Wemen Solar Farm (WEMENSF1)

Solar · Wemen Asset Co Pty Ltd as Trustee to Wemen Solar Unit Trust · Solar PV - Single axis tracking

Operational AEMO: In Service VIC1 Solar - Solar NEM data · 7 days
98 MW
Registered nameplate capacity
7 days revenue
$59.4k
Capacity factor
12.8%
Revenue / MWh
$28.37
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
98 MW

AEMO status In Service
Project status Operational (AI)

AEMO registration shows Wemen Solar Farm in service with commissioned date 2019-03-01; project is operating commercially.

Region VIC1
Coordinates -34.91600, 142.84500 (AI)

Project location near Wemen, Victoria as identified in project and mapping references for Wemen Solar Farm.

MLF 0.8986
DUID WEMENSF1
Owner Wemen Asset Co Pty Ltd as Trustee to Wemen Solar Unit Trust
Commissioned Mar 2019
Expected closure 2049
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM JA Solar
Module / inverter supplier module / inverter supplier
Inverter OEM Sungrow
Inverter model SG3150HV-MV
Equipment confidence low
Stats window
07 Jun 2026 06:00 → 14 Jun 2026 06:00 AEST

Dispatch & revenue

07 Jun 2026 06:00 → 14 Jun 2026 06:00 AEST

Energy revenue (× MLF)
$59.4k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
2,092.0 MWh
Available
2,179.2 MWh
Curtailed
87.2 MWh
Curtailment
4.0%
of available
MLF used
0.8986
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8584
2025-07-01 0.8986

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
98 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$126.75M

Shown in table
$126.75M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown