Morgan To Whyalla Pipeline No 1 PS And Water Filtration Plant (MWPS1PV1)

Solar · South Australian Water Corporation · Solar PV - Single axis tracking

Operational AEMO: In Service SA1 Solar - Solar NEM data · 18h
6 MW
Registered nameplate capacity
18h revenue
$18
Capacity factor
0.5%
Revenue / MWh
$33.55
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
6 MW

AEMO status In Service
Project status Operational (AI)

Global Energy Monitor 2026; AEMO 2023 generation information lists MWPS1PV1 as operating/commissioned 2022.

Region SA1
Coordinates -34.01970, 139.67980 (AI)

Global Energy Monitor 2026 citing APVI power stations map; coordinates for MWPS1PV1 are -34.0197, 139.6798.

MLF 1.0146
DUID MWPS1PV1
Owner South Australian Water Corporation
Commissioned Aug 2022
Expected closure 2031
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Canadian Solar
Module / inverter supplier module/inverter supplier
Inverter OEM Sungrow
Inverter model SG250HX
Equipment confidence low
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 17:50 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 17:50 AEST

Energy revenue (× MLF)
$18
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
0.5 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
1.0146
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9759
2025-07-01 1.0146

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
6 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$7.15M

Shown in table
$7.15M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown