Portland Wind Farm (PORTWF)

Wind · Pacific Hydro Portland Wind Farm Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service VIC1 Wind - Wind NEM data · 30 days
152 MW
Registered nameplate capacity
30 days revenue
$307.4k
Capacity factor
7.8%
Revenue / MWh
$36.10
Est. SRMC
$0.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
152 MW

AEMO status In Service
Project status Operational (AI)

The Wind Power listing shows Portland Wind Farm as operational; Pacific Blue operating sites page lists Portland among operating assets (thewindpower.net; pacificblue.com.au).

Region VIC1
Coordinates -38.41422, 141.54269 (AI)

The Wind Power lists Portland Wind Farm at Latitude -38° 24' 51.2" Longitude 141° 32' 33.7" (thewindpower.net).

MLF 1.0000
DUID PORTWF
Owner Pacific Hydro Portland Wind Farm Pty Ltd
Commissioned
Expected closure 2040
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM REpower
Turbine model MM92
Equipment confidence high
Stats window
14 May 2026 22:00 → 13 Jun 2026 22:00 AEST

Dispatch & revenue

14 May 2026 22:00 → 13 Jun 2026 22:00 AEST

Energy revenue (× MLF)
$307.4k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
8,513.5 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
1.0000
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
152 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield) default
$333.74M

Shown in table
$333.74M (2026 real AUD)

Capex refurbishment
Capex / MW default
$2,200,000

Shown in table
$2.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown