Gas Peakers · EnergyAustralia Ecogen Py Ltd · Turbine - OCGT
Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.
13 Jun 2026 00:00 → 13 Jun 2026 23:59 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9789 |
| 2025-07-01 | 0.9768 |
| Capex total (greenfield) |
$67.09M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,265,823
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$2.52M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$47,468
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$2.64
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
$12.66
Shown in table Reported / source value |
| Heat rate GJ/MWh |
10.50
Shown in table How this was derived |
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
No plant-specific greenfield capex announcement for Jeeralang A (JLA01) was found in source-backed search results. EnergyAustralia states Jeeralang was purchased in 2018 and is part of its peaking fleet, but this does not provide original construction cost. AEMO/Aurecon 2024 cost review was used only as a fallback for operating assumptions.