Warwick Solar Farm (WARWSF1)

Solar · The University of Queensland · Solar PV - Single axis tracking

Operational AEMO: In Service QLD1 Solar - Solar NEM data · 24 hours
32 MW
Registered nameplate capacity
24 hours revenue
$4.7k
Capacity factor
14.7%
Revenue / MWh
$41.72
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
32 MW

AEMO status In Service
Project status Operational (AI)

The University of Queensland project page and project news indicate Warwick Solar Farm was commissioned and in service in 2023.

Region QLD1
Coordinates -28.22300, 152.02100 (AI)

Project pages for Warwick Solar Farm place the site near Warwick, Queensland; approximate site coordinates inferred from the project location in Southern Downs.

MLF 0.9888
DUID WARWSF1
Owner The University of Queensland
Commissioned Apr 2023
Expected closure 2046
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Longi
Module / inverter supplier module/inverter supplier
Inverter OEM Sungrow
Inverter model SG250HX
Equipment confidence low
Stats window
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Dispatch & revenue

12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Energy revenue (× MLF)
$4.7k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
113.0 MWh
Available
113.0 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9888
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9847
2025-07-01 0.9888

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
32 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$41.73M

Shown in table
$41.73M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown