Maryrorough Solar Farm (MARYRSF1)

Solar · Maryrorough Solar Pty Ltd · Solar PV - Single axis tracking

Operational AEMO: In Service QLD1 Solar - Solar NEM data · 17h
35 MW
Registered nameplate capacity
17h revenue
$544
Capacity factor
5.4%
Revenue / MWh
$17.26
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
35 MW

AEMO status In Service
Project status Operational (AI)

Global Energy Monitor wiki; TradeConnex project page indicates the solar farm was completed and is operating

Region QLD1
Coordinates -27.53500, 151.72800 (AI)

TradeConnex project page: located about 50 km west of Toowoomba, SE Queensland; SolarFC project page notes Pittsworth QLD

MLF 0.9888
DUID MARYRSF1
Owner Maryrorough Solar Pty Ltd
Commissioned Mar 2021
Expected closure 2048
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Longi
Module / inverter supplier Ideematec / module & inverter supplier not documented
Inverter OEM
Inverter model
Equipment confidence medium
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 17:20 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 17:20 AEST

Energy revenue (× MLF)
$544
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
31.5 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9888
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9847
2025-07-01 0.9888

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
35 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield) default
$44.85M

Shown in table
$44.85M (2026 real AUD)

Capex refurbishment
Capex / MW default
$1,300,000

Shown in table
$1.30M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown