← Asset Watch · Generator profile

Moranbah Generation Project

QLD · Coal · MORANBAH
As of 5 Nov 01:10 NEM time (AEST) · stale
Latest output
—
Declared availability
—
Regional price
$99.43/MWh
Data unavailable for this window. 0 intervals loaded.

Material events

Data unavailable.

Peer comparison

Same technology (Coal) and region (QLD). One row per site — DUIDs at the same site are combined and energy-weighted. Period 4 Nov 01:13 – 5 Nov 01:13 NEM time. Coverage 0%. Interval energy (max(0, SCADA MW) × 5/60 h) times the regional reference price, divided by that energy. A spot-market metric, not realised revenue.

Asset Energy MWhGeneration-weighted spot
Moranbah Generation Project (this asset) 0.0 —
Braemar (3 units) 637.5 $-2.67/MWh
Braemar 2 Power Station (3 units) 3.4 $59.03/MWh
Callide B (2 units) 9,165.2 $61.06/MWh
Callide C (2 units) 14,373.6 $75.90/MWh
Condamine A (2 units) 0.0 —
Darling Downs 1,022.8 $105.37/MWh
German Creek 230.8 $61.43/MWh
Gladstone (6 units) 18,923.8 $74.11/MWh

Detection defaults for Coal

Availability drop 50.0 MW or 10%; output drop 80.0 MW or 15%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 15 minutes; cooldown 120 minutes.

AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.

Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.