NEM Gas Baseload Stats

CCGT and steam-cycle gas thermal plant across the NEM — baseload and mid-merit units, not open-cycle peakers. Stats for the selected period. Data through 14 Jun 2026, 00:20 AEST.

Browse by type
Energy revenue (× MLF)
$160.9k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
3,209.0 MWh
Capacity factor
4.4%
Generators
12

Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.

Site DUID Region Tech Energy rev. (× MLF) FCAS rev. (× MLF) FCAS MWh MWh dispatch MWh available Capacity factor Est. SRMC
Yarwun 1 YARWUN_1 QLD1 Turbine - CCGT $61.9k $0 1,333.7 618.7 30.9% $84.30 View
Osborne OSB-AG SA1 Turbine - CCGT $37.0k $0 659.6 15.3% $84.30 View
Pelican Point PPCCGT SA1 Turbine - CCGT $30.4k $0 453.1 3.6% $84.30 View
Tallawarra TALWA1 NSW1 Turbine - CCGT $20.7k $0 352.2 787.5 3.7% $84.30 View
Torrens Island B TORRB2 SA1 Turbine - Steam Sub Critical $10.9k $0 410.4 750.0 8.6% $5.47 View
Torrens Island B TORRB1 SA1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Torrens Island B TORRB3 SA1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Torrens Island B TORRB4 SA1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View
Townsville Power Station YABULU2 QLD1 Turbine - CCGT $0 $0 0.0% $84.30 View
Townsville Power Station YABULU QLD1 Turbine - CCGT $0 $0 0.0% $84.30 View
Tamar Valley Combined Cycle TVCC201 TAS1 Turbine - CCGT $0 $0 0.0% $84.30 View
Newport NPS VIC1 Turbine - Steam Sub Critical $0 $0 0.0% $2.00 View