Wind · Goyder Wind Farm 1A Pty Ltd as trustee for Goyder Wind Farm 1A Trust · Wind Turbine - Onshore
Dispatch target (cleared) vs availability — 5‑minute intervals. SA1 regional price (RRP) on right axis.
06 Jun 2026 23:40 → 13 Jun 2026 23:40 AEST
Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.
UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.dispatch_price RRP matched by settlement time and NEM region (from generator registry).DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.| Effective from | MLF |
|---|---|
| 2024-07-01 | 0.9643 |
| 2025-07-01 | 0.9697 |
| Capex total (greenfield) |
$3,504.67M
Shown in table Reported / source value How this was derived Reference |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW derived |
$16,768,770
Shown in table Reported / source value How this was derived Reference |
| Fixed OPEX (annual) |
$12.55M
Shown in table Reported / source value |
| Fixed OPEX / MW-yr |
$60,044
Shown in table Reported / source value How this was derived |
| Variable OPEX / MWh |
$0.55
Shown in table Reported / source value How this was derived |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: medium · Status: ai estimated · Capex basis: reported · AI checked 08 Jun 2026
Notes
Plant-specific public sources located for the broader Goyder South project indicate total investment of up to A$3 billion for the full Stage 1/precinct, which includes the 209 MW Stage 1A tranche. No source found giving a separate 209 MW-only greenfield capex for GSWF1A, so the reported project-level figure was used as the best available proxy. Onshore wind O&M and technical assumptions were taken from AEMO/Aurecon GenCost 2024 review; wind has no fuel cost, heat rate, or direct combustion emissions.