Other Generators · Snowy Hydro Ltd · Reciprocating Engine - Compression ignition
Dispatch target (cleared) vs availability — 5‑minute intervals. NSW1 regional price (RRP) on right axis.
13 Jun 2026 06:10 → 14 Jun 2026 06:10 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9896 |
| 2025-07-01 | 0.9931 |
| Capex total (greenfield) |
$32.91M
Shown in table Reported / source value |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,582,278
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$60,000
Shown in table |
| Variable OPEX / MWh default |
$8.00
Shown in table |
| Fuel cost / GJ default |
$25.00
Shown in table |
| Heat rate GJ/MWh default |
12.00
Shown in table |
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
Searches did not identify a project-specific construction/investment cost for HEZ1; therefore no capex was populated. Also did not identify reliable plant-specific operating assumptions. The only usable official material found was generic AEMO technology context for reciprocating engines and Snowy Hydro pages on its gas/diesel portfolio. Further review should target Snowy Hydro annual reports, asset registers, planning documents, and any NSW/AEMO connection papers specifically naming Hunter EconomicZone / HEZ1.