Lincoln Gap Wind Farm - Stage 2 (LGAPWF2)

Wind · Lincoln Gap Wind Farm Pty Ltd · Wind Turbine - Onshore

In Service SA1 Wind - Wind NEM data · 24 hours
86 MW
Registered nameplate capacity
24 hours revenue
$26.3k
Capacity factor
49.3%
Revenue / MWh
$25.77
Est. SRMC
$0.50/MWh
MLF
0.9689

Stats window 03 Jun 2026 16:20 → 04 Jun 2026 16:20 AEST

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
86 MW
Status In Service
Lifecycle Operating
Region SA1
DUID LGAPWF2
Owner Lincoln Gap Wind Farm Pty Ltd
Commissioned Feb 2022
Expected closure 2025-07-02
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM
Turbine model

Dispatch & revenue

03 Jun 2026 16:20 → 04 Jun 2026 16:20 AEST

Revenue (× MLF)
$26.3k
Dispatched
1,021.7 MWh
Available
894.8 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9689
end of period

Revenue (× MLF)

Estimated $ per interval using regional RRP and MLF effective on each day.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF. Chart uses MLF effective on each interval’s date; summary total uses MLF as at the end of the selected period (same as the revenue list).
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9576
2025-07-01 0.9689

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
86 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.50/MWh
Capex total (greenfield)
Capex refurbishment
Capex / MW default
$2,200,000
Capex / MWh storage
Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000
Variable OPEX / MWh default
$0.50
Fuel cost / GJ
Heat rate GJ/MWh

Confidence: unknown · Status: needs review · Capex basis: unknown