← Asset Watch · Generator profile

Kennedy Energy Park - Phase 1 - Solar

QLD · Solar · KEPSF1
As of 5 Nov 07:35 NEM time (AEST) · SCADA current
Latest output
0.0 MW
Declared availability (next-day)
0.0 MW
Regional price
$-5.00/MWh

Aligned 5-minute series in NEM time (AEST). Coverage 100% of expected intervals.

Material events

No recent material events.

Peer comparison

Same technology (Solar) and region (QLD). One row per site — DUIDs at the same site are combined and energy-weighted. Period 4 Nov 07:39 – 5 Nov 07:39 NEM time. Coverage 100%. Interval energy (max(0, SCADA MW) × 5/60 h) times the regional reference price, divided by that energy. A spot-market metric, not realised revenue.

Asset Energy MWhGeneration-weighted spot
Kennedy Energy Park - Phase 1 - Solar (this asset) 0.0 —
Aldoga Solar Farm 3,154.5 $5.17/MWh
Barcaldine Remote Community Solar Farm 88.4 $22.33/MWh
Bluegrass Solar Farm 934.1 $5.09/MWh
Broadsound Solar Farm 2,155.1 $22.94/MWh
Bundaberg Solar Farm 500.3 $5.65/MWh
Childers Solar Farm 316.3 $1.08/MWh
Clare Solar Farm 593.9 $13.29/MWh
Clermont Solar Farm 629.4 $8.56/MWh

Detection defaults for Solar

Availability drop 20.0 MW or 20%; output drop 30.0 MW or 25%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 10 minutes; cooldown 60 minutes. Solar overnight output falls (17:00–07:00 AEST) are ignored.

AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.

Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.

Binding constraint identities from dispatch are not ingested, so constraint overlays are not shown. State of charge is only stored from Next_Day_Dispatch INITIAL_ENERGY_STORAGE. It is next-day, not live, and is omitted when the field is absent.