Solar · Hamilton Solar Farm Pty Ltd · Solar PV - Single axis tracking
Dispatch target (cleared) vs availability — 5‑minute intervals. QLD1 regional price (RRP) on right axis.
14 May 2026 16:45 → 13 Jun 2026 16:45 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9305 |
| 2025-07-01 | 0.9385 |
| Capex total (greenfield) |
$166.89M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$2,902,468
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$20,000
Shown in table |
| Variable OPEX / MWh |
$18.64
Shown in table Reported / source value How this was derived Reference |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific greenfield project cost found for the combined Whitsunday/Hamilton solar portfolio in ARENA documentation: Whitsunday Solar Farm project cost $123.5m for 57.5MW, which is the best available reported project-level figure matched to this site's registered capacity. Hamilton Solar Farm is described by Edify as a 69.0MW DC single-axis tracking project and commenced operation in March/July 2018 depending on source. No separate Hamilton-only total project cost was found. Fixed O&M not extracted from the accessible source text; AEMO/Aurecon 2024 report provides a utility-scale solar O&M benchmark but the searchable excerpt here only exposed a combined fixed O&M value for another technology, so fixed O&M is left null pending review.