Murra Warra Wind Farm - stage 2 (MUWAWF2)

Wind · Murra Warra II Project Co Pty Ltd as Trustee for the Murra Warra II Project Trust · Wind Turbine - Onshore

Operational AEMO: In Service VIC1 Wind - Wind NEM data · 20h
209 MW
Registered nameplate capacity
20h revenue
$4.7k
Capacity factor
4.9%
Revenue / MWh
$22.84
Est. SRMC
$0.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
209 MW

AEMO status In Service
Project status Operational (AI)

Wikipedia / Zenviron project page (2022): stage 2 completed and commissioned in Q2 2022; commissioned 2022-10-01 in prompt.

Region VIC1
Coordinates -36.43100, 142.32100 (AI)

Wikipedia coordinates for Murra Warra Wind Farm: 36°25′52″S 142°19′16″E (-36.431, 142.321).

MLF 0.8817
DUID MUWAWF2
Owner Murra Warra II Project Co Pty Ltd as Trustee for the Murra Warra II Project Trust
Commissioned Oct 2022
Expected closure 2052
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM GE Vernova
Turbine model Cypress 5.5-158
Equipment confidence high
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 19:35 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 19:35 AEST

Energy revenue (× MLF)
$4.7k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
204.6 MWh
Available
702.2 MWh
Curtailed
702.2 MWh
Curtailment
100.0%
of available
MLF used
0.8817
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8619
2025-07-01 0.8817

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
209 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield) default
$459.80M

Shown in table
$459.80M (2026 real AUD)

Capex refurbishment
Capex / MW default
$2,200,000

Shown in table
$2.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown