Gas Peakers · EnergyAustralia Ecogen Py Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
13 Jun 2026 06:20 → 14 Jun 2026 06:20 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9789 |
| 2025-07-01 | 0.9768 |
| Capex total (greenfield) |
$87.85M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,657,459
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$1.07M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$20,104
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$12.20
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ default |
$12.00
Shown in table |
| Heat rate GJ/MWh |
13.75
Shown in table How this was derived Reference |
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield capex announcement was found for Jeeralang A/JLA04. The plant is an existing asset commissioned in 1979, so a construction cost is not readily inferable from public owner disclosures. O&M and heat-rate values were taken from AEMO heat-rate / benchmark material for Jeeralang A, but fuel price, emissions intensity, asset life, and capex remain unverified for this specific unit.