Gas Peakers · Smithfield Power Generation Pty Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
12 Jun 2026 19:05 → 13 Jun 2026 19:05 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 1.0015 |
| 2025-07-01 | 1.0017 |
| Capex total (greenfield) default |
$150.84M
Shown in table |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW default |
$1,200,000
Shown in table |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$45,000
Shown in table |
| Variable OPEX / MWh default |
$2.50
Shown in table |
| Fuel cost / GJ default |
$12.00
Shown in table |
| Heat rate GJ/MWh default |
10.50
Shown in table |
Confidence: unknown · Status: needs review · Capex basis: unknown