 |
SA1 | Wind Turbine - Onshore | $167 | $0 | — | 117.0 | 236.8 | 18.4% | $0.79 | View |
| Salt Creek Wind Farm | SALTCRK1 |
SA1 | Wind Turbine - Onshore | $156 | $0 | — | 49.6 | 180.9 | 11.6% | $0.50 | View |
| Lake Bonney 3 Wind Farm | LKBONNY3 |
SA1 | Wind Turbine - Onshore | $28 | $0 | — | 24.6 | 80.6 | 8.0% | $0.53 | View |
| Murra Warra Wind Farm - stage 1 | MUWAWF1 |
VIC1 | Wind Turbine - Onshore | $2 | $0 | — | 9.2 | 378.3 | 0.5% | $0.50 | View |
| Goyder South Wind Farm 1B | GSWF1B1 |
SA1 | Wind Turbine - Onshore | $-118 | $0 | — | 468.7 | 689.9 | 29.1% | $0.00 | View |
| Lake Bonney 2 Wind Farm | LKBONNY2 |
SA1 | Wind Turbine - Onshore | $-201 | $0 | — | 205.7 | 427.5 | 16.3% | $0.86 | View |
| Snowtown Wind Farm | SNOWTWN1 |
SA1 | Wind Turbine - Onshore | $-205 | $0 | — | 336.0 | 386.5 | 43.0% | $0.50 | View |
| Diapur Wind Farm | DIAPURWF1 |
VIC1 | Wind Turbine - Onshore | $-303 | $0 | — | 36.7 | — | 57.9% | $0.00 | View |
| Cherry Tree Wind Farm | CHYTWF1 |
VIC1 | Wind Turbine - Onshore | $-389 | $0 | — | 105.2 | 98.2 | 23.1% | $0.53 | View |
| Canunda | CNUNDAWF |
SA1 | Wind Turbine - Onshore | $-460 | $0 | — | 160.7 | 145.9 | 44.1% | $0.50 | View |
| Mortons Lane Wind Farm | MLWF1 |
VIC1 | Wind Turbine - Onshore | $-574 | $0 | — | 92.9 | — | 60.2% | $0.50 | View |
| Yambuk | YAMBUKWF |
VIC1 | Wind Turbine - Onshore | $-594 | $0 | — | 94.7 | — | 39.9% | $0.50 | View |
| Yaloak South Wind Farm | YSWF1 |
VIC1 | Wind Turbine - Onshore | $-701 | $0 | — | 111.8 | — | 49.2% | $0.50 | View |
| Hallett 5 The Bluff WF | BLUFF1 |
SA1 | Wind Turbine - Onshore | $-813 | $0 | — | 282.3 | 208.0 | 67.9% | $0.77 | View |
| KIATAWF1 | KIATAWF1 |
VIC1 | $-830 | $0 | — | 137.8 | 68.3 | 56.1% | $0.68 | View | |
| Dundonnell Wind Farm | DUNDWF2 |
VIC1 | Wind Turbine - Onshore | $-847 | $0 | — | 145.7 | 149.3 | 39.8% | $0.66 | View |
| Challicum Hills | CHALLHWF |
VIC1 | Wind Turbine - Onshore | $-850 | $0 | — | 152.2 | — | 36.6% | $0.53 | View |
| Cathedral Rocks | CATHROCK |
SA1 | Wind Turbine - Onshore | $-869 | $0 | — | 304.4 | 226.4 | 62.0% | $0.53 | View |
| Starfish Hill | STARHLWF |
SA1 | Wind Turbine - Onshore | $-964 | $0 | — | 140.5 | 83.8 | 53.8% | $0.50 | View |
| Hallett Stage 2 Hallett Hill | HALLWF2 |
SA1 | Wind Turbine - Onshore | $-971 | $0 | — | 345.6 | 258.4 | 61.1% | $0.00 | View |
| Lincoln Gap Wind Farm - Stage 2 | LGAPWF2 |
SA1 | Wind Turbine - Onshore | $-1.2k | $0 | — | 413.3 | 331.6 | 60.4% | $0.50 | View |
| Hallett Stage 1 Brown Hill | HALLWF1 |
SA1 | Wind Turbine - Onshore | $-1.2k | $0 | — | 427.4 | 318.1 | 57.1% | $0.71 | View |
| Woolnorth Studland Bay / Bluff Point | WOOLNTH1 |
TAS1 | Wind Turbine - Onshore | $-1.3k | $0 | — | 153.8 | — | 14.1% | $0.53 | View |
| Mt Millar Wind Farm | MTMILLAR |
SA1 | Wind Turbine - Onshore | $-1.3k | $0 | — | 400.9 | 266.8 | 70.1% | $0.50 | View |
| Lincoln Gap Wind Farm - stage 1 | LGAPWF1 |
SA1 | Wind Turbine - Onshore | $-1.3k | $0 | — | 524.0 | 415.5 | 52.5% | $0.50 | View |
| Hallett 4 North Brown Hill | NBHWF1 |
SA1 | Wind Turbine - Onshore | $-1.7k | $0 | — | 618.4 | 464.7 | 59.0% | $0.80 | View |
| Crowlands Wind Farm | CROWLWF1 |
VIC1 | Wind Turbine - Onshore | $-1.8k | $0 | — | 375.4 | 209.4 | 59.3% | $0.68 | View |
| Clements Gap Wind Farm | CLEMGPWF |
SA1 | Wind Turbine - Onshore | $-2.3k | $0 | — | 291.2 | 154.6 | 64.9% | $0.80 | View |
| Mt Mercer Wind Farm | MERCER01 |
VIC1 | Wind Turbine - Onshore | $-2.8k | $0 | — | 701.1 | 456.3 | 67.5% | $0.50 | View |
| Sapphire Wind Farm | SAPHWF1 |
SA1 | Wind Turbine - Onshore | $-2.8k | $0 | — | 291.6 | 154.2 | 13.6% | $0.50 | View |
| Goyder South Wind Farm 1A | GSWF1A |
SA1 | Wind Turbine - Onshore | $-2.9k | $0 | — | 812.0 | 647.5 | 49.1% | $0.55 | View |
| Berrybank Wind Farm | BRYB2WF2 |
VIC1 | Wind Turbine - Onshore | $-2.9k | $0 | — | 558.0 | 317.5 | 64.5% | $0.65 | View |
| Granville Harbour Wind Farm | GRANWF1 |
TAS1 | Wind Turbine - Onshore | $-3.1k | $0 | — | 512.3 | 237.7 | 58.0% | $0.66 | View |
| Oaklands Hill Wind Farm | OAKLAND1 |
VIC1 | Wind Turbine - Onshore | $-3.3k | $0 | — | 328.7 | 157.6 | 61.8% | $0.50 | View |
| Wattle Point | WPWF |
SA1 | Wind Turbine - Onshore | $-3.5k | $0 | — | 544.7 | 314.6 | 75.8% | $0.50 | View |
| Dundonnell Wind Farm | DUNDWF3 |
VIC1 | Wind Turbine - Onshore | $-3.5k | $0 | — | 421.3 | 399.8 | 43.7% | $0.53 | View |
| Musselroe Wind Farm | MUSSELR1 |
TAS1 | Wind Turbine - Onshore | $-3.6k | $0 | — | 760.7 | 437.0 | 57.2% | $0.50 | View |
| Mt Gellibrand Wind Farm | MTGELWF1 |
VIC1 | Wind Turbine - Onshore | $-3.6k | $0 | — | 474.0 | 271.7 | 43.2% | $0.50 | View |
| Cattle Hill Wind Farm | CTHLWF1 |
TAS1 | Wind Turbine - Onshore | $-3.6k | $0 | — | 906.4 | 538.5 | 79.5% | $0.66 | View |
| Waubra | WAUBRAWF |
VIC1 | Wind Turbine - Onshore | $-3.9k | $0 | — | 617.8 | — | 40.6% | $0.50 | View |
| Willogoleche Wind Farm | WGWF1 |
SA1 | Wind Turbine - Onshore | $-3.9k | $0 | — | 460.4 | 365.7 | 48.6% | $0.50 | View |
| Snowtown S2 Wind Farm | SNOWSTH1 |
SA1 | Wind Turbine - Onshore | $-4.2k | $0 | — | 748.7 | 466.8 | 75.1% | $0.74 | View |
| Portland Wind Farm | PORTWF |
VIC1 | Wind Turbine - Onshore | $-4.3k | $0 | — | 578.6 | — | 48.2% | $0.50 | View |
| Hornsdale Wind Farm Stage 1 | HDWF1 |
SA1 | Wind Turbine - Onshore | $-4.6k | $0 | — | 644.9 | 380.6 | 79.5% | $0.50 | View |
| Dundonnell Wind Farm | DUNDWF1 |
VIC1 | Wind Turbine - Onshore | $-4.8k | $0 | — | 585.8 | 555.0 | 44.0% | $0.66 | View |
| Hornsdale Wind Farm Stage 2 | HDWF2 |
SA1 | Wind Turbine - Onshore | $-5.0k | $0 | — | 681.1 | 392.8 | 84.0% | $0.69 | View |
| Snowtown S2 Wind Farm | SNOWNTH1 |
SA1 | Wind Turbine - Onshore | $-5.0k | $0 | — | 711.9 | 421.1 | 62.5% | $0.50 | View |
| Bald Hills Wind Farm | BALDHWF1 |
VIC1 | Wind Turbine - Onshore | $-5.1k | $0 | — | 474.4 | 220.7 | 56.2% | $0.00 | View |
| Hornsdale Wind Farm Stage 3 | HDWF3 |
SA1 | Wind Turbine - Onshore | $-5.4k | $0 | — | 722.5 | 408.8 | 81.5% | $0.68 | View |
| Ararat Wind Farm | ARWF1 |
VIC1 | Wind Turbine - Onshore | $-5.9k | $0 | — | 737.8 | 355.3 | 38.8% | $0.00 | View |
| Bulgana Green Power Hub - Wind Farm | BULGANA1 |
VIC1 | Wind Turbine - Onshore | $-6.0k | $0 | — | 754.7 | 372.9 | 46.6% | $0.00 | View |
| Waterloo Wind Farm | WATERLWF |
SA1 | Wind Turbine - Onshore | $-6.1k | $0 | — | 855.6 | 501.2 | 82.6% | $0.50 | View |
| Golden Plains Wind Farm East | GPWFEST3 |
VIC1 | Wind Turbine - Onshore | $-6.9k | $0 | — | 1,314.7 | 775.7 | 67.0% | $0.50 | View |
| Moorabool Wind Farm | MOORAWF1 |
VIC1 | Wind Turbine - Onshore | $-7.6k | $0 | — | 1,704.1 | 1,046.8 | 69.0% | $0.50 | View |
| Mortlake South Wind Farm | MRTLSWF1 |
VIC1 | Wind Turbine - Onshore | $-8.1k | $0 | — | 921.0 | 472.9 | 73.9% | $0.50 | View |
| Berrybank Wind Farm | BRYB1WF1 |
VIC1 | Wind Turbine - Onshore | $-9.2k | $0 | — | 1,095.2 | 588.0 | 76.6% | $0.50 | View |
| Murra Warra Wind Farm - stage 2 | MUWAWF2 |
VIC1 | Wind Turbine - Onshore | $-9.8k | $0 | — | 904.2 | 339.3 | 54.6% | $0.50 | View |
| Ryan Corner Wind Farm | RYANCWF1 |
VIC1 | Wind Turbine - Onshore | $-10.4k | $0 | — | 1,175.8 | 696.6 | 68.0% | $0.50 | View |
| Macarthur Wind Farm | MACARTH1 |
VIC1 | Wind Turbine - Onshore | $-15.5k | $0 | — | 1,935.9 | 1,118.5 | 58.2% | $0.50 | View |
| Stockyard Hill Wind Farm | STOCKYD1 |
VIC1 | Wind Turbine - Onshore | $-26.7k | $0 | — | 2,793.1 | 1,406.0 | 66.9% | $0.50 | View |