NEM BESS Stats

Battery energy storage systems registered in the NEM — grid-scale and co-located storage. Stats for the selected period. Data through 20 Sep 2026, 08:55 AEST.

Browse by type
Energy revenue (× MLF)
$1.39M
FCAS revenue (× MLF)
$8.0k
FCAS volume
26,542.0 MWh
Dispatched
-3,892.7 MWh
Capacity factor
-2.0%
Generators
56

Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.

Site DUID Region Tech Energy rev. (× MLF) FCAS rev. (× MLF) FCAS MWh MWh dispatch MWh available Capacity factor Est. SRMC
Eraring Big Battery ERB01 NSW1 Storage - Battery $153.8k $0 -496.0 5,966.7 -8.6% $1.58 View
Orana BESS ORABESS1 NSW1 Storage - Battery $144.5k $301 88.3 -92.6 6,545.5 -0.9% $1.50 View
Waratah Super Battery WTAHB1 NSW1 Storage - Battery $128.8k $0 -1,126.4 11,558.6 -5.5% $1.50 View
Supernode BESS SNB02 QLD1 Storage - Battery $82.6k $0 -183.2 3,225.7 -2.9% $1.50 View
Liddell BESS LDBESS1 NSW1 Storage - Battery $77.2k $597 347.9 -73.6 7,169.0 -0.6% $1.50 View
Blyth BESS BLYTHB1 SA1 Storage - Battery $53.6k $720 544.2 -87.2 3,272.3 -1.8% $4.86 View
Tarong BESS - Stanwell TARBESS1 QLD1 Storage - Battery $49.9k $191 4,383.9 -58.8 4,075.0 -0.8% $1.50 View
Swanbank BESS SWANBBF1 QLD1 Storage - Battery $48.3k $0 -85.9 3,208.3 -1.4% $1.50 View
Rangebank BESS RANGEB1 VIC1 Storage - Battery $42.5k $0 -83.4 1,750.2 -1.7% $1.50 View
Victorian Big Battery VBB1 VIC1 Storage - Battery $42.3k $357 246.8 -75.1 3,323.7 -1.0% $1.50 View
Supernode BESS SNB01 QLD1 Storage - Battery $39.7k $0 -111.1 3,113.0 -1.8% $1.50 View
Limondale BESS LIMBESS1 NSW1 Storage - Battery $39.4k $110 30.1 -15.0 958.3 -1.2% $1.50 View
Templers B BESS TEMPB1 SA1 Storage - Battery $39.3k $0 -50.9 311.0 -1.9% $1.50 View
Koorangie Energy Storage System KESSB1 VIC1 Storage - Battery $37.8k $0 -48.4 1,496.9 -1.1% $1.50 View
Brendale BESS BRNDBES1 QLD1 Storage - Battery $34.6k $314 132.1 -53.1 3,156.6 -1.1% $1.58 View
Western Downs Battery - Stage 1 And 2 WDBESS1 QLD1 Storage - Battery $34.0k $833 405.2 -163.9 3,722.3 -2.7% $1.58 View
Mannum BESS MANNUMB1 SA1 Storage - Battery $30.6k $0 -34.9 1,520.7 -1.5% $1.50 View
Torrens Island BESS TIB1 SA1 Storage - Battery $30.6k $392 2,716.8 -120.8 2,056.5 -2.0% $1.50 View
Greenbank BESS GREENB1 QLD1 Storage - Battery $30.3k $73 1,259.2 -48.1 2,221.7 -1.0% $1.54 View
Ulinda Park BESS ULPBESS1 QLD1 Storage - Battery $25.3k $414 159.8 -63.3 2,850.8 -1.7% $1.50 View
Terang BESS TRGBESS1 VIC1 Storage - Battery $24.8k $1.9k 794.9 -212.0 1,205.2 -8.8% $1.50 View
Clements Gap - BESS CGBESS01 SA1 Storage - Battery $23.4k $0 -41.2 808.8 -2.9% $1.58 View
LaTrobe Valley BESS LVES1 VIC1 Storage - Battery $22.7k $144 3,728.0 -48.8 1,222.7 -2.0% $1.54 View
Hornsdale Power Reserve Unit 1 HPR1 SA1 Storage - Battery $17.1k $134 141.4 -32.3 816.7 -0.9% $1.50 View
Capital Battery CAPBES1 NSW1 Storage - Battery $16.5k $0 -27.8 1,572.0 -1.2% $1.50 View
Hazelwood Battery Energy Storage System (HBESS) HBESS1 VIC1 Storage - Battery $16.3k $220 120.0 -52.2 1,563.1 -1.1% $1.87 View
NESBESS1 NESBESS1 NSW1 $14.1k $0 84.7 966.7 1.8% $1.50 View
Chinchilla BESS CHBESS1 QLD1 Storage - Battery $11.8k $39 665.3 -24.1 1,139.7 -1.0% $1.75 View
Wandoan South BESS WANDB1 QLD1 Storage - Battery $9.5k $696 4,122.0 -64.0 1,511.3 -2.7% $1.50 View
Riverina Energy Storage System 2 RIVNB2 NSW1 Storage - Battery $9.2k $0 -15.5 672.2 -1.0% $1.50 View
Riverina Energy Storage System 1 RESS1 NSW1 Storage - Battery $8.3k $0 -15.0 650.9 -1.0% $1.50 View
Smithfield BESS SMTHBES1 NSW1 Storage - Battery $7.8k $49 2,356.9 -14.2 487.3 -0.7% $1.50 View
Bouldercombe Battery project BBATTERY1 QLD1 Storage - Battery $6.2k $185 879.5 -36.2 800.2 -3.0% $1.64 View
Tailem Bend Battery Project TB2B1 SA1 Storage - Battery $5.7k $74 331.2 -13.2 388.0 -1.3% $1.50 View
Wallgrove Grid Battery project WALGRV1 NSW1 Storage - Battery $4.8k $37 1,440.0 -14.9 399.6 -1.2% $1.50 View
Lake Bonney Battery Energy Storage LBB1 SA1 Storage - Battery $4.6k $27 739.9 -6.3 163.7 -1.0% $1.98 View
Darlington Point Energy Storage System DPNTB1 NSW1 Storage - Battery $3.4k $0 -6.0 241.6 -1.0% $0.00 View
Gannawarra Energy Storage System GANNB1 VIC1 Storage - Battery $2.9k $0 -4.4 42.8 -0.7% $1.98 View
Quorn Park Solar Hybrid QPSFB2 NSW1 Storage - Battery $2.6k $0 -3.8 95.3 -0.6% $1.58 View
Bulgana Green Power Hub - BESS BULBES1 VIC1 Storage - Battery $2.2k $56 631.2 -22.7 310.2 -4.7% $1.98 View
Ballarat Energy Storage System BALB1 VIC1 Storage - Battery $1.7k $0 -3.5 164.0 -0.5% $0.00 View
Williamsdale BESS WILLBES1 NSW1 Storage - Battery $1.4k $0 -207.8 -3.5% $1.50 View
Adelaide Desalination Plant ADPBA1 SA1 Storage - Battery $1.3k $17 150.2 -2.6 72.4 -1.4% $0.00 View
Philip Island BESS PIBESS1 VIC1 Storage - Battery $929 $88 33.3 -12.8 55.2 -10.7% $1.50 View
Happy Valley Reservoir HVWWBA1 SA1 Storage - Battery $900 $19 92.8 -2.0 49.8 -1.5% $1.58 View
Dalrymple BESS DALNTH1 SA1 Storage - Battery $574 $0 -7.4 206.5 -1.0% $2.03 View
Bolivar Waste Water Treatment BOWWBA1 SA1 Storage - Battery $544 $9 1.2 -1.3 24.6 -1.8% $1.58 View
Christies Beach Wastewater Treatment Plant CBWWBA1 SA1 Storage - Battery $450 $0 -0.8 24.6 -1.6% $1.50 View
SMFBESS1 SMFBESS1 SA1 $72 $0 -2.9 -0.1% $1.50 View
SMFBESS2 SMFBESS2 SA1 $70 $0 -2.8 0.0% $1.50 View
Kennedy Energy Park - Phase 1 - Storage KEPBG1 QLD1 Storage - Battery $0 $0 0.0% $2.03 View
LINCOLN GAP BESSBDU LGAPBS1 SA1 Storage - Battery $0 $0 0.0% $1.50 View
Queanbeyan BESS QBYNB1 NSW1 Storage - Battery $-8 $0 -0.2 -0.1% $1.50 View
NESBESS2 NESBESS2 NSW1 $-38 $0 -1.0 0.0% $1.50 View
Mornington BESS MRNBESS1 VIC1 Storage - Battery $-40 $0 0.9 0.0% $1.50 View
Broken Hill BHB1 NSW1 Storage - Battery $-216 $0 -7.2 -0.6% $1.50 View