Suntop Solar Farm (SUNTPSF1)

Solar · Suntop SF Pty Ltd As Trustee For The Suntop Asset · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 24 hours
150 MW
Registered nameplate capacity
24 hours revenue
$35.1k
Capacity factor
18.5%
Revenue / MWh
$52.66
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
150 MW

AEMO status In Service
Project status Operational (AI)

AEMO registration shows In Service; project commissioned 2021-12-01 per user-provided asset data.

Region NSW1
Coordinates -34.52400, 148.25300 (AI)

Approximate site location near Ganbenang/Suntop area, NSW; no primary site map result returned.

MLF 0.9073
DUID SUNTPSF1
Owner Suntop SF Pty Ltd As Trustee For The Suntop Asset
Commissioned Dec 2021
Expected closure 2056
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Jinko Solar
Module / inverter supplier module/inverter supplier
Inverter OEM SMA Solar Technology
Inverter model inverter model not documented
Equipment confidence low
Stats window
12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Dispatch & revenue

12 Jun 2026 00:00 → 12 Jun 2026 23:59 AEST

Energy revenue (× MLF)
$35.1k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
666.2 MWh
Available
697.5 MWh
Curtailed
31.3 MWh
Curtailment
4.5%
of available
MLF used
0.9073
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9096
2025-07-01 0.9073

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
150 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$195.00M

Shown in table
$195.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown