← Asset Watch · Generator profile

Stanhope BESS Project 01

VIC · BESS · SHBESS01
As of 6 Nov 21:50 NEM time (AEST) · stale
Net SCADA
—
Declared availability
—
Regional price
$78.88/MWh
Data unavailable for this window. 0 intervals loaded.

Material events

Data unavailable.

Peer comparison

Same technology (BESS) and region (VIC). One row per site — DUIDs at the same site are combined and energy-weighted. Period 7 Oct 21:52 – 6 Nov 21:52 NEM time. Coverage 0%. Charge-weighted and discharge-weighted regional reference prices, and the spread between them. Weighted by SCADA energy in each 5-minute interval. Excludes contracts, FCAS, fees, degradation and other costs. Not profit and not a judgement of operator decisions.

Asset Charge MWhCharge-weightedDischarge MWhDischarge-weightedSpread
Stanhope BESS Project 01 (this asset) 0.0 — 0.0 — —
Ballarat Energy Storage System 77.8 $-19.14/MWh 66.6 $77.01/MWh +$96.15/MWh
Bulgana Green Power Hub - BESS 186.2 $15.57/MWh 144.4 $80.37/MWh +$64.80/MWh
Gannawarra Energy Storage System 131.7 $2.98/MWh 98.8 $91.40/MWh +$88.42/MWh
Hazelwood Battery Energy Storage System (HBESS) 949.1 $-1.16/MWh 709.6 $81.79/MWh +$82.95/MWh
Koorangie Energy Storage System 1,759.9 $1.14/MWh 1,477.0 $86.85/MWh +$85.72/MWh
LaTrobe Valley BESS 974.1 $2.35/MWh 850.4 $96.25/MWh +$93.90/MWh
Mornington BESS 2,532.2 $0.29/MWh 2,163.0 $95.36/MWh +$95.08/MWh
Philip Island BESS 79.3 $19.97/MWh 64.5 $73.11/MWh +$53.13/MWh

Detection defaults for BESS

Availability drop 10.0 MW or 15%; output drop 15.0 MW or 25%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 10 minutes; cooldown 60 minutes.

AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.

Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.

Binding constraint identities from dispatch are not ingested, so constraint overlays are not shown. State of charge is only stored from Next_Day_Dispatch INITIAL_ENERGY_STORAGE. It is next-day, not live, and is omitted when the field is absent.