Gas Peakers · EnergyAustralia Ecogen Pty Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
07 Jun 2026 02:20 → 14 Jun 2026 02:20 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9789 |
| 2025-07-01 | 0.9768 |
| Capex total (greenfield) |
$96.20M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,265,823
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$45,000
Shown in table |
| Variable OPEX / MWh default |
$2.50
Shown in table |
| Fuel cost / GJ default |
$12.00
Shown in table |
| Heat rate GJ/MWh default |
10.50
Shown in table |
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield capex announcement was found for Jeeralang B (JLB01). Public sources identify Jeeralang as an existing gas-fired station with seven OCGTs and a 450 MW total site capacity, and indicate the station was commissioned in 1979/around 1979-1980; however, they do not provide a site-specific original construction cost for the JLB01 unit. Because no verified plant-level capex or refurbishment cost was located, financial and operating assumptions remain unfilled pending further review.