Other Generators · Origin Energy Eraring Pty Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
12 Jun 2026 19:30 → 13 Jun 2026 19:30 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9855 |
| 2025-07-01 | 0.9846 |
| Capex total (greenfield) |
$63.85M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,538,462
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$5.47M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$131,756
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$6.00
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ default |
$12.00
Shown in table |
| Heat rate GJ/MWh |
7.58
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 07 Jun 2026
Notes
No reliable plant-specific greenfield capex announcement was found for Eraring GT (ERGT01) after searching owner, project, and government sources. AEMO benchmark values were used only for operating assumptions. Eraring GT is listed as a 41.5 MW OCGT diesel unit at Eraring; the exact commission date was not located in the search results.