Jeeralang A (JLA01)

Gas Peakers · EnergyAustralia Ecogen Py Ltd · Turbine - OCGT

Operational AEMO: In Service VIC1 Fossil - Natural Gas Pipeline NEM data · 24 hours
53 MW
Registered nameplate capacity
24 hours revenue
$0
Capacity factor
0.0%
Revenue / MWh
Est. SRMC
$135.55/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
53 MW

AEMO status In Service
Project status Operational (AI)

EnergyAustralia site describes Jeeralang as a peaking power station in service; AEMO status is In Service (energyaustralia.com.au).

Region VIC1
Coordinates -38.27430, 146.42560 (AI)

Latitude.to / Jeeralang Power Station coordinates: -38.2743, 146.4256.

MLF 0.9768
DUID JLA01
Owner EnergyAustralia Ecogen Py Ltd
Commissioned
Expected closure 2039
Closure date
Technology Turbine - OCGT
Fuel Fossil - Natural Gas Pipeline
Gas turbine OEM
Turbine / engine model
Equipment confidence low
Stats window
12 Jun 2026 17:20 → 13 Jun 2026 17:20 AEST

Dispatch & revenue

12 Jun 2026 17:20 → 13 Jun 2026 17:20 AEST

Energy revenue (× MLF)
$0
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
MWh
Available
580.5 MWh
Curtailed
580.5 MWh
Curtailment
100.0%
of available
MLF used
0.9768
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2024-07-01 0.9789
2025-07-01 0.9768

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
OCGT
Capacity
53 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$135.55/MWh
Capex total (greenfield)
$67.09M

Shown in table
$67.09M (2026 real AUD)

Reported / source value
$63.60M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,265,823

Shown in table
$1.27M (2026 real AUD)

Reported / source value
$1.20M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
$2.52M

Shown in table
$2.52M (2026 real AUD)

Reported / source value
$2.39M (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX / MW-yr
$47,468

Shown in table
$47.5k (2026 real AUD)

Reported / source value
$45.0k (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
Provides the OCGT fixed O&M benchmark used.

Reference
2024 Energy Technology Cost and Technical Parameter Review (high confidence)
Source recorded 08 Jun 2026

Variable OPEX / MWh
$2.64

Shown in table
$2.64 (2026 real AUD)

Reported / source value
$2.50 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

How this was derived
The source excerpt was used only to confirm the technology section; the specific user-provided fallback value was retained because the exact OCGT line items were not fully captured in searchable text.

Reference
2024 Energy Technology Cost and Technical Parameter Review (medium confidence)
Source recorded 08 Jun 2026

Fuel cost / GJ
$12.66

Shown in table
$12.66 (2026 real AUD)

Reported / source value
$12.00 (2024 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Heat rate GJ/MWh
10.50

Shown in table
$10.50 (2026 real AUD)

How this was derived
No plant-specific heat rate found; fallback retained.

Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
No plant-specific greenfield capex announcement for Jeeralang A (JLA01) was found in source-backed search results. EnergyAustralia states Jeeralang was purchased in 2018 and is part of its peaking fleet, but this does not provide original construction cost. AEMO/Aurecon 2024 cost review was used only as a fallback for operating assumptions.