Wandoan South Solar Stage 2 (WANDSF2)

Solar · TBSOL · Solar PV - Single axis tracking

Construction AEMO: Publicly Announced QLD1 Solar - Solar NEM data · 24 hours
320 MW
Researched capacity
24 hours revenue
$1.2k
Capacity factor
0.3%
Revenue / MWh
$60.21
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity (AI)
320 MW

Vena Group news release (2025): Wandoan South Solar 2 expanded to a 320 MW solar facility.

AEMO status Publicly Announced
Project status Construction (AI)

Vena Energy project page (2026): Wandoan South Solar 2 is 'under construction' with COD expected mid-2027.

Region QLD1
Coordinates -26.55300, 148.51800 (AI)

Vena Energy project page: solar farm located approximately 21 km southwest of Wandoan, Queensland, via Gadsbys Road, Woleebee.

MLF 0.9850
DUID WANDSF2
Owner TBSOL
Commissioned
Expected closure
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Vena Energy
Module / inverter supplier Solar PV project developer / EPC (not separately documented for module supplier)
Inverter OEM
Inverter model
Equipment confidence low
Stats window
21 Jul 2026 19:45 → 22 Jul 2026 19:45 AEST

Dispatch & revenue

21 Jul 2026 19:45 → 22 Jul 2026 19:45 AEST

Energy revenue (× MLF)
$1.2k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
20.5 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9850
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2026-06-02 0.9975
2026-07-01 0.9850

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
320 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$416.00M

Shown in table
$416.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown