← Asset Watch · Generator profile
Aligned 5-minute series in NEM time (AEST). Coverage 95% of expected intervals.
Battery SCADA is shown as net MW (+ discharge / − charge). Interval energy uses MW × 5/60 h. State of charge is shown only when Next_Day_Dispatch INITIAL_ENERGY_STORAGE is present — it is not inferred.
No recent material events.
Same technology (BESS) and region (QLD). One row per site — DUIDs at the same site are combined and energy-weighted. Period 3 Nov 20:16 – 4 Nov 20:16 NEM time. Coverage 95%. Charge-weighted and discharge-weighted regional reference prices, and the spread between them. Weighted by SCADA energy in each 5-minute interval. Excludes contracts, FCAS, fees, degradation and other costs. Not profit and not a judgement of operator decisions.
| Asset | Charge MWh | Charge-weighted | Discharge MWh | Discharge-weighted | Spread |
|---|---|---|---|---|---|
| Supernode BESS (this asset) | 985.6 | $-5.56/MWh | 1,133.0 | $98.53/MWh | +$104.09/MWh |
| Bouldercombe Battery project | 72.4 | $-0.60/MWh | 60.1 | $99.29/MWh | +$99.89/MWh |
| Brendale BESS | 456.6 | $-2.84/MWh | 535.0 | $100.51/MWh | +$103.35/MWh |
| Chinchilla BESS | 156.4 | $-3.95/MWh | 235.9 | $97.74/MWh | +$101.70/MWh |
| Greenbank BESS | 422.1 | $-3.13/MWh | 455.7 | $97.35/MWh | +$100.48/MWh |
| Kennedy Energy Park - Phase 1 - Storage | 0.0 | — | 2.0 | $104.48/MWh | — |
| Swanbank BESS | 592.0 | $0.42/MWh | 682.5 | $98.91/MWh | +$98.49/MWh |
| Tarong BESS - Stanwell | 650.6 | $-4.00/MWh | 478.8 | $94.81/MWh | +$98.81/MWh |
Availability drop 10.0 MW or 15%; output drop 15.0 MW or 25%; high price from $300.00/MWh while output is below 25% of last-known availability; minimum 10 minutes; cooldown 60 minutes.
AEMO settlement timestamps are period-ending Australian Eastern Standard Time year-round. They do not observe daylight saving. A 14:05 stamp covers 14:00:01–14:05:00 AEST.
Energy and FCAS bid/rebid files (BIDDAYOFFER / BIDPEROFFER) are not ingested. AEMO publishes “Yesterday’s Bids” the next day; this release does not show bid bands, rebids or published reasons.
Binding constraint identities from dispatch are not ingested, so constraint overlays are not shown. State of charge is only stored from Next_Day_Dispatch INITIAL_ENERGY_STORAGE. It is next-day, not live, and is omitted when the field is absent.