← Asset Watch · Generator profile

LYA BESS

VIC · BESS ·
Data unavailable
Net SCADA
—
Declared availability
—
Regional price
—
Data unavailable for this window. 0 intervals loaded.

Material events

Data unavailable.

Peer comparison

Same technology (BESS) and region (VIC). One row per site — DUIDs at the same site are combined and energy-weighted. Period 6 Oct 00:19 – 5 Nov 00:19 NEM time. Coverage 0%. Charge-weighted and discharge-weighted regional reference prices, and the spread between them. Weighted by SCADA energy in each 5-minute interval. Excludes contracts, FCAS, fees, degradation and other costs. Not profit and not a judgement of operator decisions.

Asset Charge MWhCharge-weightedDischarge MWhDischarge-weightedSpread
LYA BESS (this asset) 0.0 — 0.0 — —
Ballarat Energy Storage System 85.1 $-17.63/MWh 64.7 $87.58/MWh +$105.22/MWh
Bulgana Green Power Hub - BESS 186.2 $18.49/MWh 155.8 $81.35/MWh +$62.85/MWh
Gannawarra Energy Storage System 121.4 $4.81/MWh 87.3 $86.41/MWh +$81.60/MWh
Hazelwood Battery Energy Storage System (HBESS) 795.9 $-3.82/MWh 713.0 $85.42/MWh +$89.24/MWh
Koorangie Energy Storage System 1,737.0 $3.31/MWh 1,428.3 $88.65/MWh +$85.34/MWh
LaTrobe Valley BESS 1,034.5 $3.94/MWh 792.5 $100.81/MWh +$96.87/MWh
Mornington BESS 2,372.8 $-0.63/MWh 1,849.7 $88.34/MWh +$88.96/MWh
Philip Island BESS 79.6 $18.11/MWh 69.9 $68.85/MWh +$50.74/MWh

Detection defaults for BESS

Availability drop 10.0 MW or 15%; output drop 15.0 MW or 25%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 10 minutes; cooldown 60 minutes.

AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.

Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.

Binding constraint identities from dispatch are not ingested, so constraint overlays are not shown. State of charge is only stored from Next_Day_Dispatch INITIAL_ENERGY_STORAGE. It is next-day, not live, and is omitted when the field is absent.