Roma (ROMA_7)

Gas Peakers · Origin Energy Power Limited · Turbine - OCGT

Operational AEMO: In Service QLD1 Fossil - Natural Gas Pipeline NEM data · 24 hours
40 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$128.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
40 MW

AEMO status In Service
Project status Operational (AI)

Origin Energy generation page (originenergy.com.au) describes Roma Power Station as built and commissioned by Origin and currently a peaking power station.

Region QLD1
Coordinates -26.57730, 148.84010 (AI)

Global Energy Observatory page for Roma OCGT Power Plant gives coordinates -26.5773, 148.8401.

MLF 0.9687
DUID ROMA_7
Owner Origin Energy Power Limited
Commissioned
Expected closure 2034
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM GE Vernova
Turbine / engine model LM6000
Equipment confidence medium
Stats window
12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST

Dispatch & revenue

12 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
159.5 MWh
Curtailed
159.5 MWh
Curtailment
100.0%
of available
MLF used
0.9687
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9643
2025-07-01 0.9687

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
40 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$128.50/MWh
Capex total (greenfield) default
$48.00M

Shown in table
$48.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,200,000

Shown in table
$1.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$45,000

Shown in table
$45.0k (2026 real AUD)

Variable OPEX / MWh default
$2.50

Shown in table
$2.50 (2026 real AUD)

Fuel cost / GJ default
$12.00

Shown in table
$12.00 (2026 real AUD)

Heat rate GJ/MWh default
10.50

Shown in table
$10.50 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown