Mannum Adelaide Pumping Station No 3 - MAPL3 (Tungkillo) (MAPS3PV1)

Solar · South Australian Water Corporation · Solar PV - Single axis tracking

Operational AEMO: In Service SA1 Solar - Solar NEM data · 7 days
17 MW
Registered nameplate capacity
7 days revenue
$8.7k
Capacity factor
7.2%
Revenue / MWh
$43.53
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
17 MW

AEMO status In Service
Project status Operational (AI)

Global Energy Monitor 2025; project listed as operating/active with commissioning year 2023.

Region SA1
Coordinates -34.85390, 139.18980 (AI)

Global Energy Monitor 2025 citing APVI power-stations map; exact coordinates -34.8539, 139.1898.

MLF 1.0252
DUID MAPS3PV1
Owner South Australian Water Corporation
Commissioned Jan 2023
Expected closure 2041
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM JA Solar
Module / inverter supplier JA Solar / SMA Solar Technology
Inverter OEM SMA Solar Technology
Inverter model 6 inverter units (model not documented)
Equipment confidence high
Stats window
06 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST

Dispatch & revenue

06 Jun 2026 23:45 → 13 Jun 2026 23:45 AEST

Energy revenue (× MLF)
$8.7k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
200.4 MWh
Available
198.5 MWh
Curtailed
0.1 MWh
Curtailment
0.0%
of available
MLF used
1.0252
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9802
2025-07-01 1.0252

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
17 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$5.21M

Shown in table
$5.21M (2026 real AUD)

Reported / source value
$4.00M (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
This is the only site-specific cost statement found, but it is a threshold statement rather than a precise project cost; used only as a lower-bound proxy.

Reference
Development Application – Section 49 (Crown Development) for Solar PV installation in connection to Mannum to Adelaide Pipeline Pumping Station No.3 (medium confidence)
Source recorded 04 Jun 2026

Capex refurbishment
Capex / MW derived
$315,657

Shown in table
$315.7k (2026 real AUD)

Reported / source value
$242.4k (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated from the lower-bound reported cost proxy and the user-supplied registered capacity; the result is indicative only and likely understates true project cost.

Reference
Electricity Generation Licence Variation - South Australian Water Corporation (low confidence)
Source recorded 04 Jun 2026

Fixed OPEX (annual)

How this was derived
Program-level investment statement only; no site-specific O&M figure found.

Reference
Energy management (low confidence)
Source recorded 04 Jun 2026

Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

How this was derived
Technical source confirms tracking configuration, but the excerpt retrieved did not expose a usable solar PV O&M line item in the accessible text.

Reference
2024 Energy Technology Cost and Parameters Review (medium confidence)
Source recorded 04 Jun 2026

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2019 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 04 Jun 2026

Notes
Plant-specific greenfield capex was not found; capex uses the only site-specific reported figure located in the planning report, which states the cost of the proposed Mannum PPS.3 solar PV development is more than $4 million. This likely refers to the broader Crown Development application rather than an exact final project cost, so capex is a lower-bound proxy and should be reviewed. SA Water’s Zero Cost Energy Future program states the utility is investing more than $300 million across 154 MW of solar PV at 30+ sites, but that is program-level, not site-specific. The site is registered as 12.4 MW AC in ESCOSA licence material with 42,672 x 380W panels and single-axis tracking.

Sources