Moree Solar Farm (MOREESF1)

Solar · Moree Solar Farm Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service NSW1 Solar - Solar NEM data · 23h
56 MW
Registered nameplate capacity
23h revenue
$1.7k
Capacity factor
4.6%
Revenue / MWh
$29.11
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.

Key information
Capacity
56 MW

AEMO status In Service
Project status Operational (AI)

FRV project page states construction was completed in 2016 and the plant has been operating since then; RenewEconomy 2016 reported it started feeding the grid.

Region NSW1
Coordinates -29.16500, 149.82100 (AI)

NSW Planning Portal describes the site as 3 km south of Moree, east of the Newell Highway and south of the Gwydir Highway; FRV says about 10 km south of Moree.

MLF 0.8387
DUID MOREESF1
Owner Moree Solar Farm Pty Ltd
Commissioned
Expected closure 2046
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM JA Solar
Module / inverter supplier Module / inverter supplier
Inverter OEM Ingeteam
Inverter model INGECON SUN PowerMax 1000TL M400
Equipment confidence high
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 22:55 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 22:55 AEST

Energy revenue (× MLF)
$1.7k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
59.4 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.8387
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8086
2025-07-01 0.8387

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
56 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$72.80M

Shown in table
$72.80M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown