NEM Other Generators Stats

Biomass, landfill gas, diesel, and other NEM units not in the main technology groups. Stats for the selected period. Data through 03 Nov 2026, 23:59 AEST.

Browse by type
Energy revenue (× MLF)
$69.0k
FCAS revenue (× MLF)
$4.9k
FCAS volume
2,171.6 MWh
Dispatched
494.2 MWh
Capacity factor
1.6%
Generators
17

Energy revenue = cleared MW × (5/60 h) × regional RRP × MLF. FCAS revenue = sum of cleared FCAS MW × (5/60 h) × regional FCAS price × MLF (raise/lower 6s, 60s, 5min, reg). FCAS volume = total FCAS enablement MWh across all services. Capacity factor = dispatched MWh ÷ (nameplate MW × period hours). SRMC from financial assumptions. Not AEMO settlement data.

Site DUID Region Tech Energy rev. (× MLF) FCAS rev. (× MLF) FCAS MWh MWh dispatch MWh available Capacity factor Est. SRMC
Broadwater BWTR1 NSW1 Turbine - Steam Sub Critical $44.6k $0 — 432.2 — 47.4% $124.22 View
Condong CONDONG1 NSW1 Turbine - Steam Sub Critical $30.5k $0 — 322.2 — 44.7% $112.12 View
Angaston ANGAST1 SA1 Reciprocating Engine - Compression ignition $5.5k $0 — 46.0 1,104.0 4.1% $0.00 View
Tully Sugar Mill TULLYSM1 QLD1 Turbine - Steam Super Critical $202 $0 — 2.2 — 0.3% $117.00 View
Eraring GT ERGT01 NSW1 Turbine - OCGT $0 $0 — — — 0.0% $96.96 View
Broken Hill GT GB01 NSW1 Turbine - OCGT $0 $0 — — — 0.0% $2.11 View
Hunter EconomicZone HEZ1 NSW1 Reciprocating Engine - Compression ignition $0 $0 — — 480.0 0.0% $308.00 View
Lonsdale LONSDALE SA1 Reciprocating Engine - Compression ignition $0 $0 — — 419.7 0.0% $308.00 View
Mt Stuart MSTUART1 QLD1 Turbine - OCGT $0 $0 — — 3,277.5 0.0% $2.00 View
Mt Stuart MSTUART2 QLD1 Turbine - OCGT $0 $0 — — — 0.0% $148.45 View
Mt Stuart MSTUART3 QLD1 Turbine - OCGT $0 $0 — — 2,700.5 0.0% $2.00 View
Port Lincoln GT POR01 SA1 Turbine - OCGT $0 $0 — — — 0.0% $2.00 View
Port Lincoln GT POR03 SA1 Turbine - OCGT $0 $0 — — — 0.0% $2.00 View
Port Stanvac 1 PTSTAN1 SA1 Reciprocating Engine - Compression ignition $0 $0 — — 1,344.0 0.0% $308.00 View
Snuggery SNUG1 SA1 Turbine - OCGT $0 $0 — — — 0.0% $2.00 View
Rocky Point Sugar Mill Cogeneration Plant RPCG QLD1 Other - Other $-2.6k $0 — -27.2 — -3.8% $117.00 View
Western Downs Gas Peaking Plant - KCI WDBESS2 QLD1 Turbine - CCGT $-9.2k $4.9k 2,171.6 -281.2 6,120.0 -2.9% $2.00 View