Goorambat East Solar Farm (ENGIE) (GOESF1)

Solar · Engie · Solar PV - Single axis tracking

Development AEMO: Committed VIC1 Solar - Solar NEM data · 24 hours
250 MW
Registered nameplate capacity
24 hours revenue
$4.6k
Capacity factor
9.9%
Revenue / MWh
$7.78
Est. SRMC
$0.25/MWh

Energy flow

Dispatch target (cleared) vs availability — 5‑minute intervals. VIC1 regional price (RRP) on right axis.

Key information
Capacity
250 MW

AEMO status Committed
Project status Development (AI)

Region VIC1
Coordinates

MLF 0.9261
DUID GOESF1
Owner Engie
Commissioned Oct 2026
Expected closure 2061
Closure date
Technology Solar PV - Single axis tracking
Fuel Solar - Solar
Module OEM
Module / inverter supplier
Inverter OEM
Inverter model
Stats window
21 Jul 2026 19:50 → 22 Jul 2026 19:50 AEST

Dispatch & revenue

21 Jul 2026 19:50 → 22 Jul 2026 19:50 AEST

Energy revenue (× MLF)
$4.6k
FCAS revenue (× MLF)
$0
FCAS volume
MWh
Dispatched
592.6 MWh
Available
MWh
Curtailed
MWh
Curtailment
of available
MLF used
0.9261
end of period

Revenue (× MLF)

Estimated $ per interval — energy (RRP) and FCAS (regional FCAS prices), both × MLF.

Methodology & assumptions

  • Dispatch & availability — AEMO Next Day Dispatch UNIT_SOLUTION (5‑minute intervals). Intervention intervals excluded.
  • Regional pricedispatch_price RRP matched by settlement time and NEM region (from generator registry).
  • Energy revenue (× MLF) — cleared MW × (5/60 h) × RRP × MLF.
  • FCAS revenue & volume — cleared FCAS MW from DISPATCHLOAD (raise/lower 6s, 60s, 5min, reg) × (5/60 h) × regional FCAS price × MLF. Volume is total FCAS enablement MWh across services.
  • State of chargeINITIAL_ENERGY_STORAGE (MWh at interval start) from UNIT_SOLUTION, published for bidirectional/storage units. Next-day data — the SOC line lags real time by up to a day.
  • Curtailment — estimated economic curtailment when availability exceeds dispatch target: max(0, availability − cleared) × (5/60) MWh.
  • Not settlement — estimates only. AEMO settlement applies DLF, rebids, constraints, and other factors not modelled here.
MLF history (AEMO daily)
Effective fromMLF
2025-09-30 0.9328
2026-07-01 0.9261

Financial overview

2026 real AUD. Monetary values are CPI-adjusted to 2026 real Australian dollars. Greenfield capex uses AEMO benchmarks when plant-specific cost is unknown.
Type
Solar (tracking)
Capacity
250 MW
Revenue (× MLF) (stats)
See dispatch stats link above
Est. SRMC
$0.25/MWh
Capex total (greenfield)
$332.99M

Shown in table
$332.99M (2026 real AUD)

Reported / source value
$325.00M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Capex refurbishment
Capex / MW derived
$1,331,967

Shown in table
$1.33M (2026 real AUD)

Reported / source value
$1.30M (2025 nominal)
Adjusted to 2026 real AUD using Australian CPI (All Groups).

Fixed OPEX (annual)
Fixed OPEX / MW-yr default
$20,000

Shown in table
$20.0k (2026 real AUD)

Variable OPEX / MWh default
$0.25

Shown in table
$0.25 (2026 real AUD)

Fuel cost / GJ
Heat rate GJ/MWh

Confidence: medium · Status: ai estimated · Capex basis: default · AI checked 08 Jun 2026

Notes
ENGIE’s project page confirms Goorambat East Solar Farm is a 250 MW single-axis tracking solar farm under construction in Victoria, with construction completion expected in 2026 and generation expected in 2027. No project-specific total investment/capex figure was found in the searched owner/government sources, so capex is left null rather than substituting an AEMO benchmark. For operating assumptions, the available source only confirms SAT configuration and typical utility-scale PV performance context; no plant-specific O&M or fuel data were found. Asset life set to a typical solar project planning assumption of ~30 years; use with caution.