Port Lincoln GT (POR01)

Other Generators · Synergen Power Pty Ltd · Turbine - OCGT

Closed AEMO: In Service - Announced Withdrawal (Permanent) SA1 Fossil - Diesel NEM data · 24 hours
50 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$2.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
50 MW

AEMO status In Service - Announced Withdrawal (Permanent)
Project status Closed (AI)

ENGIE Synergen Power page (engie.com.au) states Port Lincoln has six diesel-fuelled turbines in service.

Region SA1
Coordinates -34.70000, 135.80500 (AI)

Global Energy Observatory entry for Port Lincoln Diesel Power Plant gives coordinates -34.7, 135.805.

MLF 0.9895
DUID POR01
Owner Synergen Power Pty Ltd
Commissioned
Expected closure 2028
Closure date 1 Jan 2028
Technology Turbine - OCGT
Fuel Fossil - Diesel
Equipment OEM PR Power
Equipment type / model 1250kVA containerised diesel generator
Equipment confidence low
Stats window
12 Jun 2026 22:30 → 13 Jun 2026 22:30 AEST

Dispatch & revenue

12 Jun 2026 22:30 → 13 Jun 2026 22:30 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9895
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9679
2025-07-01 0.9895

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Other
Capacity
50 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$2.00/MWh
Capex total (greenfield) default
$100.00M

Shown in table
$100.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$2,000,000

Shown in table
$2.00M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$40,000

Shown in table
$40.0k (2026 real AUD)

Variable OPEX / MWh default
$2.00

Shown in table
$2.00 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown