Kerang Hybrid (KERNGSP1)

Solar · Kerang Power Pty Ltd · Solar PV - Single axis tracking

Development AEMO: Publicly Announced VIC1 Solar - Solar NEM data · 3h
161/110 MW
Researched capacity / storage
3h revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$0.26/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity (AI)
161 MW / 110 MWh

CleanGen project page (2026) lists 161 MW solar and 55 MW/110 MWh BESS for Kerang Hybrid.

AEMO status Publicly Announced
Project status Development (AI)

CleanGen project page (2026) describes Kerang Hybrid as in development / current stage before ready-to-build and construction.

Region VIC1
Coordinates -35.73000, 143.93000 (AI)

CleanGen project page provides location as Kerang, Victoria but no precise coordinates were available in the provided results.

MLF 0.9311
DUID KERNGSP1
Owner Kerang Power Pty Ltd
Commissioned Dec 2027
Expected closure 2056
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Equipment confidence medium
Stats window
20 Sep 2026 00:00 → 20 Sep 2026 03:25 AEST

Dispatch & revenue

20 Sep 2026 00:00 → 20 Sep 2026 03:25 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9311
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-12-10 0.8964
2025-07-01 0.9329
2026-07-01 0.9311

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
161 MW / 110 MWh
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.26/MWh
Capex total (greenfield)
$239.19M

Shown in table
$239.19M (2026 real AUD)

Reported / source value
$233.45M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Calculated benchmark capex total for the solar component only.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (medium confidence)
Source recorded 09 Jun 2026

Capex refurbishment
Capex / MW derived
$1,485,656

Shown in table
$1.49M (2026 real AUD)

Reported / source value
$1.45M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark capex used because no plant-specific investment figure was found.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 09 Jun 2026

Fixed OPEX (annual)
$1.98M

Shown in table
$1.98M (2026 real AUD)

Reported / source value
$1.93M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$12,295

Shown in table
$12.3k (2026 real AUD)

Reported / source value
$12.0k (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Benchmark fixed O&M per MW-year used for the solar component.

Reference
2024 Energy Technology Cost and Technical Parameter Review Report - Solar (high confidence)
Source recorded 09 Jun 2026

Variable OPEX / MWh
$0.26

Shown in table
$0.26 (2026 real AUD)

Reported / source value
$0.25 (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
No plant-specific variable O&M source was found; retained internal fallback.

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: estimated · AI checked 09 Jun 2026

Notes
No plant-specific greenfield investment announcement for Kerang Hybrid was found in the searched owner/government sources. Capex and O&M therefore use AEMO/Aurecon benchmark assumptions for a utility-scale solar PV ground-mount project, applied to the 161 MW DC solar component. The project page states Kerang Hybrid is a proposed 161 MW DC solar farm with a 55 MW/110 MWh battery and construction targeted to commence in late 2025; the benchmark source indicates single-axis tracking systems have higher capital and maintenance requirements than fixed-tilt systems. The calculated capex_per_mw_aud is based on the benchmark relative cost of $1.45/W DC for the 20 MW ground-mount solar PV case, and fixed OPEX is set at $12,000/MW-yr from the same benchmark table.