Lake Bonney 2 Wind Farm (LKBONNY2)

Wind · Lake Bonney Wind Power Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service SA1 Wind - Wind NEM data · 24 hours
159 MW
Registered nameplate capacity
24 hours revenue
$36.8k
Capacity factor
21.3%
Revenue / MWh
$45.28
Est. SRMC
$0.86/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
159 MW

AEMO status In Service
Project status Operational (AI)

Iberdrola Australia asset page says the Lake Bonney Wind Farms are operating renewable energy assets and that the final stage commenced operations; GlobalData notes the project is currently active.

Region SA1
Coordinates -37.77700, 140.40700 (AI)

Iberdrola Australia says the wind farms are on the Woakwine Range near Millicent, South Australia; GEO/Open Infrastructure Map place Lake Bonney wind farm in that area.

MLF 0.9297
DUID LKBONNY2
Owner Lake Bonney Wind Power Pty Ltd
Commissioned
Expected closure 2038
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V66-1.75 MW / V90-3.0 MW
Equipment confidence high
Stats window
13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST

Dispatch & revenue

13 Jun 2026 08:45 → 14 Jun 2026 08:45 AEST

Energy revenue (× MLF)
$36.8k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
812.9 MWh
Available
812.6 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9297
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9709
2025-07-01 0.9297

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
159 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.86/MWh
Capex total (greenfield)
$684.93M

Shown in table
$684.93M (2026 real AUD)

Reported / source value
$400.00M (2006 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reports the Stage 2 Lake Bonney project cost at $400 million, matching the 159 MW LKBONNY2 capacity.

Reference
$400m wind farm agreements finalised (high confidence)
Source recorded 09 Jun 2026

Capex refurbishment
Capex / MW derived
$4,307,745

Shown in table
$4.31M (2026 real AUD)

Reported / source value
$2.52M (2006 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

Variable OPEX / MWh
$0.86

Shown in table
$0.86 (2026 real AUD)

Reported / source value
$0.50 (2006 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 09 Jun 2026

Notes
Project-specific greenfield capex found in contemporaneous reporting for Lake Bonney Stage 2: $400 million for 53 turbines / 159 MW. This is used for LKBONNY2. O&M is not separately reported in the sources reviewed; internal default fixed O&M was not used because the request prioritised source-backed information and no plant-specific O&M figure was found. Lake Bonney 2 is part of the broader Lake Bonney wind farm complex, but the $400 million figure aligns with the 159 MW Stage 2 project.

Sources