White Rock Solar Farm (WRSF1)

Solar · White Rock Wind Farm Pty Ltd · Solar PV - Fixed

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 24 hours
20 MW
Registered nameplate capacity
24 hours revenue
$3.2k
Capacity factor
20.7%
Revenue / MWh
$32.52
Est. SRMC
$0.20/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
20 MW

AEMO status In Service
Project status Operational (AI)

GlobalData 2023 / GEM.wiki indicates White Rock Solar Farm came online in 2018 and is operating.

Region NSW1
Coordinates -29.70000, 151.60000 (AI)

White Rock Solar Farm project page and related NSW planning docs place it adjacent to White Rock Wind Farm, about 20 km west of Glen Innes, NSW.

MLF 0.8265
DUID WRSF1
Owner White Rock Wind Farm Pty Ltd
Commissioned
Expected closure 2043
Closure date
Technology Solar PV - Fixed
Fuel Solar - Solar
Module OEM SMA
Module / inverter supplier SC2500 inverter/transformer module
Inverter OEM
Inverter model
Equipment confidence high
Stats window
22 Jul 2026 18:20 → 23 Jul 2026 18:20 AEST

Dispatch & revenue

22 Jul 2026 18:20 → 23 Jul 2026 18:20 AEST

Energy revenue (× MLF)
$3.2k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
99.5 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.8265
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8453
2025-07-01 0.8149
2026-07-01 0.8265

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (fixed)
Capacity
20 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.20/MWh
Capex total (greenfield) default
$22.00M

Shown in table
$22.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,100,000

Shown in table
$1.10M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$18,000

Shown in table
$18.0k (2026 real AUD)

Variable OPEX / MWh default
$0.20

Shown in table
$0.20 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown