Kiamal Solar Farm - Stage 1 (KIAMSF1)

Solar · KSF Project Nominees Pty Ltd ATF KSF Project Trust · Solar PV - Single axis tracking

Operational AEMO: In Service VIC1 Solar - Solar NEM data · 30 days
200 MW
Registered nameplate capacity
30 days revenue
$648.1k
Capacity factor
9.9%
Revenue / MWh
$45.61
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
200 MW

AEMO status In Service
Project status Operational (AI)

TotalEnergies Australia page (2026) describes Kiamal Solar Farm Phase 1 as an operating asset / in operation.

Region VIC1
Coordinates -35.02050, 142.30020 (AI)

Global Energy Monitor cites OpenNEM / Kiamal Solar Farm site data for Stage 1 coordinates (-35.0205, 142.3002).

MLF 0.8785
DUID KIAMSF1
Owner KSF Project Nominees Pty Ltd ATF KSF Project Trust
Commissioned Jan 2022
Expected closure 2049
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM Longi
Module / inverter supplier Module / inverter supplier
Inverter OEM Sungrow
Inverter model inverter model not documented
Equipment confidence low
Stats window
15 May 2026 02:50 → 14 Jun 2026 02:50 AEST

Dispatch & revenue

15 May 2026 02:50 → 14 Jun 2026 02:50 AEST

Energy revenue (× MLF)
$648.1k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
14,208.4 MWh
Available
16,955.4 MWh
Curtailed
2,801.7 MWh
Curtailment
16.5%
of available
MLF used
0.8785
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.8363
2025-07-01 0.8785

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
200 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$266.33M

Shown in table
$266.33M (2026 real AUD)

Reported / source value
$259.94M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,331,967

Shown in table
$1.33M (2026 real AUD)

Reported / source value
$1.30M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$2.56M

Shown in table
$2.56M (2026 real AUD)

Reported / source value
$2.50M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$12,807

Shown in table
$12.8k (2026 real AUD)

Reported / source value
$12.5k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Used as a proxy for solar tracking O&M because no Kiamal-specific O&M disclosure was found.

Reference
2025 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 09 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Proxy inference: solar PV variable O&M is effectively nil in the cited AEMO case.

Reference
2025 Energy Technology Cost and Technical Parameter Review (low confidence)
Source recorded 09 Jun 2026

Fuel cost / GJ
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 09 Jun 2026

Notes
No plant-specific greenfield capex figure was found in searched owner/developer/government sources. Capex therefore remains unfilled rather than using an AEMO benchmark. For operating assumptions, AEMO's 2025 draft Energy Technology Cost and Technical Parameter Review gives utility-scale solar PV fixed O&M of $12,500/MW DC/year for a 20-40 MW distribution-scale case; this was used as a proxy because no Kiamal-specific O&M disclosure was found. Total annual fixed O&M is scaled from per-MW value by the site capacity (199.95 MW). Solar PV has no fuel cost and no heat rate. The 2025 AEMO report is draft and should be treated cautiously.

Sources