Loy Yang B (LOYYB1)

Coal · Gippsland Power Pty Ltd ABN 30 077 851 079 / LYB Ventures Australia Pty Ltd ABN 57 055 984 499 / Traralgon Power Pty Ltd ABN 64 056 292 623 / Latrobe Power Pty Ltd ABN 42 055 983 563 / LYB Australia Limited ABN 87 055 563 785 · Turbine - Steam Sub Critical

Operational AEMO: In Service VIC1 Fossil - Brown Coal NEM data · 24 hours
580 MW
Registered nameplate capacity
24 hours revenue
$572.1k
Capacity factor
80.4%
Revenue / MWh
$51.15
Est. SRMC
$47.20/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
580 MW

AEMO status In Service
Project status Operational (AI)

GlobalData/Power Technology 2024: Loy Yang B entered commercial operation in 1993 and is currently active.

Region VIC1
Coordinates -38.27300, 146.38400 (AI)

Alinta Energy website: Loy Yang B Power Station is located in the Latrobe Valley, 160km east of Melbourne, Victoria.

MLF 0.9815
DUID LOYYB1
Owner Gippsland Power Pty Ltd ABN 30 077 851 079 / LYB Ventures Australia Pty Ltd ABN 57 055 984 499 / Traralgon Power Pty Ltd ABN 64 056 292 623 / Latrobe Power Pty Ltd ABN 42 055 983 563 / LYB Australia Limited ABN 87 055 563 785
Commissioned
Expected closure 2047
Closure date
Technology Turbine - Steam Sub Critical
Fuel Fossil - Brown Coal
Steam turbine OEM Mitsubishi Power
Turbine / boiler supplier Steam turbine / boiler supplier
Equipment confidence high
Stats window
13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST

Dispatch & revenue

13 Jun 2026 09:20 → 14 Jun 2026 09:20 AEST

Energy revenue (× MLF)
$572.1k
FCAS revenue (× MLF)
$611
FCAS volume
452.8 MWh
Dispatched
11,185.8 MWh
Available
10,968.7 MWh
Curtailed
655.7 MWh
Curtailment
6.0%
of available
MLF used
0.9815
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9809
2025-07-01 0.9815

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Brown coal
Capacity
580 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$47.20/MWh
Capex total (greenfield) default
$1,624.00M

Shown in table
$1,624.00M (2026 real AUD)

Capex refurbishment
Capex / MW default
$2,800,000

Shown in table
$2.80M (2026 real AUD)

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$50,000

Shown in table
$50.0k (2026 real AUD)

Variable OPEX / MWh default
$3.50

Shown in table
$3.50 (2026 real AUD)

Fuel cost / GJ default
$3.80

Shown in table
$3.80 (2026 real AUD)

Heat rate GJ/MWh default
11.50

Shown in table
$11.50 (2026 real AUD)

Confidence: unknown · Status: needs review · Capex basis: unknown