← Asset Watch · Generator profile

Stanhope BESS Project 01

VIC · BESS · SHBESS01
As of 6 Nov 18:55 NEM time (AEST) · stale
Net SCADA
—
Declared availability
—
Regional price
$82.68/MWh
Data unavailable for this window. 0 intervals loaded.

Material events

Data unavailable.

Peer comparison

Same technology (BESS) and region (VIC). One row per site — DUIDs at the same site are combined and energy-weighted. Period 5 Nov 18:59 – 6 Nov 18:59 NEM time. Coverage 0%. Charge-weighted and discharge-weighted regional reference prices, and the spread between them. Weighted by SCADA energy in each 5-minute interval. Excludes contracts, FCAS, fees, degradation and other costs. Not profit and not a judgement of operator decisions.

Asset Charge MWhCharge-weightedDischarge MWhDischarge-weightedSpread
Stanhope BESS Project 01 (this asset) 0.0 — 0.0 — —
Ballarat Energy Storage System 17.6 $-0.25/MWh 0.8 $86.72/MWh +$86.97/MWh
Bulgana Green Power Hub - BESS 31.7 $-0.22/MWh 29.7 $113.45/MWh +$113.66/MWh
Gannawarra Energy Storage System 30.8 $0.58/MWh 21.7 $101.38/MWh +$100.80/MWh
Hazelwood Battery Energy Storage System (HBESS) 160.6 $-1.93/MWh 144.6 $108.76/MWh +$110.69/MWh
Koorangie Energy Storage System 361.4 $-6.82/MWh 329.7 $113.88/MWh +$120.70/MWh
LaTrobe Valley BESS 203.1 $-5.05/MWh 226.9 $113.35/MWh +$118.40/MWh
Mornington BESS 525.4 $-4.47/MWh 582.1 $113.86/MWh +$118.33/MWh
Philip Island BESS 12.1 $-0.15/MWh 14.5 $82.24/MWh +$82.39/MWh

Detection defaults for BESS

Availability drop 10.0 MW or 15%; output drop 15.0 MW or 25%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 10 minutes; cooldown 60 minutes.

AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.

Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.

Binding constraint identities from dispatch are not ingested, so constraint overlays are not shown. State of charge is only stored from Next_Day_Dispatch INITIAL_ENERGY_STORAGE. It is next-day, not live, and is omitted when the field is absent.