Wind · Lake Bonney Wind Power Pty Ltd · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
12 Jun 2026 14:05 → 13 Jun 2026 14:05 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9709 |
| 2025-07-01 | 0.9297 |
| Capex total (greenfield) |
$278.46M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
$50.26M
Shown in table Reported / source value How this was derived Reference |
| Capex / MW derived |
$3,459,120
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table How this was derived Reference |
| Variable OPEX / MWh |
$0.79
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026
Notes
No reliable plant-specific greenfield construction cost for Lake Bonney 1 (80.5 MW stage 1) was found in the searched official/developer/government sources. The only clearly sourced project cost found was the separate 2018 Lake Bonney Battery Energy Storage System upgrade at A$38 million, which should not be treated as wind-farm greenfield capex. Stage 1 commissioned in March 2005.