Solar · South Australian Water Corporation · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
14 May 2026 16:45 → 13 Jun 2026 16:45 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 1.0043 |
| 2025-07-01 | 1.0024 |
| Capex total (greenfield) |
$15.08M
Shown in table Reported / source value How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$1,371,308
Shown in table Reported / source value |
| Fixed OPEX (annual) |
$139.2k
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX / MW-yr |
$12,658
Shown in table Reported / source value How this was derived Reference |
| Variable OPEX / MWh |
$0.00
Shown in table Reported / source value |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026
Notes
I could not find a plant-specific greenfield construction cost from SA Water or government sources in the retrieved search results. SA Water sources confirm the Happy Valley solar project was planned as around 9-10 MW, later described as approximately 12 MW, and operating by late 2020/2022; the project appears to be part of SA Water's wider Zero Cost Energy Future rollout rather than a standalone published cost announcement. Because no reported project capex was found, capex remains null rather than using a benchmark as a reported figure. Fixed O&M is estimated from AEMO/Aurecon 2024 utility-scale solar PV assumptions and scaled to 11 MW.