← Asset Watch · Generator profile

Calvale LDES BESS

QLD · BESS ·
Data unavailable
Net SCADA
—
Declared availability
—
Regional price
—
Data unavailable for this window. 0 intervals loaded.

Material events

Data unavailable.

Peer comparison

Same technology (BESS) and region (QLD). One row per site — DUIDs at the same site are combined and energy-weighted. Period 4 Nov 05:28 – 5 Nov 05:28 NEM time. Coverage 0%. Charge-weighted and discharge-weighted regional reference prices, and the spread between them. Weighted by SCADA energy in each 5-minute interval. Excludes contracts, FCAS, fees, degradation and other costs. Not profit and not a judgement of operator decisions.

Asset Charge MWhCharge-weightedDischarge MWhDischarge-weightedSpread
Calvale LDES BESS (this asset) 0.0 — 0.0 — —
Bouldercombe Battery project 74.5 $2.37/MWh 60.9 $100.65/MWh +$98.28/MWh
Brendale BESS 464.9 $-0.99/MWh 393.5 $102.64/MWh +$103.63/MWh
Chinchilla BESS 161.7 $-0.51/MWh 141.3 $99.67/MWh +$100.18/MWh
Greenbank BESS 431.3 $-0.93/MWh 365.3 $101.92/MWh +$102.84/MWh
Kennedy Energy Park - Phase 1 - Storage 0.0 — 2.0 $104.48/MWh —
Supernode BESS (5 units) 1,453.5 $-4.88/MWh 1,160.8 $103.19/MWh +$108.07/MWh
Swanbank BESS 596.4 $1.18/MWh 499.2 $102.55/MWh +$101.37/MWh
Tarong BESS - Stanwell 654.1 $-3.41/MWh 548.0 $100.14/MWh +$103.55/MWh

Detection defaults for BESS

Availability drop 10.0 MW or 15%; output drop 15.0 MW or 25%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 10 minutes; cooldown 60 minutes.

AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.

Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.

Binding constraint identities from dispatch are not ingested, so constraint overlays are not shown. State of charge is only stored from Next_Day_Dispatch INITIAL_ENERGY_STORAGE. It is next-day, not live, and is omitted when the field is absent.