← Asset Watch · Generator profile

Summerfield BESS

SA · BESS · SMFBESS1, SMFBESS2
As of 5 Nov 21:55 NEM time (AEST) · SCADA current
Net SCADA
-3.8 MW
Declared availability (next-day)
0.0 MW
Regional price
$137.44/MWh

Aligned 5-minute series in NEM time (AEST). Coverage 100% of expected intervals (chart sampled 1 in 22).

Battery SCADA is shown as net MW (+ discharge / − charge). Interval energy uses MW × 5/60 h. State of charge is shown only when Next_Day_Dispatch INITIAL_ENERGY_STORAGE is present — it is not inferred.

Material events

No recent material events.

Peer comparison

Same technology (BESS) and region (SA). One row per site — DUIDs at the same site are combined and energy-weighted. Period 6 Oct 21:59 – 5 Nov 21:59 NEM time. Coverage 100%. Charge-weighted and discharge-weighted regional reference prices, and the spread between them. Weighted by SCADA energy in each 5-minute interval. Excludes contracts, FCAS, fees, degradation and other costs. Not profit and not a judgement of operator decisions.

Asset Charge MWhCharge-weightedDischarge MWhDischarge-weightedSpread
Summerfield BESS (this asset) 799.9 $-0.71/MWh 654.1 $0.71/MWh +$1.42/MWh
Adelaide Desalination Plant 64.3 $-36.18/MWh 56.7 $87.35/MWh +$123.53/MWh
Blyth BESS 2,415.2 $-25.67/MWh 1,805.1 $94.72/MWh +$120.39/MWh
Bolivar Waste Water Treatment 23.3 $-35.37/MWh 19.2 $97.48/MWh +$132.85/MWh
Christies Beach Wastewater Treatment Plant 21.9 $-36.24/MWh 16.7 $93.06/MWh +$129.31/MWh
Clements Gap - BESS 1,024.8 $-32.93/MWh 890.7 $86.71/MWh +$119.64/MWh
Dalrymple BESS 71.2 $5.12/MWh 34.6 $104.40/MWh +$99.28/MWh
Happy Valley Reservoir 28.5 $-33.55/MWh 21.8 $97.60/MWh +$131.15/MWh
Hornsdale Power Reserve Unit 1 881.4 $-10.95/MWh 629.5 $98.87/MWh +$109.81/MWh

Detection defaults for BESS

Availability drop 10.0 MW or 15%; output drop 15.0 MW or 25%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 10 minutes; cooldown 60 minutes.

AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.

Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.

Binding constraint identities from dispatch are not ingested, so constraint overlays are not shown. State of charge is only stored from Next_Day_Dispatch INITIAL_ENERGY_STORAGE. It is next-day, not live, and is omitted when the field is absent.