← Asset Watch · Generator profile

Corop BESS

VIC · BESS ·
Data unavailable
Net SCADA
—
Declared availability
—
Regional price
—
Data unavailable for this window. 0 intervals loaded.

Material events

Data unavailable.

Peer comparison

Same technology (BESS) and region (VIC). One row per site — DUIDs at the same site are combined and energy-weighted. Period 29 Oct 01:01 – 5 Nov 01:01 NEM time. Coverage 0%. Charge-weighted and discharge-weighted regional reference prices, and the spread between them. Weighted by SCADA energy in each 5-minute interval. Excludes contracts, FCAS, fees, degradation and other costs. Not profit and not a judgement of operator decisions.

Asset Charge MWhCharge-weightedDischarge MWhDischarge-weightedSpread
Corop BESS (this asset) 0.0 — 0.0 — —
Ballarat Energy Storage System 50.9 $-6.21/MWh 37.3 $89.69/MWh +$95.90/MWh
Bulgana Green Power Hub - BESS 106.7 $28.74/MWh 85.7 $88.58/MWh +$59.85/MWh
Gannawarra Energy Storage System 66.0 $16.63/MWh 43.0 $100.72/MWh +$84.09/MWh
Hazelwood Battery Energy Storage System (HBESS) 440.0 $7.28/MWh 275.9 $100.20/MWh +$92.92/MWh
Koorangie Energy Storage System 947.9 $43.08/MWh 788.4 $97.99/MWh +$54.91/MWh
LaTrobe Valley BESS 634.2 $3.15/MWh 427.9 $109.14/MWh +$106.00/MWh
Mornington BESS 1,487.8 $4.59/MWh 1,020.6 $107.96/MWh +$103.37/MWh
Philip Island BESS 49.2 $35.53/MWh 35.4 $92.17/MWh +$56.64/MWh

Detection defaults for BESS

Availability drop 10.0 MW or 15%; output drop 15.0 MW or 25%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 10 minutes; cooldown 60 minutes.

AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.

Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.

Binding constraint identities from dispatch are not ingested, so constraint overlays are not shown. State of charge is only stored from Next_Day_Dispatch INITIAL_ENERGY_STORAGE. It is next-day, not live, and is omitted when the field is absent.