Mortlake South Wind Farm (MRTLSWF1)

Wind · Mortlake South Wind Farm Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service VIC1 Wind - Wind NEM data · 24 hours
158 MW
Registered nameplate capacity
24 hours revenue
$-4.1k
Capacity factor
39.8%
Revenue / MWh
$-2.70
Est. SRMC
$0.50/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
158 MW

AEMO status In Service
Project status Operational (AI)

ACCIONA project page (2024): wind farm fully operational since July 2024.

Region VIC1
Coordinates -38.21600, 142.43800 (AI)

ACCIONA project page: located 5 km from Mortlake in Moyne Shire; site-level coordinates not published, inferred from project area near Mortlake South wind farm.

MLF 0.9525
DUID MRTLSWF1
Owner Mortlake South Wind Farm Pty Ltd
Commissioned May 2023
Expected closure 2047
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V150-4.5
Equipment confidence high
Stats window
12 Jun 2026 20:15 → 13 Jun 2026 20:15 AEST

Dispatch & revenue

12 Jun 2026 20:15 → 13 Jun 2026 20:15 AEST

Energy revenue (× MLF)
$-4.1k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
1,505.3 MWh
Available
1,173.4 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9525
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9430
2025-07-01 0.9525

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
158 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield) default
$346.50M

Shown in table
$346.50M (2026 real AUD)

Capex refurbishment
Capex / MW default
$2,200,000

Shown in table
$2.20M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh default
$0.50

Shown in table
$0.50 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown