Smithfield Energy Facility (SITHE01)

Gas Peakers · Smithfield Power Generation Pty Ltd · Turbine - OCGT

Operational AEMO: In Service NSW1 Fossil - Natural Gas Pipeline NEM data · 30 days
126 MW
Registered nameplate capacity
30 days revenue
$646.5k
Capacity factor
3.8%
Revenue / MWh
$189.25
Est. SRMC
$128.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
126 MW

AEMO status In Service
Project status Operational (AI)

Iberdrola Australia asset page (2026) describes Smithfield OCGT as an existing core firming asset with 15-minute start time and acquired in 2019.

Region NSW1
Coordinates -33.85800, 150.93200 (AI)

NSW planning portal assessment report: the Smithfield Energy Facility is located at 33 Herbert Place, Smithfield.

MLF 1.0017
DUID SITHE01
Owner Smithfield Power Generation Pty Ltd
Commissioned
Expected closure 2044
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM GE Vernova
Turbine / engine model LM6000
Equipment confidence medium
Stats window
14 May 2026 14:05 → 13 Jun 2026 14:05 AEST

Dispatch & revenue

14 May 2026 14:05 → 13 Jun 2026 14:05 AEST

Energy revenue (× MLF)
$646.5k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
3,416.2 MWh
Available
3,416.7 MWh
Curtailed
0.5 MWh
Curtailment
0.0%
of available
MLF used
1.0017
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 1.0015
2025-07-01 1.0017

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
126 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$128.50/MWh
Capex total (greenfield) default
$150.84M

Shown in table
$150.84M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,200,000

Shown in table
$1.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$45,000

Shown in table
$45.0k (2026 real AUD)

Variable OPEX / MWh default
$2.50

Shown in table
$2.50 (2026 real AUD)

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh default
10.50

Shown in table
$10.50 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown