Lake Bonney 1 Wind Farm (LKBONNY1)

Wind · Lake Bonney Wind Power Pty Ltd · Wind Turbine - Onshore

Operational AEMO: In Service SA1 Wind - Wind NEM data · 24 hours
81 MW
Registered nameplate capacity
24 hours revenue
$3.8k
Capacity factor
4.1%
Revenue / MWh
$48.56
Est. SRMC
$0.79/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.

Key information
Capacity
81 MW

AEMO status In Service
Project status Operational (AI)

Iberdrola Australia asset page (operating) and project history notes final stage commenced operations in July 2010.

Region SA1
Coordinates -37.77050, 140.40660 (AI)

Iberdrola Australia states the wind farms are on the Woakwine Range about 2 km from the eastern shore of Lake Bonney near Millicent; GEO lists Lake Bonney stage 1 at -37.7712, 140.4066.

MLF 0.9297
DUID LKBONNY1
Owner Lake Bonney Wind Power Pty Ltd
Commissioned
Expected closure 2035
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V66 / V90
Equipment confidence high
Stats window
12 Jun 2026 22:30 → 13 Jun 2026 22:30 AEST

Dispatch & revenue

12 Jun 2026 22:30 → 13 Jun 2026 22:30 AEST

Energy revenue (× MLF)
$3.8k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
78.8 MWh
Available
404.7 MWh
Curtailed
404.7 MWh
Curtailment
100.0%
of available
MLF used
0.9297
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9709
2025-07-01 0.9297

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
81 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.79/MWh
Capex total (greenfield)
$278.46M

Shown in table
$278.46M (2026 real AUD)

Reported / source value
$177.10M (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
$50.26M

Shown in table
$50.26M (2026 real AUD)

Reported / source value
$38.00M (2018 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Confirms total battery project cost, separate from wind farm capex.

Reference
Lake Bonney Battery Energy Storage System (high confidence)
Source recorded 09 Jun 2026

Capex / MW derived
$3,459,120

Shown in table
$3.46M (2026 real AUD)

Reported / source value
$2.20M (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$55,000

Shown in table
$55.0k (2026 real AUD)

How this was derived
Indicates an O&M contract existed but does not disclose cost.

Reference
Wind Farm Profile - Lake Bonney 1 (medium confidence)
Source recorded 09 Jun 2026

Variable OPEX / MWh
$0.79

Shown in table
$0.79 (2026 real AUD)

Reported / source value
$0.50 (2009 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Server-side fallback retained because no plant-specific variable O&M was found.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026

Notes
No reliable plant-specific greenfield construction cost for Lake Bonney 1 (80.5 MW stage 1) was found in the searched official/developer/government sources. The only clearly sourced project cost found was the separate 2018 Lake Bonney Battery Energy Storage System upgrade at A$38 million, which should not be treated as wind-farm greenfield capex. Stage 1 commissioned in March 2005.