Kaban Wind Farm (KABANWF1)

Wind · Kaban Wind Farm Trust · Wind Turbine - Onshore

Operational AEMO: In Commissioning QLD1 Wind - Wind NEM data · 24 hours
157 MW
Registered nameplate capacity
24 hours revenue
$77.4k
Capacity factor
43.0%
Revenue / MWh
$47.86
Est. SRMC
$0.00/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.

Key information
Capacity
157 MW

AEMO status In Commissioning
Project status Operational (AI)

Power Technology / GlobalData profile (2024) indicates the project was expected to enter commercial operation in Oct 2022; project website indicates Kaban Green Power Hub is delivered and operating.

Region QLD1
Coordinates -17.52200, 145.64500 (AI)

Kaban Green Power Hub website and project materials for Far North Queensland site (kabangreenpowerhub.com.au).

MLF 0.9696
DUID KABANWF1
Owner Kaban Wind Farm Trust
Commissioned Apr 2023
Expected closure 2048
Closure date
Technology Wind Turbine - Onshore
Fuel Wind - Wind
Turbine OEM Vestas
Turbine model V162-5.6
Equipment confidence high
Stats window
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Dispatch & revenue

13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST

Energy revenue (× MLF)
$77.4k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
1,617.7 MWh
Available
1,617.7 MWh
Curtailed
MWh
Curtailment
0.0%
of available
MLF used
0.9696
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9605
2025-07-01 0.9696

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Wind (onshore)
Capacity
157 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.00/MWh
Capex total (greenfield)
$460.20M

Shown in table
$460.20M (2026 real AUD)

Reported / source value
$370.00M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Reported total project cost for the Kaban Green Power Hub, which includes the 157 MW wind farm.

Reference
Neoen completes financing for 157 MW Kaban Green Power Hub in Australia (high confidence)
Source recorded 08 Jun 2026

Capex refurbishment
Capex / MW derived
$2,934,943

Shown in table
$2.93M (2026 real AUD)

Reported / source value
$2.36M (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Derived per-MW capex from the reported total project cost and the DUID capacity provided by the user.

Reference
Neoen completes financing for 157 MW Kaban Green Power Hub in Australia (high confidence)
Source recorded 08 Jun 2026

Fixed OPEX (annual)
$5.66M

Shown in table
$5.66M (2026 real AUD)

Reported / source value
$4.55M (2021 nominal)
Table total may differ if recalculated from $/MW × registered capacity after CPI adjustment.

Fixed OPEX / MW-yr
$36,070

Shown in table
$36.1k (2026 real AUD)

Reported / source value
$29.0k (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
AEMO/GHD onshore wind fixed O&M benchmark used as the operating cost assumption.

Reference
2025 Energy Technology Cost and Technical Parameter Report (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$0.00

Shown in table
$0.00 (2026 real AUD)

Reported / source value
$0.00 (2021 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The source states variable O&M is included in the fixed component for onshore wind.

Reference
2025 Energy Technology Cost and Technical Parameter Report (high confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: high · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026

Notes
Plant-specific reported total project cost found for the 157 MW Kaban Green Power Hub: approximately A$370 million. Kaban Wind Farm DUID capacity is 156.8 MW, so per-MW capex is calculated from the reported total and the registered capacity. No refurbishment cost identified. Fixed O&M uses AEMO/GHD 2025 onshore wind estimate of A$29,000/MW/year; variable O&M is included in fixed component in that source.

Sources